As of Friday, February 07, 2025
Redwood Path Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Maintenance Notes |
February 01 - 10 |
2210 |
Indian Springs Station Maintenance |
February 11 |
1960 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
February 12 |
2100 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
February 13 - 28 |
2210 |
Indian Springs Station Maintenance |
February Max Capacity: 2280 |
Baja Path Maintenance
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Maintenance Notes |
February 03 - 07 |
840 |
450 |
945 |
Unplanned Hinkley Station Maintenance Kettleman Station Maintenance |
February 08 - 10 |
830 |
450 |
945 |
Unplanned Hinkley Station Maintenance Unplanned L300A Pipeline Maintenance |
February 11 - 13 |
800 |
450 |
945 |
Unplanned Hinkley Station Maintenance Kettleman Station Maintenance Unplanned L300A Pipeline Maintenance |
February 14 |
830 |
450 |
945 |
Unplanned Hinkley Station Maintenance Unplanned L300A Pipeline Maintenance |
February 15 - 28 |
830 |
930 |
945 |
Unplanned Hinkley Station Maintenance Unplanned L300A Pipeline Maintenance |
February Max Capacity: 945 |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Maintenance Notes |
---|
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Maintenance Notes |
---|---|---|
February 01 - 28 |
797 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Capacity | Maintenance Notes |
---|---|---|
February 01 - 28 |
120 |
Planned maintenance at McDonald Island. May impact pipeline balancing services during maintenance duration. |
Capacity information is in MMcf/d
Withdrawal
Dates | Capacity | Maintenance Notes |
---|
Capacity information is in MMcf/d
Pipeline Maintenance History Download
Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.
Prospective Maintenance Document
Last revised: January 16, 2025
Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.