"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2026 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
| Date | OFO/EFO | Reason |
|---|---|---|
| 03/02/2026 | No OFO | |
| 03/03/2026 | No OFO | |
| 03/04/2026 | System Wide | High |
| 03/05/2026 | No OFO |
Pipeline Status
Plan 4, posted 10:03 PM PT
Last updated for the Gas Day of 03/04/2026. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
| Today | Tomorrow |
|---|---|
|
ID1
|
TIMELY
|
|
ID2
|
EVENING
|
|
ID3
|
System Inventory Status
| Ending Inventory History | Ending Inventory Forecasts | ||||||
|---|---|---|---|---|---|---|---|
| MMcf | |||||||
Recent News Articles
Potential Hold Or Decrease On Constraints and Path Limits
February 23, 2026 at 07:23 a.m.
Affecting gas day February 23, 2026 ...
CGT Firm Transport Capacity Release
January 27, 2026 at 07:35 a.m.
Process occurs February 3-5, 2026 ...
PG&E Future Curtailment Changes
January 22, 2026 at 08:20 a.m.
Expected effective date of November 1, 2026 ...
Physical Pipeline Capacity
|
Physical Pipeline Capacities As of
(Receipt Point Capacity, )
|
||
|---|---|---|
|
Redwood Path |
||
|
Redwood Path Capacity |
||
|
From Gas Transmission NW |
||
|
From Ruby |
||
|
Baja Path | ||
|
Baja Path Capacity – Topock |
||
|
Baja Path Capacity – Hinkley |
||
|
Baja Path Capacity – Kettleman |
||
|
From KRGT - HDL |
||
|
From KRGT - Daggett |
||
|
From SoCalGas |
||
|
From El Paso Natural Gas |
||
|
From Transwestern |
||
|
Off-System | ||
|
To SoCalGas |
||
|
To KRGT - HDL |
||
Scheduled Volumes
| All Volumes in Dth | ||
|---|---|---|
| Cycle | Cycle | |
|
Redwood Path | ||
|
From Gas Transmission Northwest |
||
|
From Ruby |
||
|
Total Redwood Path |
|
|
|
Baja Path | ||
|
From KRGT-HDL |
||
|
From KRGT-Daggett |
||
|
From SoCalGas |
||
|
From El Paso Natural Gas |
||
|
From Transwestern |
||
|
Total Baja Path |
|
|
|
Off-System | ||
|
To SoCalGas |
||
|
To KRGT-HDL |
||
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.
Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
| Capacity in MMcf/d | ||
|---|---|---|
| Dates | Redwood Path | Notes |
|
March 04 - 05 |
1550 |
Delevan Station Maintenance |
|
March 06 |
1605 |
Delevan Station Maintenance Capacity can increase to 1840 mmcf/d with net injections |
|
March 09 |
1980 |
Burney Station Maintenance |
|
March 10 - 12 |
1810 |
Burney Station Maintenance |
|
March 13 |
1950 |
Burney Station Maintenance |
|
March 24 - 29 |
1770 |
L-400 Pipeline Maintenance |
|
March 30 - 31 |
1610 |
L-400 Pipeline Maintenance Antioch Terminal Maintenance Capacity can increase to 1770 mmcf/d with net injections |
| Capacity in MMcf/d | ||||
|---|---|---|---|---|
| Dates | Kettleman | Hinkley | Topock | Notes |
|
March 02 - 06 |
550 |
610 |
800 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300A Pipeline Maintenance L300B Pipeline Maintenance |
|
March 07 - 08 |
550 |
740 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300B Pipeline Maintenance |
|
March 09 |
550 |
640 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 10 - 11 |
550 |
500 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 12 - 13 |
550 |
640 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 14 - 29 |
550 |
750 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 30 - 31 |
550 |
540 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300B Pipeline Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
| Dates | Capacity | Notes |
|---|---|---|
|
March 04 - 05 |
0 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 04 - 05 |
0 |
Central Valley Storage facility limited net withdrawal for maintenance |
|
March 06 |
179 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 06 |
56 |
Central Valley Storage facility limited net withdrawal for maintenance |
|
March 30 - 31 |
121 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 30 - 31 |
38 |
Central Valley Storage facility limited net withdrawal for maintenance |
Capacity information is in MMcf/d
Baja Path
| Dates | Capacity | Notes |
|---|---|---|
|
March 01 - 31 |
797 |
El Paso Interconnect at Topock limited for maintenance |
|
March 02 - 06 |
0 |
Freemont Peak - KRGT HDL limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
| Dates | Available Injection | Notes |
|---|---|---|
|
March 01 - 04 |
63 |
Due to this unplanned storage injection outage, this will limit available injection for pipeline balancing. |
|
March 05 - 08 |
74 |
This will limit available injection for pipeline balancing. |
|
March 09 - 13 |
54 |
This will limit available injection for pipeline balancing. |
|
March 14 - 15 |
109 |
This will limit available injection for pipeline balancing. |
|
March 16 - 22 |
54 |
This will limit available injection for pipeline balancing. |
Capacity information is in MMcf/d
Withdrawal
| Dates | Available Withdrawal | Notes |
|---|
Capacity information is in MMcf/d
Forecasts
Supply and Demand
| Forecast for | Forecast for | |
|---|---|---|
|
COMPOSITE TEMPERATURE Historical Average for current day: 53.3 |
||
| Demand | ||
| On-System Demand | ||
| Off-System Deliveries | ||
| SoCal Gas KRS | ||
| Southwest Gas | ||
| Kern River GT - HDL | ||
| Transmission Shrinkage | ||
| Injection | ||
| PG&E Storage Injection (30 Maximum)* | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Total System Demand | ||
| Supply | ||
| Interconnect Supply | ||
| Gas Transmission Northwest | ||
| Ruby | ||
| California Production | ||
| SoCal Gas (KRS) | ||
| Kern River GT - HDL | ||
| Kern River GT - Daggett | ||
| Pisgah | ||
| El Paso Natural Gas | ||
| Transwestern | ||
| Withdrawal | ||
|
PG&E Storage Withdrawal (1,012 Maximum)* Core, Market Center, and Pipeline Balancing |
||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Total System Supply | ||
| Inventory Change (Supply - Demand) | ||
| Total Customer Imbalance | ||
Storage Activity
|
Forecast for |
Forecast for |
|
|---|---|---|
| Injection | ||
| PG&E StorageCore and Market Center | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Pipeline Balancing Injection | ||
| Withdrawal | ||
| PG&E StorageCore and Market Center | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Pipeline Balancing Withdrawal | ||