Wednesday, June 29, 2022
As a reminder, an Allocation on the Redwood Path may become necessary per gas rule 14. The last Allocation was implemented on August 18, 2020 due to receipt of very high customer nominations on the Redwood Path. Please read the following information to refresh yourselves on how best to prepare or respond to an Allocation.
As-available Redwood Path supplies flowing from Malin (Gas Transmission Northwest) and Onyx Hill (Ruby Pipeline), and net withdrawals flowing on Mission Path as-available transportation from Wild Goose Storage, Lodi Gas Storage, and Central Valley Gas Storage (the northern Independent Storage Providers) all compete for the same as-available pipeline space on the Line 400/401 system.
When total confirmed volumes from these sources exceed the capacity of the Line 400/401 system, CGT will need to prorate the as-available confirmed volumes down to the available capacity to assure the safe operation of the system. This process is done in accordance with gas rule 14.
During a Redwood Allocation, CGT schedules the Line 400/401 system as follows:
CGT can implement a Redwood Path Allocation during the confirm process for all nomination cycles. When CGT finds it necessary to implement an Allocation, customers will be notified as quickly as possible via a Pipe Ranger article and an INSIDEtracc notice.
In the past, CGT attempted to put out a notification to the market when we believed an Allocation might be likely. We have discontinued that practice, as it is difficult to foresee with any accuracy the system conditions that might predicate an Allocation. We also believe that putting out notifications that turn out to be unwarranted is overly disruptive to the market.
We will, however, commit to calling an Allocation as early as possible and notifying the market as early as possible.
The conditions that might lead to an Allocation:
If these conditions exist and you are concerned that a Redwood Path Allocation might be imminent, you have the following options available to you:
To transport storage withdrawals On-System, customers may convert all or part of a Firm On-System Redwood or Firm On-System Baja Exhibit to a Firm On-System Mission Exhibit at any time prior to 60 minutes before the close of the Timely Nomination Cycle, as set forth in gas Rule 21. However, the full monthly demand charge is still applicable.
Conversions of Firm On-System Baja Exhibits are limited to the amount of unsold Firm Redwood capacity available at the time of the requested conversion. Baja Exhibit conversions may be requested on a monthly basis, no more than five (5) days prior to the end of the month, for a maximum term of one month. Redwood Exhibit conversions have no maximum term limit.
If you have any questions on the above, please contact a CGT Sales Representative or Account Manager.