Pipe Ranger Alert

Pipeline Maintenance

As of Friday, May 01, 2026

Redwood Path Maintenance

Capacity in MMcf/d
Dates Redwood Path Maintenance Notes

April 25 - 30

1810

Antioch Station Maintenance

Capacity can increase to 1970 mmcf/d with net injections

May 01 - 12

1809

Antioch Station Maintenance

Capacity can increase to 1900 mmcf/d with net injections

May 13

1980

Delevan Station Maintenance

May 18 - 22

1990

Bethany Station Maintenance

May 28

1960

Burney Station Maintenance

May 31

1950

Gerber Station Maintenance

April Max Capacity: 2030
May Max Capacity: 2000

Baja Path Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Maintenance Notes

April 29 - 30

500

540

800

Topock Station Maintenance

L300A Pipeline Maintenance

L300B Pipeline Maintenance

PLS7 Station Maintenance

Hinkley Station Maintenance

May 01

370

370

800

Topock Station Maintenance

Hinkley Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline Maintenance

May 02 - 10

500

750

800

Topock Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline Maintenance

May 11 - 15

500

740

800

Topock Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline Maintenance

May 16 - 31

500

750

800

Topock Station Maintenance

L300B Pipeline Maintenance

Kettleman Station Maintenance

L300A Pipeline Maintenance

April Max Capacity: 975
May Max Capacity: 975

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Maintenance Notes

April 25 - 30

122

Wild Goose Storage Facility limited net withdrawal for maintenance

April 25 - 30

38

Central Valley Storage Facility limited net withdrawal for maintenance

May 01

69

Wild Goose Storage Facility limited net withdrawal for maintenance

May 01

22

Central Valley Storage Facility limited net withdrawal for maintenance

Capacity information is in MMcf/d

Baja Path

Dates Capacity Maintenance Notes

April 01 - 30

774

El Paso Interconnect at Topock limited for maintenance

May 01

192

Transwestern Interconnect limited for maintenance

May 01

187

KRGT- Daggett Interconnect limitted for maintenance

May 01

370

El Paso Interconnect at Topock limited for maintenance

May 02 - 31

774

El Paso Interconnect at Topock limited for maintenance

May 19 - 20

192

Kern River Station limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Capacity Maintenance Notes

Capacity information is in MMcf/d

Withdrawal

Dates Capacity Maintenance Notes

Capacity information is in MMcf/d

Pipeline Maintenance History Download

Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.

Prospective Maintenance Document

Last revised: April 16, 2026