Monday, January 10, 2005
Because of maintenance at Pacific Gas and Electric Company's McDonald Island storage facility, injection and withdrawal capability will be reduced on the following days as follows:
March 19-22 |
Injection: | 100 MMcf/Day |
Withdrawal: | 260 MMcf/Day | |
March 23 |
Injection: | 285 MMcf/Day |
Withdrawal | 580 MMcf/Day | |
March 24 |
Injection and withdrawal capability returns to normal* |
* Normal injection and withdrawal rates are listed daily within the PG&E Supply and Demand Forecast (Net Physical Flows) operations data on Pipe Ranger