Annual Rates
Schedule G-AFT

Annual Firm Backbone Charges for On-System Deliveries

Archived Rates This link will open in a new window

MFV Rate Design
202220212020
Redwood to On-System Core
Reservation Charge ($/Dth/mo)
15.4990
15.0130
13.5578
Usage Charge ($/Dth)
0.2084
0.1939
0.1635
Total ($/Dth @ Full Contract)
0.7180
0.6875
0.6092
Redwood to On-System
Reservation Charge ($/Dth/mo)
16.7183
16.3309
14.8870
Usage Charge ($/Dth)
0.2022
0.1925
0.1717
Total ($/Dth @ Full Contract)
0.7518
0.7294
0.6611
Baja to On-System Core
Reservation Charge ($/Dth/mo)
0.0000
0.0000
16.5621
Usage Charge ($/Dth)
0.0000
0.0000
0.1997
Total ($/Dth @ Full Contract)
0.0000
0.0000
0.7442
Baja to On-System
Reservation Charge ($/Dth/mo)
20.7209
20.1370
17.9270
Usage Charge ($/Dth)
0.2506
0.2374
0.2067
Total ($/Dth @ Full Contract)
0.9318
0.8994
0.7961
Silverado and Mission to On-System
Reservation Charge ($/Dth/mo)
12.9629
12.6452
11.1722
Usage Charge ($/Dth)
0.1657
0.1574
0.1350
Total ($/Dth @ Full Contract)
0.5919
0.5731
0.5023
SFV Rate Design
202220212020
Redwood to On-System Core
Reservation Charge ($/Dth/mo)
21.7537
20.8302
18.4477
Usage Charge ($/Dth)
0.0028
0.0027
0.0027
Total ($/Dth @ Full Contract)
0.7180
0.6875
0.6092
Redwood to On-System
Reservation Charge ($/Dth/mo)
22.7597
22.0809
20.0078
Usage Charge ($/Dth)
0.0036
0.0035
0.0033
Total ($/Dth @ Full Contract)
0.7518
0.7294
0.6611
Baja to On-System Core
Reservation Charge ($/Dth/mo)
0.0000
0.0000
22.5356
Usage Charge ($/Dth)
0.0000
0.0000
0.0033
Total ($/Dth @ Full Contract)
0.0000
0.0000
0.7442
Baja to On-System
Reservation Charge ($/Dth/mo)
28.2087
27.2272
24.0935
Usage Charge ($/Dth)
0.0044
0.0043
0.0040
Total ($/Dth @ Full Contract)
0.9318
0.8994
0.7961
Silverado and Mission to On-System
Reservation Charge ($/Dth/mo)
17.9215
17.3534
15.2032
Usage Charge ($/Dth)
0.0027
0.0026
0.0025
Total ($/Dth @ Full Contract)
0.5919
0.5731
0.5023

Notes:

Core Baja G-AFT rates only available through March 31, 2020.

Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.