Pipe Ranger Alert

Pipeline Maintenance

As of Tuesday, July 21, 2026

Redwood Path Maintenance

Capacity in MMcf/d
Dates Redwood Path Maintenance Notes

July 21

1880

Burney Station Maintenance

July Max Capacity: 1980

Baja Path Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Maintenance Notes

July 13 - 31

500

640

940

Hinkley Station Maintenance

L300A Pipeline Maintenance

August 01 - 09

500

740

940

Topock Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline maintenance

August 10 - 14

500

590

940

Topock Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline maintenance

August 15

500

740

940

Topock Station Maintenance

Hinkley Station Maintenance 

L300A Pipeline Maintenance

August 16 - 18

500

750

940

Topock Station Maintenance

Hinkley Station Maintenance 

L300A Pipeline Maintenance

August 19

500

400

940

Topock Station Maintenance

Hinkley Station Maintenance 

L300A Pipeline Maintenance

August 20 - 25

500

740

940

Topock Station Maintenance

Hinkley Station Maintenance

L300A Pipeline Maintenance 

August 26 - 29

380

740

940

Topock Station Maintenance

Hinkley Station Maintenance

Kettleman Station Mainteance

L300A Pipeline Maintenance

August 30 - 31

380

750

940

Topock Station Maintenance

Kettleman Station Maintenance

L300A Pipeline Maintenance

July Max Capacity: 975
August Max Capacity: 975

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Maintenance Notes

August 06 - 15

0

Lodi Sherman Island: No injections or withdrawal

Capacity information is in MMcf/d

Baja Path

Dates Capacity Maintenance Notes

August 19

370

El Paso Interconnect at Topock limited for maintenance

August 19

187

KRGT- Daggett Interconnect limited for maintenance

August 19

192

Transwestern Interconnect limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Capacity Maintenance Notes

July 01 - 31

90

Los Medanos storage facility maintenance

August 01 - 10

90

Los Medanos storage facility maintenance

Capacity information is in MMcf/d

Withdrawal

Dates Capacity Maintenance Notes

Capacity information is in MMcf/d

Pipeline Maintenance History Download

Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.

Prospective Maintenance Document

Last revised: July 16, 2026

Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.

 

Report any accessibility barriers you encounter when using our site by contacting CGTPipeRanger@pge.com. The mailbox is monitored during our business hours (M-F; 6am-3pm PT).  We will respond within 3 business days.