News

McDonald Island Maintenance In March

Monday, January 10, 2005

Because of maintenance at Pacific Gas and Electric Company's McDonald Island storage facility, injection and withdrawal capability will be reduced on the following days as follows:


March 19-22

Injection: 100 MMcf/Day
Withdrawal: 260 MMcf/Day

March 23

Injection: 285 MMcf/Day
Withdrawal 580 MMcf/Day

March 24

Injection and withdrawal capability returns to normal*

* Normal injection and withdrawal rates are listed daily within the PG&E Supply and Demand Forecast (Net Physical Flows) operations data on Pipe Ranger