PG&E is issuing the Oakland Clean Energy Initiative (OCEI) Request for Offers (RFO) on behalf of itself and East Bay Community Energy (EBCE), to develop an innovative solution to meet Oakland's transmission reliability needs ("OCEI Need") through the development of preferred energy resources within the local community.
As part of the California Independent System Operator's (CAISO) 2017-2018 transmission planning process, PG&E proposed a combination of substation upgrades and preferred resources to address the OCEI Need absent local fossil-fired generation. The OCEI RFO focuses on the development of such preferred resources to mitigate contingency overloads in the local sub-area.
The PG&E and East Bay Community Energy solicitation will competitively source a portfolio of local clean resources such as renewable generation, energy storage and energy efficiency.
Event | Date/Time | |
---|---|---|
Issuance of RFO |
April 13, 2018 |
|
Deadline to confirm site visit attendance at Oakland C and Oakland L Substations for Participants submitting utility-ownership offers |
April 30, 2018, 12 PM (PPT) |
|
Participants encouraged to submit signed Confidentiality Agreement for Utility-Ownership Offers (Attachment D1) for access to additional PG&E-owned site data |
April 27, 2018, 5 PM (PPT) |
|
Site visit to Oakland C and Oakland L for Participants submitting utility-ownership offers |
May 3, 2018 |
|
Deadline to RSVP for PG&E/EBCE-hosted Participants' Conference/Webinar (required for in-person attendance only) |
May 7, 2018, 12 PM (PPT) |
|
PG&E/EBCE-hosted Participants' Conference/Webinar |
May 9, 2018, 1 - 3 PM (PPT) |
|
Deadline for Participants to submit offers via Power Advocate |
June 15, 2018, 1 PM (PPT) |
|
PG&E seeks additional utility-owned energy storage offers |
August 20, 2018 |
|
Utility-Ownership Only: Deadline to RSVP for 9/6 webcast and submit signed Confidentiality Agreement (required for participation) |
September 5, 2018, 4PM (PPT) |
|
Utility-Ownership Only: PG&E webcast review of scope changes and additional utility-ownership documents uploaded to Power Advocate (link sent upon RSVP confirmation) |
September 6, 2018, 10 AM (PPT) |
|
Utility-Ownership Only: Deadline to RSVP for 9/11 site walk at Oakland C Substation |
September 10, 2018, 12 PM (PPT) |
|
Utility-Ownership Only: Site walk at Oakland C Substation |
September 11, 2018 |
|
Non-Utility Ownership Participants notified of eligibility for Shortlisted offer negotiations |
September 14, 2018 |
|
Deadline for notified Non-Utility Ownership Shortlisted Participants to accept Shortlist status |
September 21, 2018, 5 PM (PPT) |
|
Negotiations with Non-Utility Ownership Shortlisted Participants begin |
October 2018 |
|
Utility-Ownership Only: Deadline for Participants to submit additional utility-ownership offers via Power Advocate |
October 15, 2018, 1 PM (PPT) |
|
Utility-Ownership Only: Utility-Ownership Participants notified of eligibility for Shortlisted offer negotiations |
November 9, 2018 |
|
PG&E submits Agreements for CPUC Approval; EBCE submits Agreements for EBCE Board Approval |
March 2019 |
PG&E is seeking additional offers in the 2018 OCEI RFO solicitation for utility-ownership (UO) offers for CAISO-approved energy storage as a dedicated transmission asset. PG&E is requiring a base offer with a minimum project size of 10MW / 40MWh at Oakland C Substation. In addition to the required base offer, Participants may submit up to five alternate offers for storage capacities greater than 10MW / 40MWh up to 20MW / 120MWh. PG&E is not accepting additional offers at Oakland L Substation. Offers are due Monday, October 15th, 2018 at 1 PM (PPT) via Power Advocate. Note, additional third party offers will not be accepted. The timeline for review and shortlisting of the third party ownership offers will not be affected.
Important: Updated site and scope documents, drawings, etc. have been uploaded to Power Advocate. In order to access these documents, please be sure to 1) register in Power Advocate for new bid event OCEI RFO- Seeking Additional Offers for Utility Ownership Energy Storage Only (Bid Event 83772) and 2) have a signed PG&E Confidentiality Agreement. All parties will be eligible to submit a UO offer regardless of whether or not an offer was submitted on June 15th, 2018. To expedite the process, PG&E recommends submission of a signed Confidentiality Agreement as early as possible, if one has not been previously submitted.
Webcast: There will be a webcast on Thursday, September 6th, 2018 at 10 AM (PPT) to review the scope changes and additional utility-ownership documents uploaded to Power Advocate. To RSVP, email OCEI_RFO@pge.com and CC independent evaluator, jonathan.jacobs@paconsulting.com, with subject line 'OCEI: RSVP 9/6 UO Webcast' to confirm attendance (webcast link will be sent upon RSVP confirmation). The extended deadline to RSVP for the webcast and to submit a signed Confidential Agreement, which will be required for participation, is Wednesday, September 5th at 4 PM (PPT).
Site Walk at Oakland C Substation: PG&E is hosting a site walk on Tuesday, September 11th, 2018 starting at 9:30AM (PPT) or 11AM (PPT) at Oakland C Substation (100 Jefferson Street, Oakland, CA 94607) - assigned time to be confirmed via Email. During the site walk, vendors will be given the opportunity to see the new space/site configuration and have a Q&A discussion. To RSVP, Email OCEI_RFO@pge.com and CC independent evaluator, jonathan.jacobs@paconsulting.com, with subject line 'OCEI: RSVP 9/11 UO Site Walk' with list of names and Emails of the attendees included in the body of the Email. The deadline to RSVP for the site walk is Monday, September 10th at 12PM (PPT).
All site walk attendees must provide their own hard hat, safety glasses/goggles, fire retardant shirt and pants, safety boots, and safety vest. Site visit attendees that do not have the requisite personal protective equipment (PPE) will not be allowed to enter the substation site.
All Participants interested in submitting an offer package will need to pre-register with Power Advocate before submitting an Offer into the RFO. There will be separate Power Advocate sites for third-party owned and utility-owned offer submittals. Please ensure offers are submitted to the applicable site.
Non-Utility Owned Projects (Event ID 78749)
Utility Owned Projects (Event ID 78750)
OCEI RFO - Seeking Additional Offers for Utility Ownership Energy Storage Only (Event ID 83772) (Updated 8-20-2018)
Utility-Owned Projects:
PG&E will require Participants submitting offers for utility-owned energy storage at Oakland C and Oakland L to sign the Confidentiality Agreement (PG&E's Appendix D1) to access additional PG&E-owned site data. Participants are highly encouraged to submit a signed Confidentiality Agreement by 4/27/2018, 5 PM (PPT) via Power Advocate.
Third-Party Owned Projects:
PG&E and EBCE will require shortlisted Participants submitting offers for third-party owned projects to acknowledge and accept the applicable Confidentiality Agreement(s) (PG&E's Appendix D1 and/or EBCE's Appendix D2) at time of accepting shortlist status. EBCE Participants will be required to submit a signed Confidentiality Agreement (EBCE's Appendix D2) to EBCE.
PG&E/EBCE will co-host a Participants' Conference/Webinar for the 2018 OCEI RFO on Wednesday, May 9th, 2018. RSVP required for in-person attendance by Monday, May 7th, 2018 at Noon (PPT). See below for event details:
The presentation of this event, along with the audio file and attendee list will be available shortly after the event.
The proposed project at Oakland C and Oakland L is a project for utility-ownership under an engineering, procurement, and construction (EPC) agreement. PG&E requires a signed Confidentiality Agreement (Appendix D1) submitted via Power Advocate in order to access site-specific information, technical specifications, and contract term sheets. Site visit details can be found below:
All attendees must provide their own hard hat, safety glasses/goggles, fire retardant shirt and pants, safety boots, and safety vest. Site visit attendees that do not have the requisite personal protective equipment (PPE) will not be allowed to enter the substation site.
All Participants interested in attending the site visit must send an email to OCEI_RFO@pge.com confirming the names and email addresses of the attendees by 4/30 at 12PM (PPT). PG&E will confirm via Email reply shortly after with further information on site logistics and exact session start times.
Send questions about this RFO to OCEI_RFO@pge.com and CC the Independent Evaluator, Jonathan Jacobs, at Jonathan.Jacobs@PAConsulting.com. For EBCE-specific questions only, Participants may communicate with EBCE by e-mail to OCEI_RFO@ebce.org.
PG&E is responsible for collecting all information associated with Offers to both PG&E and EBCE. For Offers to EBCE for market products, PG&E will review all Offers for accuracy and completeness only before distributing such Offers to EBCE for EBCE’s review and evaluation.