"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2025 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
| Date | OFO/EFO | Reason |
|---|---|---|
| 11/06/2025 | System Wide | High |
| 11/07/2025 | No OFO | |
| 11/08/2025 | No OFO | |
| 11/09/2025 | No OFO |
Pipeline Status
Plan 5, posted 04:33 AM PT
Last updated for the Gas Day of 11/08/2025. Next update expected by 8:00 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
| Today | Tomorrow |
|---|---|
|
ID1
|
TIMELY
|
|
ID2
|
EVENING
|
|
ID3
|
System Inventory Status
| Ending Inventory History | Ending Inventory Forecasts | ||||||
|---|---|---|---|---|---|---|---|
| MMcf | |||||||
Recent News Articles
Updated
A Hold On Constraint and Path Limits – 11/7/2025
November 07, 2025 at 01:09 p.m.
Hold placed for gas day November 7, 2025 ...
Updated
A Hold On Constraint and Path Limits – 11/5/2025
November 05, 2025 at 03:18 p.m.
Hold placed for gas day November 5, 2025 ...
Updated
Pipe Ranger Now Functioning Normally
November 04, 2025 at 09:45 a.m.
Plan data updated ...
Physical Pipeline Capacity
|
Physical Pipeline Capacities As of
(Receipt Point Capacity, )
|
||
|---|---|---|
|
Redwood Path |
||
|
Redwood Path Capacity |
||
|
From Gas Transmission NW |
||
|
From Ruby |
||
|
Baja Path | ||
|
Baja Path Capacity – Topock |
||
|
Baja Path Capacity – Hinkley |
||
|
Baja Path Capacity – Kettleman |
||
|
From KRGT - HDL |
||
|
From KRGT - Daggett |
||
|
From SoCalGas |
||
|
From El Paso Natural Gas |
||
|
From Transwestern |
||
|
Off-System | ||
|
To SoCalGas |
||
|
To KRGT - HDL |
||
Scheduled Volumes
| All Volumes in Dth | ||
|---|---|---|
| Cycle | Cycle | |
|
Redwood Path | ||
|
From Gas Transmission Northwest |
||
|
From Ruby |
||
|
Total Redwood Path |
|
|
|
Baja Path | ||
|
From KRGT-HDL |
||
|
From KRGT-Daggett |
||
|
From SoCalGas |
||
|
From El Paso Natural Gas |
||
|
From Transwestern |
||
|
Total Baja Path |
|
|
|
Off-System | ||
|
To SoCalGas |
||
|
To KRGT-HDL |
||
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.
Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
| Capacity in MMcf/d | ||
|---|---|---|
| Dates | Redwood Path | Notes |
| Capacity in MMcf/d | ||||
|---|---|---|---|---|
| Dates | Kettleman | Hinkley | Topock | Notes |
|
November 04 - 09 |
550 |
720 |
800 |
Hinkley Station Maintenance Kettleman Station Maintenance L300B Inline Inspection Topock Station Maintenance |
|
November 10 - 11 |
550 |
660 |
800 |
Hinkley Station Maintenance Kettleman Station Maintenance L300B Inline Inspection Topock Station Maintenance |
|
November 12 - 14 |
550 |
620 |
600 |
Hinkley Station Maintenance Kettleman Station Maintenance L300B Inline Inspection Topock Station Maintenance |
|
November 15 - 20 |
550 |
610 |
800 |
Hinkley Station Maintenance Kettleman Station Maintenance Topock Station Maintenance |
|
November 21 - 30 |
550 |
840 |
800 |
Hinkley Station Maintenance Kettleman Station Maintenance Topock Station Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
| Dates | Capacity | Notes |
|---|
Capacity information is in MMcf/d
Baja Path
| Dates | Capacity | Notes |
|---|---|---|
|
November 01 - 30 |
774 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
| Dates | Available Injection | Notes |
|---|---|---|
|
November 01 - 14 |
90 |
Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing. |
|
November 16 - 30 |
80 |
Storage maintenance at PG&E McDonald Island, Los Medanos, and Gill Ranch. This will impact injections, withdrawals and pipeline balancing. Injection capacity will range from 80-130 mmscf/d during this timeframe. |
Capacity information is in MMcf/d
Withdrawal
| Dates | Available Withdrawal | Notes |
|---|---|---|
|
November 01 - 14 |
190 |
Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing. |
|
November 17 - 22 |
330 |
Storage maintenance at PG&E McDonald Island, Los Medanos, and Gill Ranch. This will impact injections, withdrawals and pipeline balancing. |
Capacity information is in MMcf/d
Forecasts
Supply and Demand
| Forecast for | Forecast for | |
|---|---|---|
|
COMPOSITE TEMPERATURE Historical Average for current day: 57.3 |
||
| Demand | ||
| On-System Demand | ||
| Off-System Deliveries | ||
| SoCal Gas KRS | ||
| Southwest Gas | ||
| Kern River GT - HDL | ||
| Transmission Shrinkage | ||
| Injection | ||
| PG&E Storage Injection (96 Maximum)* | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Total System Demand | ||
| Supply | ||
| Interconnect Supply | ||
| Gas Transmission Northwest | ||
| Ruby | ||
| California Production | ||
| SoCal Gas (KRS) | ||
| Kern River GT - HDL | ||
| Kern River GT - Daggett | ||
| Southern Trails | ||
| El Paso Natural Gas | ||
| Transwestern | ||
| Withdrawal | ||
|
PG&E Storage Withdrawal (192 Maximum)* Core, Market Center, and Pipeline Balancing |
||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Total System Supply | ||
| Inventory Change (Supply - Demand) | ||
| Total Customer Imbalance | ||
Storage Activity
|
Forecast for |
Forecast for |
|
|---|---|---|
| Injection | ||
| PG&E StorageCore and Market Center | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Pipeline Balancing Injection | ||
| Withdrawal | ||
| PG&E StorageCore and Market Center | ||
| Wild Goose Storage | ||
| Central Valley Storage | ||
| Lodi Storage | ||
| Gill Ranch Storage | ||
| Pipeline Balancing Withdrawal | ||