"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2025 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
Date | OFO/EFO | Reason |
---|---|---|
01/16/2025 | System Wide | Low |
01/17/2025 | No OFO | |
01/18/2025 | No OFO | |
01/19/2025 | No OFO |
Pipeline Status
Plan 3, posted 04:03 PM PT
Last updated for the Gas Day of 01/18/2025. Next update expected by 11:00 PM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
|
|
System Inventory Status
Ending Inventory History | Ending Inventory Forecasts | ||||||
---|---|---|---|---|---|---|---|
MMcf |
Recent News Articles
Pipe Ranger Experiencing Technical Difficulties
January 15, 2025 at 07:51 a.m.
Supply and Demand data missing ...
Tionesta Compressor Station Retirement on May 7, 2025
January 13, 2025 at 11:20 a.m.
Upcoming Changes to Maximum Pipeline Capacities by Month on Redwood Path ...
High BTU Gas
January 10, 2025 at 07:46 a.m.
Entering system on Saturday, January 11, 2025 ...
Physical Pipeline Capacity
Physical Pipeline Capacities As of
(Receipt Point Capacity, )
|
||
---|---|---|
Redwood Path |
||
Redwood Path Capacity |
||
From Gas Transmission NW |
||
From Ruby |
||
Baja Path | ||
Baja Path Capacity – Topock |
||
Baja Path Capacity – Hinkley |
||
Baja Path Capacity – Kettleman |
||
From KRGT - HDL |
||
From KRGT - Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Off-System | ||
To SoCalGas |
||
To KRGT - HDL |
Scheduled Volumes
All Volumes in Dth | ||
---|---|---|
Cycle | Cycle | |
Redwood Path | ||
From Gas Transmission Northwest |
||
From Ruby |
||
Total Redwood Path |
|
|
Baja Path | ||
From KRGT-HDL |
||
From KRGT-Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Total Baja Path |
|
|
Off-System | ||
To SoCalGas |
||
To KRGT-HDL |
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.
Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Notes |
January 16 - 19 |
2220 |
Indian Springs Station Maintenance |
January 20 |
2200 |
Indian Springs Station Maintenance Delevan Station Maintenance |
January 21 - 22 |
2160 |
Indian Springs Station Maintenance Delevan Station Maintenance Gerber Station Maintenance |
January 23 - 27 |
2220 |
Indian Springs Station Maintenance |
January 28 |
1970 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
January 29 |
2110 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
January 30 - 31 |
2220 |
Indian Springs Station Maintenance |
February 01 - 10 |
2210 |
Indian Springs Station Maintenance |
February 11 |
1960 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
February 12 |
2100 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
February 13 - 28 |
2210 |
Indian Springs Station Maintenance |
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Notes |
January 18 - 28 |
945 |
870 |
945 |
Hinkley Station Maintenance |
February 03 - 07 |
840 |
890 |
945 |
Hinkley Station Maintenance Kettleman Station Maintenance |
February 10 |
930 |
930 |
945 |
Hinkley Station Maintenance |
February 11 - 13 |
840 |
930 |
945 |
Hinkley Station Maintenance Kettleman Station Maintenance |
February 14 |
930 |
930 |
945 |
Hinkley Station Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Notes |
---|
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Notes |
---|---|---|
January 15 - 31 |
797 |
El Paso Interconnect at Topock limited for maintenance |
February 01 - 28 |
797 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Available Injection | Notes |
---|
Capacity information is in MMcf/d
Withdrawal
Dates | Available Withdrawal | Notes |
---|
Capacity information is in MMcf/d
Forecasts
Supply and Demand
Forecast for | Forecast for | |
---|---|---|
COMPOSITE TEMPERATURE Historical Average for current day: 48.1 |
||
Demand | ||
On-System Demand | ||
Off-System Deliveries | ||
SoCal Gas KRS | ||
Southwest Gas | ||
Kern River GT - HDL | ||
Transmission Shrinkage | ||
Injection | ||
PG&E Storage Injection (251 Maximum)* | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Demand | ||
Supply | ||
Interconnect Supply | ||
Gas Transmission Northwest | ||
Ruby | ||
California Production | ||
SoCal Gas (KRS) | ||
Kern River GT - HDL | ||
Kern River GT - Daggett | ||
Southern Trails | ||
El Paso Natural Gas | ||
Transwestern | ||
Withdrawal | ||
PG&E Storage Withdrawal (1,098 Maximum)* Core, Market Center, and Pipeline Balancing |
||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Supply | ||
Inventory Change (Supply - Demand) | ||
Total Customer Imbalance |
Storage Activity
Forecast for |
Forecast for |
|
---|---|---|
Injection | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Injection | ||
Withdrawal | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Withdrawal |