These Terms and Conditions are for energy-efficient product rebates only. Find Backup Power Generator for Well Water Pump rebate Terms and Conditions.



  1. To be eligible for a rebate in accordance with this application, I must be a customer of Pacific Gas and Electric Company (PG&E) with an active meter and be installing a qualified product(s). Customers who are part of a third party program such as Community Choice Aggregation (CCA), Core Gas Aggregation Service (CGAS) or Direct Access (DA) also qualify as long as all other eligibility requirements are met. All references to the term "install, installation or similar phrases" shall mean that the product is completely installed and is entirely functional and operational.
  2. I understand for each product installed the requirement is to complete a separate application for each individual address and Service ID number.
  3. I understand the rebate availability term is from January 1, 2022 through December 31, 2022 ("Term"). The Term may be extended upon approval by the California Public Utilities Commission (CPUC). To qualify for a rebate, these conditions must be satisfied: 1) this Application must be submitted to PG&E within 60 days of the qualifying Product purchase date; and 2) Products must be installed no later than December 31, 2022; and 3) the Application submitted complies with the Application's terms and conditions; and 4) Rebate funding is still available given it is depleted on a first-come, first serve basis.
  4. Rebate offerings and rebate amounts may change without notice during the Term. Resale products, rebuilt, rented or leased less than five years, received from warranty or insurance claims, exchanged, won as a prize, purchased with rewards, or new parts installed in existing products,do not qualify for any rebate. The terms and the application requirements may be modified or terminated without prior notice. Complete applications must be submitted to PG&E within 60 days of purchase, according to application instructions.
  5. I understand only complete applications can be processed for rebates. Failure to submit a complete application may result in rejection of a filed application. Complete applications must include all required application information, an electronic signature, proof(s) of purchase and other required documentation for all products as referenced in this application. Original applications will become the property of PG&E. Neither PG&E nor its authorized third party will be responsible for items lost or destroyed in transit through the mail or electronic medium.
  6. I will allow, if requested, a representative from PG&E, the CPUC, or any PG&E authorized third party reasonable access to my property to verify the installed product before a rebate is paid. I understand a rebate will not be paid if I refuse to participate in any required verification that is scheduled within 30 days of PG&E or its authorized third party contacting me. PG&E or its authorized third party may contact the product vendor and/or installer, if needed, to verify purchase and/or installation and may provide my name and/or address to third parties to complete this verification.
  7. I certify that I have installed product(s) in accordance with all applicable federal, state, and local laws, building codes, manufacturer's specifications, and permitting requirements. If a contractor performed the installation or improvement, the contractor holds the appropriate license for the work performed.
  8. I understand the rebate amount cannot exceed the purchase price of the product, nor can it include taxes or shipping costs. PG&E reserves the right to limit the number of products rebated.
  9. I understand I cannot receive a rebate for the same product(s) from more than one California investor-owned utility or other rebates funded through CPUC authorized energy efficiency funds. Products discounted by PG&E at the point of sale are not eligible for additional rebates.
  10. PG&E MAKES NO REPRESENTATION OR WARRANTY, AND ASSUMES NO LIABILITY WITH RESPECT TO QUALITY, SAFETY, PERFORMANCE, OR OTHER ASPECT OF ANY DESIGN, SYSTEM PRODUCT OR APPLIANCE INSTALLED PURSUANT TO THIS AGREEMENT, AND EXPRESSLY DISCLAIMS ANY SUCH REPRESENTATION, WARRANTY OR LIABILITY. I AGREE TO INDEMNIFY PG&E, ITS AFFILIATES, SUBSIDIARIES, PARENT COMPANY, OFFICERS, DIRECTORS, AGENTS, AND EMPLOYEES AGAINST ALL LOSS, DAMAGE, EXPENSE, FEES, COSTS AND LIABILITY ARISING FROM ANY CLAIMS RELATED TO ANY PRODUCTS INSTALLED OR SERVICES PERFORMED DURING THE INSTALLATION OR MAINTENANCE OF SUCH PRODUCTS.
  11. If I am a tenant, I am responsible for obtaining the property owner's permission to install product(s) for which I am applying for a rebate. My signature on this application indicates I have obtained this permission.
  12. If I am applying for measure TOU96, I understand that PG&E will change my rate schedule to Time-of-Use (Peak Pricing 4-9 p.m. Every Day)(TOU-C) if I am not already enrolled in an Electric Time-of-Use rate plan. The change will be effective within 1-2 billing cycles. Please note, customers on NEM 1.0 will be "Trued-up" at the time of the rate plan change. This will occur even if the rate plan change occurs before the end of their annual billing cycle.
  13. If I am applying for measure TOU96 and provide a Gas Service Agreement ID, I understand that PG&E will apply any changes in my rate schedule to the Electric Service Agreement at the same premise. If an Electric Service Agreement is not easily identifiable, PG&E may reject your application.