Redwood and Baja Paths Open Season Details

Date: May 22, 2025

PG&E's California Gas Transmission is holding an Open Season for on-system firm capacity on the Redwood and Baja Paths starting December 1, 2025, through December 31, 2030.  PG&E’s California Gas Transmission is pleased to announce that the open season will start immediately.

 

  • On-system firm capacity is available on the Baja or Redwood Paths, G-SFT standard tariff rates.
  • Bids are due no later than 9:00 a.m., Pacific time, June 24, 2025
  • We plan to award winning bidders by 12:00 p.m., Pacific time (noon), June 24, 2025.

 

Details of the Open Season are attached as is the on-system bid form.

 

PG&E’s proposed illustrative backbone rates are as follows:

PathPresent RatesIllustrative
202520262027% Change from 20252028% Change2029% Change2030%Change
Noncore Redwood Annual$0.6069$0.6548$0.4109-32.3%$0.43636.2%$0.45875.1%$0.48565.9%
Noncore Baja Annual$0.7111$0.7590$0.5151-27.6%$0.54054.9%$0.56294.1%$0.58984.8%
Noncore Redwood Seasonal$0.7282$0.7858$0.4930-32.3%$0.52366.2%$0.55055.1%$0.58275.8%
Noncore Baja Seasonal$0.8533$0.9108$0.6181-27.6%$0.64875.0%$0.67554.1%$0.70784.8%
Core Redwood Annual$0.6045$0.6445$0.4275-29.3%$0.45847.2%$0.48876.6%$0.52086.6%
Core Redwood Seasonal$0.7254$0.7734$0.5130-29.3%$0.55007.2%$0.58646.6%$0.62506.6%
Core Baja Seasonal$0.8504$0.8984$0.6380-25.0%$0.67515.8%$0.71145.4%$0.75015.4%
Silverado/Mission Annual$0.4239$0.4519$0.2886-31.9%$0.30856.9%$0.32716.0%$0.34756.2%
Silverado/Mission Seasonal$0.5087$0.5423$0.3463-31.9%$0.37026.9%$0.39256.0%$0.41716.3%
G-XF$0.1855$0.1942$0.1493-19.5%$0.15191.7%$0.1473-3.0%$0.14881.0%

 

($/Dth @ Full Contract)
- backbone transmission rate per Dth incurred by a firm shipper that uses its full contract quantity at a 100 percent load factor.

 

See Exhibit 10 Chapter 19, Attachment B.

 

To read the filing, go here and in the "Case" dropdown select 2027 General Rate Case [A.25-05-009].

 

If you have any questions, please call Allen DeBrum at 415.706.3960 or Jaime Rincon at 415.238.2587.

Recent News Articles

CGT Firm Transport Capacity Release

June 24, 2025 at 06:20 a.m.

Process occurs July 1-3, 2025 ...

Read Article

Imbalance Gas in Storage Reached Limit of 5 Bcf

May 29, 2025 at 12:47 p.m.

Suspension of pipeline balancing injection service beginning 5/30 ...

Read Article

CGT Firm Transport Capacity Release

May 27, 2025 at 06:00 a.m.

Process occurs June 3-5, 2025 ...

Read Article