Pipe Ranger Alert

Pipeline Maintenance

As of Thursday, April 09, 2026

Redwood Path Maintenance

Capacity in MMcf/d
Dates Redwood Path Maintenance Notes

April 08 - 09

1840

Gerber Station Maintenance

April 13 - 21

1810

Antioch Station Maintenance

Capacity can increase to 1970 mmcf/d with net injections

April 22

1811

Burney Station Maintenance

Antioch Station Maintenance

Capacity can increase to 1900 mmcf/d with net injections

April 23

1740

Burney Station Maintenance

Antioch Station Maintenance

April 24

1810

Burney Station Maintenance

Antioch Station Maintenance

Capacity can increase to 1870 mmcf/d with net injections

April 25 - 30

1810

Antioch Station Maintenance

Capacity can increase to 1970 mmcf/d with net injections

April Max Capacity: 2030

Baja Path Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Maintenance Notes

April 09 - 10

500

750

640

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

Milpitas Station Maintenance

April 11 - 12

500

750

800

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

Milpitas Station Maintenance

April 13 - 21

500

750

630

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

Milpitas Station Maintenance

April 22 - 23

500

750

630

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

April 24 - 26

500

750

630

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

PLS7 Station Maintenance

April 27 - 30

500

540

800

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

PLS7 Station Maintenance

Hinkley Station Maintenance

April Max Capacity: 975

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Maintenance Notes

April 13 - 21

122

Wild Goose Storage Facility limited net withdrawal for maintenance

April 13 - 21

38

Central Valley Storage Facility limited net withdrawal for maintenance

April 22

67

Wild Goose Storage Facility limited net withdrawal for maintenance

April 22

21

Central Valley Storage Facility limited net withdrawal for maintenance

April 23

0

Wild Goose Storage Facility limited net withdrawal for maintenance

April 23

0

Central Valley Storage Facility limited net withdrawal for maintenance

April 24

46

Wild Goose Storage Facility limited net withdrawal for maintenance

April 24

21

Central Valley Storage Facility limited net withdrawal for maintenance

April 25 - 30

122

Wild Goose Storage Facility limited net withdrawal for maintenance

April 25 - 30

38

Central Valley Storage Facility limited net withdrawal for maintenance

Capacity information is in MMcf/d

Baja Path

Dates Capacity Maintenance Notes

April 02 - 12

0

Delivery from Fremont Peak - KRGT HDL limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Capacity Maintenance Notes

Capacity information is in MMcf/d

Withdrawal

Dates Capacity Maintenance Notes

Capacity information is in MMcf/d

Pipeline Maintenance History Download

Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.

Prospective Maintenance Document

Last revised: March 17, 2026

Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.

 

Report any accessibility barriers you encounter when using our site by contacting CGTPipeRanger@pge.com. The mailbox is monitored during our business hours (M-F; 6am-3pm PT).  We will respond within 3 business days.