As of Wednesday, March 04, 2026
Redwood Path Maintenance
| Capacity in MMcf/d | ||
|---|---|---|
| Dates | Redwood Path | Maintenance Notes |
|
March 04 - 05 |
1550 |
Delevan Station Maintenance |
|
March 06 |
1605 |
Delevan Station Maintenance Capacity can increase to 1840 mmcf/d with net injections |
|
March 09 |
1980 |
Burney Station Maintenance |
|
March 10 - 12 |
1810 |
Burney Station Maintenance |
|
March 13 |
1950 |
Burney Station Maintenance |
|
March 24 - 29 |
1770 |
L-400 Pipeline Maintenance |
|
March 30 - 31 |
1610 |
L-400 Pipeline Maintenance Antioch Terminal Maintenance Capacity can increase to 1770 mmcf/d with net injections |
| March Max Capacity: 2050 | ||
Baja Path Maintenance
| Capacity in MMcf/d | ||||
|---|---|---|---|---|
| Dates | Kettleman | Hinkley | Topock | Maintenance Notes |
|
March 02 - 06 |
550 |
610 |
800 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300A Pipeline Maintenance L300B Pipeline Maintenance |
|
March 07 - 08 |
550 |
740 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300B Pipeline Maintenance |
|
March 09 |
550 |
640 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 10 - 11 |
550 |
500 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 12 - 13 |
550 |
640 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 14 - 29 |
550 |
750 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300 Pipeline Maintenance |
|
March 30 - 31 |
550 |
540 |
940 |
Topock Compressor Station Maintenance Hinkley Compressor Station Maintenance L300B Pipeline Maintenance |
| March Max Capacity: 975 | ||||
Limitations at Specific Interconnect Points
Redwood Path
| Dates | Capacity | Maintenance Notes |
|---|---|---|
|
March 04 - 05 |
0 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 04 - 05 |
0 |
Central Valley Storage facility limited net withdrawal for maintenance |
|
March 06 |
179 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 06 |
56 |
Central Valley Storage facility limited net withdrawal for maintenance |
|
March 30 - 31 |
121 |
Wild Goose Storage facility limited net withdrawal for maintenance |
|
March 30 - 31 |
38 |
Central Valley Storage facility limited net withdrawal for maintenance |
Capacity information is in MMcf/d
Baja Path
| Dates | Capacity | Maintenance Notes |
|---|---|---|
|
March 01 - 31 |
797 |
El Paso Interconnect at Topock limited for maintenance |
|
March 02 - 06 |
0 |
Freemont Peak - KRGT HDL limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
| Dates | Capacity | Maintenance Notes |
|---|---|---|
|
March 01 - 04 |
63 |
Due to this unplanned storage injection outage, this will limit available injection for pipeline balancing. |
|
March 05 - 08 |
74 |
This will limit available injection for pipeline balancing. |
|
March 09 - 13 |
54 |
This will limit available injection for pipeline balancing. |
|
March 14 - 15 |
109 |
This will limit available injection for pipeline balancing. |
|
March 16 - 22 |
54 |
This will limit available injection for pipeline balancing. |
Capacity information is in MMcf/d
Withdrawal
| Dates | Capacity | Maintenance Notes |
|---|
Capacity information is in MMcf/d
Pipeline Maintenance History Download
Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.
Prospective Maintenance Document
Last revised: February 18, 2026
Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.
Report any accessibility barriers you encounter when using our site by contacting CGTPipeRanger@pge.com. The mailbox is monitored during our business hours (M-F; 6am-3pm PT). We will respond within 3 business days.