As of Thursday, December 04, 2025
Redwood Path Maintenance
| Capacity in MMcf/d | ||
|---|---|---|
| Dates | Redwood Path | Maintenance Notes |
|
December 04 - 06 |
2050 |
Bethany Station Maintenance |
|
December 08 - 13 |
2050 |
Bethany Station Maintenance |
|
December 15 - 23 |
2050 |
Bethany Station Maintenance |
| December Max Capacity: 2060 | ||
Baja Path Maintenance
| Capacity in MMcf/d | ||||
|---|---|---|---|---|
| Dates | Kettleman | Hinkley | Topock | Maintenance Notes |
|
December 04 - 07 |
840 |
840 |
800 |
Topock Station Maintenance Hinkley Station Maintenance |
|
December 08 - 12 |
840 |
740 |
800 |
Topock Station Maintenance Hinkley Station Maintenance L300A Pipeline Inline Inspection |
|
December 13 - 15 |
840 |
840 |
800 |
Topock Station Maintenance Hinkley Station Maintenance L300A Pipeline Inline Inspection |
|
December 16 - 17 |
840 |
840 |
800 |
Topock Station Maintenance Hinkley Station Maintenance |
|
December 18 - 31 |
840 |
840 |
940 |
Topock Station Maintenance Hinkley Station Maintenance |
| December Max Capacity: 945 | ||||
Limitations at Specific Interconnect Points
Redwood Path
| Dates | Capacity | Maintenance Notes |
|---|
Capacity information is in MMcf/d
Baja Path
| Dates | Capacity | Maintenance Notes |
|---|---|---|
|
December 01 - 31 |
774 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
| Dates | Capacity | Maintenance Notes |
|---|
Capacity information is in MMcf/d
Withdrawal
| Dates | Capacity | Maintenance Notes |
|---|
Capacity information is in MMcf/d
Pipeline Maintenance History Download
Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.
Prospective Maintenance Document
Last revised: November 17, 2025
Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.
Report any accessibility barriers you encounter when using our site by contacting CGTPipeRanger@pge.com. The mailbox is monitored during our business hours (M-F; 6am-3pm PT). We will respond within 3 business days.