CGT Firm Transport Capacity Release

Date: September 28, 2021

As part of facilitating the Core Gas Aggregation Program and as a service to Core Transport Agents (CTAs), Pacific Gas and Electric Company's California Gas Transmission is offering a capacity release of firm transportation, which is the CTAs’ rejected allocated core pipeline capacity.

 

The capacity release auction process will begin at 7:00 AM, October 5, 2021 and will close at 8:00 AM Pacific Time on October 7, 2021 to coordinate with the timeline on the interstate pipelines.

 

The capacity release includes Firm Transportation on the following pipelines:

 

PipelineMaximum Daily Quantity
November 2021December 2021January 2022February 2022
Foothills Pipe Lines (Canada)26,698 GJ/d26,698 GJ/d26,698 GJ/d26,698 GJ/d
NOVA Gas Transmission (Canada)26,974 GJ/d26,974 GJ/d26,974 GJ/d26,974 GJ/d
Gas Transmission Northwest24,189 Dth/d24,189 Dth/d24,189 Dth/d24,189 Dth/d
Ruby Pipeline30,848 Dth/d30,848 Dth/d27,318 Dth/d27,318 Dth/d
PG&E Baja On-System SFT (Core-MFV)0 Dth/d21,802 Dth/d21,802 Dth/d21,802 Dth/d
PG&E Redwood On-System AFT (Core-MFV)13,078 Dth/d19,478 Dth/d19,478 Dth/d19,478 Dth/d
PG&E Redwood On-System SFT (Core-MFV)15,067 Dth/d24,047 Dth/d24,047 Dth/d6,871 Dth/d
El Paso Natural Gas16,066 Dth/d16,066 Dth/d16,066 Dth/d16,066 Dth/d

 

All offered transport will be for a single month contract, available for the specified quantity in the months of November 2021 - February 2022.

 

By October 4, CGT will send the information packet via e-mail to all parties who currently hold a Gas Transmission Service Agreement (GTSA) with CGT and have the "Trader" role in the INSIDEtracc System. The information packet will include details on the offerings available and how to participate in the capacity release process.

 

If you would like to be included on the distribution list to receive the information packet or have questions, please e-mail cgtcoretransport@pge.com or contact Terri Seto at 925.357.7571.

Recent News Articles

Potential Hold On Constraint and Path Limits - 3/15/24

March 15, 2024 at 07:03 a.m.

ID1 set to Evening cycle ...

Read Article

A Hold On Constraint and Path Limits - 3/14/24

March 14, 2024 at 09:08 a.m.

ID1 set to Evening cycle ...

Read Article

Springing Forward on March 10, 2024

March 08, 2024 at 07:00 a.m.

Time changes Sunday, 2:00 a.m ...

Read Article