As of Friday, July 26, 2024
Redwood Path Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Maintenance Notes |
July 25 - 31 |
2090 |
Indian Springs Station Maintenance |
August 01 - 12 |
1760 |
Indian Springs Station Maintenance L-400 Pipeline Maintenance |
August 13 |
2020 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
August 14 - 21 |
1370 |
Indian Springs Station Maintenance L-401 Pipeline Maintenance |
August 22 - 31 |
2100 |
Indian Springs Station Maintenance |
July Max Capacity: 2170 | ||
August Max Capacity: 2170 |
Baja Path Maintenance
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Maintenance Notes |
July 25 - 27 |
380 |
600 |
940 |
L300A Pipeline Maintenance Kettleman Station Maintenance Topock Station Maintenance |
July 28 |
380 |
920 |
940 |
L300A Pipeline Maintenance Hinkley Station Maintenance Kettleman Station Maintenance Topock Station Maintenance |
July 29 - 30 |
380 |
820 |
940 |
L300A Pipeline Maintenance Hinkley Station Maintenance Kettleman Station Maintenance Topock Station Maintenance |
July 31 |
380 |
820 |
975 |
L300A Pipeline Maintenance Hinkley Station Maintenance Kettleman Station Maintenance |
August 01 - 02 |
500 |
820 |
975 |
L300A Pipeline Maintenance Hinkley Station Maintenance |
August 03 - 08 |
500 |
920 |
975 |
L300A Pipeline Maintenance Hinkley Station Maintenance |
August 09 - 31 |
500 |
920 |
975 |
Kettleman Station Maintenance Hinkley Station Maintenance |
July Max Capacity: 975 | ||||
August Max Capacity: 975 |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Maintenance Notes |
---|
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Maintenance Notes |
---|---|---|
July 01 - 31 |
713 |
El Paso Interconnect at Topock limited for maintenance |
August 01 - 31 |
713 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Capacity | Maintenance Notes |
---|
Capacity information is in MMcf/d
Withdrawal
Dates | Capacity | Maintenance Notes |
---|
Capacity information is in MMcf/d
Pipeline Maintenance History Download
Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.
Prospective Maintenance Document
Last revised: June 18, 2024
Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.
Report any accessibility barriers you encounter when using our site by contacting CGTPipeRanger@pge.com. The mailbox is monitored during our business hours (M-F; 6am-3pm PT). We will respond within 3 business days.