Advice Number | Date Filed | Tariff Sheet Number | Subject | Effective Date | Decision Number | |
---|---|---|---|---|---|---|
12/30/2022
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Contract resulting from its Summer Reliability Program solicitation, executed between Sunrun, Inc. and PG&E
|
01/25/2023
|
D.21-12-011
|
||
12/30/2022
|
N/A
|
Pacific Gas and Electric Company's End of the Year Advice Letter Filing for the WatterSaver Reporting
|
01/24/2023
|
N/A
|
||
12/30/2022
|
55053-55058
|
Request for Approval of PG&E's Plan to Develop a Clean Substation Microgrid Project and Associated Procurement Contract with Energy Vault
|
04/27/2023
|
N/A
|
||
12/30/2022
|
55060-55065
|
Revisions to PG&E's Business Electric Vehicle (BEV) Rate Schedule
|
01/29/2023
|
N/A
|
||
12/29/2022
|
54891-55052
|
2023 Annual Electric True-Up - Consolidated Electric Rate Changes Effective January 1, 2023
|
01/01/2023
|
N/A
|
||
12/29/2022
|
N/A
|
Progress on Energy Storage Procurement at the Mesa 115 kilovolt (kV) Substation in Compliance with Decision 22 02 004
|
07/21/2023
|
D.22-02-004
|
||
12/28/2022
|
N/A
|
Progress on Energy Storage Procurement on the Kern-Lamont 115kV System in Compliance with Decision 22-02-004
|
Pending
|
D.22-02-004
|
||
12/28/2022
|
N/A
|
Lake Britton Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851
|
01/18/2023
|
D.08-11-043, D.03-12-035, D.10-08-004.
|
||
12/28/2022
|
N/A
|
Pit River Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851
|
01/18/2023
|
D.08-11-043, D.03-12-035, D.10-08-004.
|
||
12/22/2022
|
N/A
|
Update to Pacific Gas and Electric Company's Bundled Procurement Plan - Electrical Capacity and Ratable Rate, Natural Gas Pipeline Capacity, Natural Gas Storage Procurement, and Greenhouse Gas Procurement Limits and Resource Adequacy Solicitation Schedule
|
12/22/2022
|
D.07-12-052
|
||
12/21/2022
|
N/A
|
Green Tariff (GT) & Enhanced Community Renewables (ECR) 2022 Marketing Plan Marketing Implementation Advice Letter
|
01/20/2023
|
D.15-01-051
|
||
12/21/2022
|
N/A
|
2022 Annual Update on Capital Structure in Compliance with OP 9 of Decision 20-05-053
|
12/21/2022
|
D.20-05-053
|
||
12/21/2022
|
N/A
|
Information-only Advice Letter on Pacific Gas and Electric Company's Progress to Increase Family Electric Rate Assistance Program Enrollment per Decision (D.) 18-08-013
|
12/21/2022
|
D.18-08-013
|
||
12/21/2022
|
N/A
|
PG&E's Updated Rate and Bill Impacts, in Compliance with OP 13 of D.22-11-040
|
01/02/2023
|
D.22-11-040
|
||
12/21/2022
|
N/A
|
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003
|
12/21/2022
|
D.18-12-003
|
||
12/19/2022
|
N/A
|
Tier 2 Advice Letter Regarding Market Offer
|
02/02/2023
|
N/A
|
||
12/16/2022
|
N/A
|
Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Access Charge Balancing Account Adjustment
|
02/21/2023
|
N/A
|
||
12/16/2022
|
54816-54832
|
Clean-Up Electric Tariffs
|
12/16/2022
|
N/A
|
||
12/15/2022
|
54837-54847
|
Modifications to Pacific Gas & Electric Virtual Net Energy Metering (VNEM) Tariffs
|
Superceded
|
N/A
|
||
12/15/2022
|
N/A
|
Pacific Gas & Electric Company's Request for Certification of Energy Storage Procurement in Other Proceedings for Assembly Bill 2514 Compliance Targets
|
12/15/2022
|
N/A
|
||
12/14/2022
|
54783-54790, 38265-38272
|
PG&E's Revisions to its Tariffs, E-OBR, and G-OBR, On-Bill Repayment (OBR), and Form 79-1157, Authorization to Add Charges to Utility Bill, Applicable Throughout its Service Territory
|
Effective Pending Final Disposition
|
N/A
|
||
12/14/2022
|
54810-54811
|
Retire Electric Rate Schedule E-31, Distribution Bypass Deferral Rate, and Electric Preliminary Statement Part CK, Distribution Bypass Deferral Rate Memorandum Account
|
01/13/2023
|
N/A
|
||
12/14/2022
|
54794-54806
|
Modifications to the Microgrids Memorandum Account (MGMA), Microgrids Balancing Account (MGBA), Distribution Revenue Adjustment Mechanism (DRAM) and Energy Resource Recovery Account (ERRA) in Compliance Decision (D.) 22-11-009 (Framework for Substation Microgrid Solutions to Mitigate PSPS Decision)
|
12/14/2022
|
D.22-11-009
|
||
12/14/2022
|
54783-54790, 38265-38272
|
PG&E's Revisions to its Tariffs, E-OBR, and G-OBR, On-Bill Repayment (OBR), and Form 79-1157, Authorization to Add Charges to Utility Bill, Applicable Throughout its Service Territory
|
|
N/A
|
||
12/13/2022
|
N/A
|
East Bay Community Energy, Pacific Gas and Electric Company, and Bay Area Regional Energy Network Joint Cooperation Memorandum for Program Year 2023 Energy Efficiency Programs
|
Pending
|
N/A
|
||
12/12/2022
|
N/A
|
Fall River Mills Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851
|
01/18/2023
|
D.08-11-043, D.03-12-035, D.10-08-004
|
||
12/12/2022
|
N/A
|
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q2 2022)
|
08/21/2022
|
D.03-12-062 and D.02-10-062
|
||
12/09/2022
|
N/A
|
True-Up of Capacity Transfer Under the Disadvantaged Communities Green Tariff Program to Accommodate Service to the City of Los Banos
|
Pending
|
N/A
|
||
12/09/2022
|
N/A
|
Tier 2 Advice Letter Seeking Approval of Quarterly Estimated Tax Payment Process for the Customer Credit Trust in Compliance with D.21-04-030
|
01/08/2023
|
D.21-04-030
|
||
12/08/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020
|
01/07/2023
|
D.21-10-020
|
||
12/07/2022
|
54779-54780
|
Modifications to PG&E's Electric Rule 21 to Address Anti-Islanding Pursuant to the Rule 21 Working Group 4 Decision 21-06-002
|
Pending
|
D.21-06-002
|
||
12/05/2022
|
N/A
|
Tier 1 Advice Letter Regarding Market Offer
|
12/05/2022
|
D.22-11-021
|
||
12/05/2022
|
N/A
|
Energy Price Updates for December 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
12/05/2022
|
D.20-05-006
|
||
12/05/2022
|
N/A
|
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d)
|
12/05/2022
|
D.22-08-00
|
||
12/05/2022
|
54757-54773
|
PG&E EV Submetering Implementation Plan
|
06/29/2023
|
D.22-08-024
|
||
12/01/2022
|
N/A
|
Self-Generation Incentive Program Funded Energy Storage Installations
|
12/01/2022
|
D.16-09-007
|
||
11/30/2022
|
N/A
|
Fall 2021 Solar in Disadvantaged Communities (DAC) Solicitation; Power Purchase Agreements Between PG&E and Selected Counterparties
|
12/30/2022
|
D.18-06-027, D.18-10-007
|
||
11/28/2022
|
54746-54748
|
Update Electric Preliminary Statement Part JI - Dynamic and Real-Time Pricing Memorandum Account Pursuant to D. 22-10-024
|
11/29/2022
|
D.22-10-024
|
||
11/28/2022
|
54751-54752
|
Final Tariff Sheets for Implementation of the New Line-Item Discount Schedule D-MEDICAL Effective December 1, 2022, in Compliance With Decision 22-04-004
|
12/01/2022
|
D.22-04-004
|
||
11/23/2022
|
N/A
|
Notification of the Creation of a New Affiliate: Pacific Generation LLC
|
Rejected
|
D.97-12-088, D.98-08-035 and D.06-12-029
|
||
11/21/2022
|
N/A
|
Issuance Advice Letter Submission for Wildfire Hardening Recovery Bonds
|
11/21/2022
|
D.22-08-004
|
||
11/21/2022
|
54743-54744
|
Customer-Facing Re-naming of Fixed Charge for Schedule E-ELEC (Residential Time-of-Use, Electric Home), Effective December 1, 2022
|
12/01/2022
|
N/A
|
||
11/21/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Livermore-Las Positas 60kV Power Line Relocation Project, City of Livermore
|
01/06/2023
|
N/A
|
||
11/18/2022
|
54736-54734
|
Implement Final Rates for New Pro-Electrification Rate Schedule E-ELEC (Residential Time-of-Use, Electric Home) Effective December 1, 2022 in Compliance With Decision 21-11-016
|
12/01/2022
|
D.21-11-016
|
||
11/17/2022
|
54731-54732
|
Modifications to PG&E's Transmission Load Operating Agreement Form 79-847
|
04/14/2023
|
N/A
|
||
11/15/2022
|
N/A
|
Preliminary Annual Electric True-Up Submittal - Change to PG&E's Electric Rates on January 1, 2023
|
01/01/2023
|
N/A
|
||
11/15/2022
|
N/A
|
Advice Letter of Pacific Gas and Electric: Summer Reliability Market Access Program 2023
|
12/16/2022
|
N/A
|
||
11/15/2022
|
N/A
|
Request for Approval to Not Issue Competitive Solicitations for Distributed Energy Resource (DER) Procurement for Electric Distribution Deferral Opportunities
|
12/15/2022
|
D.18-02-004
|
||
11/15/2022
|
N/A
|
Pacific Gas and Electric Company's Proposed Partnership Pilot in Compliance with Decision 21-02-006
|
12/15/2022
|
D.21-02-006
|
||
11/15/2022
|
54725-54724
|
Retire Electric Preliminary Statement Part DG, Power Charge Collection Balancing Account
|
12/15/2022
|
N/A
|
||
11/15/2022
|
54729-54726, 38228-38227
|
Clean-Up of Gas and Electric Preliminary Statements
|
12/15/2022
|
N/A
|
||
11/14/2022
|
N/A
|
Notice of Statewide California Energy-Smart Homes Mixed-Fuel Residential New Construction Program Closure Request
|
12/14/2022
|
D.21-05-031
|
||
11/10/2022
|
N/A
|
Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022
|
04/03/2023
|
D.18-05-022
|
||
11/10/2022
|
N/A
|
Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance with D.13-01-021, D.13-02-017, and D.13-04-001
|
04/03/2023
|
D.13-01-021, D.13-02-017, D.13-04-001
|
||
11/09/2022
|
54499-54721
|
Modifications to Electric Rule 21 on Financial Security Posting Requirements
|
Superceded
|
N/A
|
||
11/09/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of VASCO-HERDLYN 60 KV POWER LINE POLE REPLACEMENT PROJECT, Alameda and Contra Costa counties and City of Livermore
|
07/13/2023
|
N/A
|
||
11/08/2022
|
N/A
|
Information-Only: Executed Contracts Pursuant to the May 11, 2020 Administrative Law Judge's Ruling Modifying the Distribution Investment Deferral Framework-Filing and Process Requirements
|
11/08/2022
|
N/A
|
||
11/07/2022
|
N/A
|
Energy Price Updates for November 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
11/07/2022
|
D.20-05-006
|
||
11/04/2022
|
54491-54493
|
Second Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172
|
11/04/2022
|
D.22-10-020
|
||
11/04/2022
|
54494-54496
|
Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172 and PG&E's Request for Extension of Time to Comply with D.20-09-035 Ordering Paragraphs 2 and 11 as Discussed in Resolution E-5172
|
11/04/2022
|
D.22-10-020
|
||
11/04/2022
|
N/A
|
Supplemental: Pacific Gas and Electric Company ("PG&E") Central Procurement Entity ("CPE") Annual Compliance Report
|
12/06/2022
|
D.20-06-002
|
||
11/03/2022
|
N/A
|
Battle Creek Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851
|
12/09/2022
|
08-11-043
|
||
10/31/2022
|
N/A
|
Customer Eligibility for PG&E's Vehicle-Grid Integration (VGI) Pilot #3: Microgrids Pilot
|
Pending
|
N/A
|
||
10/31/2022
|
N/A
|
Procurement Transaction Quarterly Compliance Submittal (Q3 2022)
|
11/30/2022
|
D.03-12-062 and D.02-10-062
|
||
10/28/2022
|
N/A
|
Supplemental - Summer 2022 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers
|
10/07/2022
|
N/A
|
||
10/28/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Manteca-Louise 60 kV Pole Relocation Project, City of Manteca
|
11/27/2022
|
N/A
|
||
10/28/2022
|
N/A
|
Supplemental filing to AL 6655-E to address OP.10 of D. 21-12-036
|
11/16/2022
|
D. 21-12-036
|
||
10/28/2022
|
N/A
|
Proposed Modifications to the Self-Generation Incentive Program Handbook for PG&E's Building Permit and Final Monitoring Schematic Documents
|
10/28/2022
|
N/A
|
||
10/27/2022
|
N/A
|
Sale and Conveyance of one Parcel of Improved Land in the City of San Jose in Santa Clara County - Request for Approval under Public Utilities Code Section 851 and General Order 173
|
11/26/2022
|
N/A
|
||
10/26/2022
|
N/A
|
Advice Letter Submittal of Contract resulting from the Statewide Market Transformation Administrator solicitation and executed between Resource Innovations, Inc. and PG&E
|
11/23/2022
|
D.19-12-021
|
||
10/21/2022
|
N/A
|
Pacific Gas and Electric Company (PG&E) 3rd Quarter 2022 Solar Complaint Trends Information-Only Advice Letter
|
10/21/2022
|
D.18-09-044
|
||
10/21/2022
|
N/A
|
Elimination of PG&E's High Usage Surcharge Per Decision 21-03-003
|
01/01/2023
|
D. 21-03-003
|
||
10/21/2022
|
N/A
|
2022 Tree Mortality Non-Bypassable Charge (TM NBC) Bundled Renewable Portfolio Standard (RPS) Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and San Diego Community Power for product from Burney Forest Products; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and East Bay Community Energy for product from Wheelabrato
|
10/21/2022
|
D.18-12-003
|
||
10/21/2022
|
54484-54489
|
Modifications to PG&E's Interconnection Application Forms to Incorporate Anti-Islanding Options in the Application Portal Pursuant to the Rule 21 Working Group 4 Decision 21-06-002
|
12/12/2022
|
D.21-06-002
|
||
10/21/2022
|
N/A
|
Washington, Hopkins and KNP Complex October 2021 Wildfires Event Emergency Consumer Protections Summary
|
10/21/2022
|
D.19-07-015
|
||
10/20/2022
|
54480-54482, 38169-38184
|
Modifications to Gas Rule 15, Gas Rule 16, Form 79-1018, and Form 79-1169 to Eliminate Certain Gas Line Extension Allowances, Discounts, and Refunds Pursuant to Decision (D.) 22-09-026
|
07/01/2023
|
D.22-09-026
|
||
10/18/2022
|
N/A
|
Tidewater Substation Lease Renewal - Request for approval Under Public Utilities Code Section 851, Pursuant to General Order 173
|
11/17/2022
|
N/A
|
||
10/17/2022
|
N/A
|
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet December 2022 Local Resource Adequacy Procurement Obligations
|
05/23/2023
|
D.06-06-064
|
||
10/14/2022
|
N/A
|
Bahia Substation Lease Renewal to Valero Refinery - Request for Approval Under Section 851 and General Order 173
|
11/13/2022
|
N/A
|
||
10/14/2022
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
10/14/2022
|
D.21-04-015
|
||
10/14/2022
|
N/A
|
Supplemental Filing for 6587-E Advice Letter PG&E's DAHRTP CEV M&E Plan Includes Updated Overall DAHRTP CEV Budget
|
Pending
|
D.21-11-017
|
||
10/13/2022
|
N/A
|
Supplemental: Southern California Edison Company, Pacific Gas & Electric Company and San Diego Gas & Electric Company's Auto Demand Response Control Incentive Guidelines and Adopted Policies Submitted, Pursuant To Decision 18-11-029
|
10/01/2022
|
D.18-11-029
|
||
10/13/2022
|
N/A
|
Amendment No. 5 to Supplement No. 2 Under the Master Agreement with the Peninsula Corridor Joint Powers Board Regarding the Peninsula Corridor Electrification Project in Accordance with General Order 96-B, Section 9.2.3, and Resolution E-4811
|
11/12/2022
|
N/A
|
||
10/12/2022
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Micro and Small Business Equity Program solicitation, executed between Resource Innovations and PG&E
|
11/11/2022
|
D.18-01-004
|
||
10/12/2022
|
54470-54478
|
Corrections to Schedules NEM and NEM2 for Storage Devices Paired with Net Energy Metering Generating Facilities
|
11/11/2022
|
N/A
|
||
10/12/2022
|
N/A
|
Request for Approval of Emergency Reliability Procurement for Summer 2022 Under Decision 21-03-056 and Decision 21-12-015
|
10/17/2022
|
D.21-03-056 and D.21-12-015
|
||
10/11/2022
|
N/A
|
Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Revenue Balancing Account Adjustment, the Reliability Services Rates, and the End-Use Customer Refund Balancing Account Adjustment
|
12/06/2022
|
N/A
|
||
10/10/2022
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
10/10/2022
|
D.14-05-016
|
||
10/10/2022
|
N/A
|
Supplemental - Information-Only Filing Regarding Net Energy Metering (NEM) Costs
|
10/20/2022
|
D.16-01-044
|
||
10/07/2022
|
N/A
|
Summer 2022 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers
|
10/07/2022
|
N/A
|
||
10/07/2022
|
54456-54467
|
Additional Modifications to the Community Microgrid Enablement Tariff (CMET) Pursuant to Resolution E-5127
|
11/07/2022
|
N/A
|
||
10/06/2022
|
N/A
|
Request to End Quarterly Reporting Obligation to Submit a Progress of Residential Rate Reform (PRRR) Report in Compliance with Decision (D.) 19-09-004
|
11/01/2022
|
D.19-19-004
|
||
10/06/2022
|
N/A
|
Request for Section 320 Scenic Highway Deviation - Installation of Distribution
|
01/12/2023
|
N/A
|
||
10/05/2022
|
N/A
|
Energy Price Updates for October 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006
|
10/05/2022
|
D.20-05-006
|
||
10/05/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020
|
11/04/2022
|
D.21-10-020
|
||
10/05/2022
|
N/A
|
Pacific Gas and Electric Company's Conformed Bundled Procurement Plan - Sales Framework (Appendix S) Update
|
10/05/2022
|
N/A
|
||
10/04/2022
|
N/A
|
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q1, 2022)
|
06/01/2022
|
D.03-12-062 and D.02-10-062
|
||
10/03/2022
|
N/A
|
Resource Adequacy Sales Agreements Pursuant to Decision 22-05-015
|
10/03/2022
|
22-05-015
|
||
10/03/2022
|
54447-54450, 38161-38162
|
Addition of Fork, Barnes, and Mountain Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
10/03/2022
|
D.19-07-015
|
||
10/03/2022
|
N/A
|
Pacific Gas and Electric Company's Informational Report on SmartRate Enrollments, Pursuant to D.19-07-004, OP 21
|
10/03/2022
|
D.19-07-004
|
||
09/30/2022
|
N/A
|
Pacific Gas and Electric Company's Conformed Bundled Procurement Plan Intent to Offer Carbon Free Energy Allocations
|
09/30/2022
|
N/A
|
||
09/30/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Tidewater-Sobrante 230kV Transmission Line Tower Replacement Project, City of Martinez
|
10/30/2022
|
N/A
|
||
09/30/2022
|
N/A
|
Pacific Gas and Electric Company's 2023 Annual Low Carbon Fuel Standard Electric Credit and Revenue Estimate
|
10/30/2022
|
D.14-12-083
|
||
09/29/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020
|
10/29/2022
|
D.21-10-020
|
||
09/29/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020
|
10/05/2022
|
D.21 10 020
|
||
09/28/2022
|
54444-54446
|
Open California Distributed Generation Statistics Website Memorandum Account -2 (CDGSWMA-2) for Continued Implementation of Resolution E-5030 Authorizing Energy Division to Oversee Contracts for Work Required to Maintain the California Distributed Generation Statistics Website
|
09/28/2022
|
N/A
|
||
09/26/2022
|
N/A
|
Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraph 9
|
10/26/2022
|
D.20-12-005
|
||
09/23/2022
|
54435-54438
|
Addition of Subaccounts to the Dynamic and Real-Time Pricing Memorandum Account (DRTPMA) Pursuant to the Settlement Agreement Adopted by D.22-08-002
|
08/04/2022
|
22-08-002
|
||
09/23/2022
|
N/A
|
This submittal provides information required by Ordering Paragraph (OP) 1 of Decision (D.) 21-10-020 regarding Pacific Gas and Electric Company's (PG&E) restoration, rebuilding, and reconstruction activities related to the Mill Fire.
|
10/23/2022
|
D.21-10-020
|
||
09/23/2022
|
N/A
|
Amendments to Mid-Term Reliability Contracts approved in Advice Letter 6477-E
|
12/01/2022
|
D.21-06-035
|
||
09/23/2022
|
54440-54443
|
Electric Rate Change Effective October 1, 2022
|
10/01/2022
|
21-11-016
|
||
09/22/2022
|
N/A
|
Pacific Gas and Electric Company's Quarterly Report, Pursuant to D. 22-06-028, Ordering Paragraph 6
|
09/22/2022
|
22-06-028
|
||
09/22/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Oakland J-Grant 115 kV Power Line Reconductoring and Structure Replacement Project, Cities of Oakland and San Leandro, County of Alameda
|
10/22/2022
|
N/A
|
||
09/21/2022
|
54434-54431, 38127-38125
|
Addition of Mosquito Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015
|
09/21/2022
|
D.19-07-015
|
||
09/20/2022
|
N/A
|
Information-Only Filing Regarding Net Energy Metering (NEM) Costs
|
Superceded
|
16-01-044
|
||
09/20/2022
|
N/A
|
Supplemental: Pacific Gas and Electric Company's Proposed Anti-Islanding Options Guidance Section for its Interconnection Handbooks Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 14
|
10/05/2022
|
D.21-06-006
|
||
09/19/2022
|
N/A
|
Pacific Gas and Electric Company ("PG&E") Central Procurement Entity ("CPE") Annual Compliance Report
|
12/06/2022
|
D.20-06-002
|
||
09/19/2022
|
54113-54427
|
Supplemental: Modifications to Electric Rule 21 and Net Energy Metering Tariffs for Generation Facilities Greater than One Megawatt Interconnecting on Transmission Pursuant to Decision 22-07-001 Ordering Paragraphs 1, 3 and 4
|
02/28/2023
|
D.22-07-001
|
||
09/16/2022
|
N/A
|
Partial Quitclaim of Easement Deeds - Request for Approval Under Section 851 and General Order 173
|
10/16/2022
|
N/A
|
||
09/16/2022
|
N/A
|
Fawn Wildfire Emergency Consumer Protections Summary
|
09/19/2022
|
19-07-015
|
||
09/15/2022
|
54070-54076
|
Supplemental - Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachments For Implementation of Resolution E-5172
|
09/26/2022
|
N/A
|
||
09/15/2022
|
N/A
|
Correction to BEV Rate Performance SB 350 SRP Annual Report 2021, Submitted as Advice Letter 6552-E
|
09/15/2022
|
19-10-055
|
||
09/15/2022
|
54078-54080, 38122-38124
|
Addition of Mill Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015
|
09/15/2022
|
19-07-015
|
||
09/09/2022
|
N/A
|
Partial Supplement to Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities
|
12/01/2021
|
N/A
|
||
09/07/2022
|
54063-54066
|
Pacific Gas and Electric Company's Tariff Updates to the Base Interruptible Program
|
Pending
|
N/A
|
||
09/07/2022
|
N/A
|
Cache Wildfire Emergency Consumer Protections Summary
|
09/07/2022
|
D.19-07-015
|
||
09/07/2022
|
54067-54068
|
Second Supplemental: Clarifications to Electric Schedule NEM2 Applicability and Special Condition requirements for transitions to the NEM Successor tariff
|
12/05/2021
|
N/A
|
||
09/06/2022
|
N/A
|
Energy Price Updates for September 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
09/06/2022
|
D.20-05-006
|
||
09/06/2022
|
54056-54060
|
Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Electric Vehicle Submetering Memorandum Subaccount
|
09/06/2022
|
22-08-024
|
||
09/06/2022
|
54062-54061
|
Pacific Gas and Electric Company's Closure of the Non-Residential C-SmartAC Tariff
|
09/06/2022
|
N/A
|
||
09/02/2022
|
N/A
|
Rate Structures for Vehicle Grid Integration Pilots
|
Pending
|
N/A
|
||
09/02/2022
|
54053-54054
|
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to E-5220
|
09/02/2022
|
N/A
|
||
09/02/2022
|
N/A
|
Hat Creek Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851
|
10/04/2022
|
08-11-043, 03-12-035, 10-08-004.
|
||
09/02/2022
|
N/A
|
Phased Implementation of the New Line-Item Discount Schedule D-MEDICAL Effective December 1, 2022, in Compliance With Decision 22-04-004
|
12/01/2022
|
D.22-04-011
|
||
09/01/2022
|
N/A
|
Southern California Edison Company, Pacific Gas & Electric Company and San Diego Gas & Electric Company's Auto Demand Response Control Incentive Guidelines and Adopted Policies Submitted, Pursuant To Decision 18-11-029
|
Superceded
|
D.18-11-029
|
||
08/31/2022
|
N/A
|
Implement New Pro-Electrification Rate Schedule E-ELEC (Residential Time-of-Use, Electric Home) Effective December 1, 2022 in Compliance With Decision 21-11-016
|
12/01/2022
|
D.21-11-016
|
||
08/31/2022
|
N/A
|
Proposed Revisions to the Self-Generation Incentive Program Handbook to Clarify Eligibility of Steam Turbine and Pressure Reduction Turbine Technologies and Reinstate Capacity Limits for Generation Projects
|
08/31/2022
|
N/A
|
||
08/30/2022
|
54006-54051
|
Electric Rate Change Effective September 1, 2022
|
09/01/2022
|
N/A
|
||
08/29/2022
|
N/A
|
Supplemental: Clarifications to Electric Schedule NEM2 Applicability and Special Condition requirements for transitions to the NEM Successor tariff
|
Superceded
|
N/A
|
||
08/24/2022
|
53991-53993
|
Supplemental: Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Subaccount (Vehicle Grid Integration "VGI" Subaccount) per Public Utilities Code Section 740.16, Enacted by Senate Bill 676
|
05/05/2022
|
N/A
|
||
08/24/2022
|
N/A
|
Second Supplemental: Implementation Details for Empower EV Pilot Program
|
06/24/2022
|
D.19-09-006
|
||
08/22/2022
|
N/A
|
Joint Utility Evaluation Process and Criteria to Assess Microgrid Different Isolation Technologies Pursuant to Final Resolution E-5194 and Decision 21-01-018
|
10/26/2022
|
D.21-01-018
|
||
08/19/2022
|
N/A
|
Pit River and Tunnel Reservoir Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
09/18/2022
|
03-12-035, D.08-11-043, D.10-08-004
|
||
08/19/2022
|
N/A
|
Update to Pacific Gas and Electric Company Bundled Procurement Plan - Procurement Methods and Processes and Liquidity Management Strategy
|
02/23/2023
|
N/A
|
||
08/18/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Martin-SF Airport 115kV Power Line Tower Replacement Project, City of South San Francisco
|
09/17/2022
|
N/A
|
||
08/17/2022
|
53964-53980
|
Modifications to Electric Rule 21 and Net Energy Metering Tariffs for Generation Facilities Greater than One Megawatt Interconnecting on Transmission Pursuant to Decision 22-07-001 Ordering Paragraphs 1, 3 and 4
|
Superceded
|
D.22-07-001
|
||
08/17/2022
|
N/A
|
Information Only: After-Meeting Reports for Semi-Annual Resiliency Workshops Pursuant to Decision 20-06-017
|
08/17/2022
|
20-06-017
|
||
08/17/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020
|
09/16/2022
|
21-10-020
|
||
08/16/2022
|
N/A
|
Joint Submittal Community-Based Organization Arrears Case Management Pilot Proposal in Compliance with D.22-04-037
|
Withdrawn
|
D.22-04-037
|
||
08/16/2022
|
N/A
|
Second Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q4, 2021)
|
03/02/2022
|
D.03-12-062 and D.02-10-062
|
||
08/16/2022
|
N/A
|
Pacific Gas and Electric Company, Center for Sustainable Energy, Southern California Edison Company, and Southern California Gas Company's Proposed Modifications to Inspections Protocol Procedures in the Self-Generation Incentive Program
|
09/15/2022
|
N/A
|
||
08/15/2022
|
53914-53918
|
Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding Effective September 1, 2022
|
09/01/2022
|
21-11-016
|
||
08/12/2022
|
53930-53936
|
Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E-5172
|
11/04/2022
|
D.20-09-035
|
||
08/12/2022
|
53938-53950
|
Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172 and PG&E's Request for Extension of Time to Comply with D.20-09-035 Ordering Paragraphs 2 , 6, and 11 as Discussed in Resolution E-5172
|
11/04/2022
|
N/A
|
||
08/11/2022
|
53920-53927
|
Tariff Modifications to the Portfolio Allocation Balancing Account and Energy Resource Recovery Account to Support Green Tariff Shared Renewables Program Interim Pool Resources
|
09/10/2022
|
21-12-036
|
||
08/05/2022
|
N/A
|
Energy Price Updates for August 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006
|
08/05/2022
|
N/A
|
||
08/05/2022
|
N/A
|
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003
|
08/05/2022
|
18-12-003
|
||
08/05/2022
|
N/A
|
Supplement to Advice Letter 6626-E Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003
|
08/05/2022
|
18-12-003
|
||
08/05/2022
|
53896-53897, 38077-38078
|
Addition of Oak Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
08/05/2022
|
19-07-015.
|
||
08/05/2022
|
N/A
|
Antelope, River, McFarland, Monument, and Caldor Wildfires Events Emergency Consumer Protections Summary
|
08/05/2022
|
19-07-015
|
||
08/05/2022
|
53901-53906
|
Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachments For Implementation of Resolution E-5172
|
Superceded
|
N/A
|
||
08/04/2022
|
53892-53893
|
Modification of the Transmission Load Operating Agreement (TLOA) for the Caltrain Electrification Project
|
Pending
|
N/A
|
||
08/03/2022
|
N/A
|
Supplemental: Amendments for Contracts Not Yet Operational in the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with D.20-08-043
|
06/23/2022
|
D.20-08-043
|
||
08/02/2022
|
53875-53888
|
Clean-Up of Rule 21/Net Energy Metering (NEM) Tariffs and Forms
|
08/22/2022
|
N/A
|
||
08/01/2022
|
53858-53859
|
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.20-08-046
|
08/01/2022
|
D.20-08-046
|
||
08/01/2022
|
N/A
|
Procurement Transaction Quarterly Compliance Submittal (Q2 2022)
|
08/21/2022
|
D.03-12-062 and D.02-10-062
|
||
07/29/2022
|
N/A
|
Request for Approval of PG&E's Pending Extension Request to Develop a Clean Substation Microgrid Project
|
Withdrawn
|
21-01-018
|
||
07/29/2022
|
53840-53852
|
Supplemental: Rate Implementation Plan Pursuant to Decision 22-05-015 to Implement Cost Recovery Associated with Reliability Contracts Procured to Meet the Modified Cost Allocation Mechanism Targets Established in Decision 19-11-016 and Mid-Term Reliability Targets Established in D.21-06-035. Establishment of Electric Preliminary Statement Part JN, Modified Cost Allocation Mechanism Balancing A
|
01/12/2023
|
19-11-016, D.21-06-035
|
||
07/28/2022
|
N/A
|
Pacific Gas & Electric's Interim Rate Relief Wildfire Mitigation and Catastrophic Events, A.20-02-003 Reconciliation of Revenues Collected Through June 30, 2022
|
07/28/2022
|
D.20-10-026
|
||
07/27/2022
|
53828-53833
|
Modifications to PG&E's Electric Rule No. 21 Tariff ("Generating Facility Interconnections") To Address Direct Current Electric Vehicle Supply Equipment Projects Certification Time Frame
|
07/27/2022
|
N/A
|
||
07/26/2022
|
N/A
|
PG&E's Spring 2022 Solar Choice and Regional Renewable Choice RFOs - Collectively the Spring 2022 GTSR RFOs
|
11/16/2022
|
21-12-036
|
||
07/25/2022
|
53805-53806
|
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program tariff Pursuant to Resolution E-5209
|
07/25/2022
|
N/A
|
||
07/25/2022
|
53808-53826
|
Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E-5172
|
Superceded
|
D.20-09-035
|
||
07/22/2022
|
N/A
|
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d) related to Decision 21-05-015
|
07/22/2022
|
21-05-015
|
||
07/22/2022
|
N/A
|
Vegetation Management Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8
|
08/22/2022
|
20-12-005
|
||
07/22/2022
|
N/A
|
Dixie, Fly, and Tamarack Wildfires Emergency Consumer Protections Summary
|
07/22/2022
|
19-07-015
|
||
07/21/2022
|
N/A
|
Pacific Gas and Electric Company (PG&E) 2nd Quarter 2022 Solar Complaint Trends Information-Only Advice Letter
|
07/21/2022
|
D.18-09-044
|
||
07/20/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020
|
08/19/2022
|
D.21-10-020
|
||
07/20/2022
|
N/A
|
Amendments to System Reliability Contracts approved in Advice Letter 6033-E, Procurement Toward Procurement Requirements Under D.19-11-016 - Nexus Renewables and NextEra North Central Valley
|
10/06/2022
|
19-11-016
|
||
07/20/2022
|
53744-53803
|
Supplemental: Modifications to Electric Tariff Rule 21 to Incorporate IEEE 1547.1-2020 Test Procedures into Testing Regime for Phase 2 and 3 Requirements in Compliance with Resolutions E-5000 and E5036
|
08/29/2023
|
N/A
|
||
07/18/2022
|
53713-53727
|
Rate Implementation Plan pursuant to Decision 22-05-015 Directives to Implement Cost Recovery associated with Reliability Contracts Procured to Meet the Modified Cost Allocation Mechanism Targets Established in Decision 19-11-016 and Mid-Term Reliability Targets Established in D.21-06-035. Establishment of Preliminary Statement JN, Modified Cost Allocation Mechanism Balancing Account
|
Superceded
|
19-11-016, D.21-06-035
|
||
07/15/2022
|
53688-53706, 38002-38012
|
Addition of Alisal and Colorado Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
07/15/2022
|
19-07-015
|
||
07/15/2022
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
07/15/2022
|
N/A
|
||
07/14/2022
|
N/A
|
Issuance Advice Letter Submission for Recovery Bonds
|
07/19/2022
|
D.21-05-015
|
||
07/14/2022
|
N/A
|
Revision of Securitization Customer Credit to Match Fixed Recovery Charges
|
09/01/2022
|
21-05-015
|
||
07/14/2022
|
N/A
|
Joint Utility Advice Letter to Update to Investor Owned-Utilities' 2021
Recorded GHG Proceeds and Share of $100 Million
|
07/14/2022
|
20-04-012
|
||
07/14/2022
|
N/A
|
Supplemental: Implementation Details for Empower EV Pilot Program
|
Superceded
|
19-09-006
|
||
07/12/2022
|
53682-53681
|
Modifications to Electric Rate Schedule EV2 to Expand Eligibility to Residential Customers Using an Electric Heat Pump as Their Primary Means for Either Water Heating or Climate Control in Compliance With Decision 21-11-016
|
10/24/2022
|
21-11-016
|
||
07/11/2022
|
N/A
|
Routine Semi-Annual Advice Letter for Fixed Recovery Charges True-Up Mechanism
|
07/08/2022
|
D.21-05-015
|
||
07/11/2022
|
N/A
|
Routine Semi-Annual Advice Letter for Fixed Recovery Charges True-Up Mechanism
|
07/08/2022
|
21-06-03
|
||
07/11/2022
|
53678-53679
|
Modifications to PG&E's Form 79-1174-02 ("Rule 21 Generator Interconnection Application") Attachments to Incorporate an Exception Option to the Latest Smart Inverter Requirements for Interconnections Participating in the Emergency Load Reduction Program
|
07/20/2022
|
N/A
|
||
07/08/2022
|
N/A
|
Vegetation Management Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8
|
Withdrawn
|
20-12-005
|
||
07/08/2022
|
N/A
|
Tier 1 Advice Letter re Executive Compensation
|
07/08/2022
|
N/A
|
||
07/07/2022
|
N/A
|
Second Supplemental: Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022
|
08/06/2022
|
D.18-05-022
|
||
07/07/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Sobrante-Moraga 115kV Power Line Project, City of Orinda
|
08/06/2022
|
N/A
|
||
07/07/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Ignacio- Alto 60 kV Power Line Replacement Project in the City of Larkspur
|
08/06/2022
|
N/A
|
||
07/07/2022
|
53675-53676, 37995-37992
|
Implement Tariff Changes in Compliance with Decision (D.) 22-06-033
|
07/07/2022
|
22-06-033
|
||
07/06/2022
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
Effective Pending Final Disposition
|
D.14-05-016
|
||
07/05/2022
|
N/A
|
Energy Price Updates for July 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006
|
07/05/2022
|
D.20-05-006
|
||
07/01/2022
|
53600-53673
|
Modifications to Electric Tariff Rule 21 to Incorporate IEEE 1547.1-2020 Test Procedures into Testing Regime for Phase 2 and 3 Requirements in Compliance with Resolutions E-5000 and E 5036
|
Superceded
|
N/A
|
||
07/01/2022
|
N/A
|
Justification for PG&E's V2X Pilot 2 (Commercial Fleets Pilot)
|
08/11/2022
|
N/A
|
||
07/01/2022
|
N/A
|
Demonstration of Pathways to Scale Implementation of PG&E's Vehicle-Grid Integration (VGI) Pilot #3: Microgrids Pilot
|
07/31/2022
|
N/A
|
||
07/01/2022
|
N/A
|
Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company's Effective Load Carrying Capability Study Submission
|
07/31/2022
|
D.19-09-043
|
||
06/30/2022
|
N/A
|
Supplemental: Update to Back of Bill Sample Form to Reflect New Fixed Recovery Charge and Customer Credit Definitions in Compliance with OP 41 of D.21-05-015
|
06/01/2022
|
21-05-015
|
||
06/30/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Northern Orchard PV Interconnection Project and Bitterwater Switching Station in Kern County
|
07/30/2022
|
N/A
|
||
06/30/2022
|
N/A
|
PG&E's Annual Advanced Energy Rebuild Advice Letter in Compliance with Commission Disposition
|
06/30/2022
|
N/A
|
||
06/30/2022
|
N/A
|
Measurement and Evaluation Study Proposal and Budget for PG&E's E-ELEC Rate, Pursuant to D.21-11-016
|
04/06/2023
|
21-11-016
|
||
06/29/2022
|
N/A
|
Second Supplemental: PG&E's Pension-Related Revenue Requirement for 2022
|
02/03/2022
|
N/A
|
||
06/28/2022
|
53593-53599
|
Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Subaccount (Vehicle Grid Integration "VGI" Subaccount) per Public Utilities Code Section 740.16, Enacted by Senate Bill 676
|
05/05/2022
|
N/A
|
||
06/27/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Wheeler Ridge Pole Replacement Project Order # 74043005
|
07/27/2022
|
N/A
|
||
06/27/2022
|
N/A
|
Submittal of New Qualifying Facilities Standard Offer Contract in Conformance to Decision 22-06-003
|
06/27/2022
|
22-06-003
|
||
06/24/2022
|
N/A
|
Recovery of Pacific Gas and Electric's Costs as the Contracting and Fiscal Agent for the Statewide Market Transformation Program
|
06/24/2022
|
D.19-12-021
|
||
06/23/2022
|
N/A
|
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q4, 2021)
|
03/02/2022
|
D.03-12-062 and D.02-10-062
|
||
06/22/2022
|
53581-53585
|
Revision to Electric Preliminary Statement Part GZ for Recovery of Costs Associated with the Partnership Pilot and Standard-Offer-Contract Pilot Pursuant to Decision 21-02-006
|
Effective Pending Final Disposition
|
21-02-006
|
||
06/22/2022
|
N/A
|
January 2021 Wind Events Emergency Consumer Protections Summary
|
06/22/2022
|
19-07-015
|
||
06/22/2022
|
53586-53589
|
Clean-Up of Electric Forms 79-1220 and 79-1220-02
|
06/22/2022
|
N/A
|
||
06/22/2022
|
53590-53591
|
Remote Grids as Sole Standard Service Offering
|
01/12/2023
|
N/A
|
||
06/21/2022
|
N/A
|
California Public Utilities Code Section 8386.3(d) Vegetation Management Revenue Requirements
|
06/23/2022
|
N/A
|
||
06/21/2022
|
N/A
|
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003
|
08/10/2022
|
18-12-003
|
||
06/17/2022
|
53578-53579, 37953-37954
|
Supplemental: Establishment of the Dixie Fire Mobilehome Park Rebuild Agreement (Form 79-1222) for Mobilehome Park Owners/Operators affected by the Dixie Fire
|
06/10/2022
|
N/A
|
||
06/17/2022
|
N/A
|
Implementing the 2020 Energy Resource Recovery Account (ERRA) Decision 22-04-041
|
06/17/2022
|
22-04-041
|
||
06/17/2022
|
N/A
|
2022 Affiliate Transaction Rules Compliance Plan
|
06/17/2022
|
97-12-088 and 06-12-029
|
||
06/16/2022
|
N/A
|
Emergency Reliability Resource Adequacy Procurement for 2022 Demand Response Pursuant to Decision 21-12-015
|
06/16/2022
|
21-12-015
|
||
06/14/2022
|
53570-53577, 37947-37951
|
Modification to Electric Preliminary Statement Part GQ and Gas Preliminary Statement Part DJ
|
06/14/2022
|
21-08-006
|
||
06/10/2022
|
N/A
|
Rider and Amendment to Pacific Gas and Electric's Bioenergy Market Adjusting Tariff Power Purchase Agreement to be executed with Scotts Valley Energy Company, LLC
|
04/27/2023
|
N/A
|
||
06/09/2022
|
N/A
|
Tier 2 Advice Letter Regarding Initial Shareholder Contribution Under Decision 21-04-030
|
07/09/2022
|
21-04-030
|
||
06/06/2022
|
N/A
|
Energy Price Updates for June 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006
|
06/06/2022
|
20-05-006
|
||
06/03/2022
|
N/A
|
Pacific Gas and Electric Company's Proposed Anti-Islanding Options Guidance Section for its Interconnection Handbooks Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 14
|
Superceded
|
21-06-006
|
||
06/03/2022
|
N/A
|
Joint Consensus Proposal Regarding Template Aggregator Agreement
Pursuant to Decision 21-06-002
|
07/05/2022
|
21-06-006
|
||
06/01/2022
|
N/A
|
Operational Flexibility Pilot Proposal Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 18
|
Pending
|
D.21-06-006
|
||
06/01/2022
|
N/A
|
Self-Generation Incentive Program Funded Energy Storage Installations
|
06/01/2022
|
16-09-007
|
||
05/31/2022
|
53354-53558
|
Supplemental: Electric Rate Change Effective June 1, 2022
|
06/01/2022
|
N/A
|
||
05/31/2022
|
53284-53283, 37937-37936
|
Update to Back of Bill Sample Form to Reflect New Fixed Recovery Charge and Customer Credit Definitions in Compliance with OP 41 of D.21-05-015
|
06/01/2022
|
21-05-015
|
||
05/31/2022
|
N/A
|
PG&E's 2023 Demand Response Auction Mechanism Purchase Agreements
|
06/30/2022
|
19-12-040
|
||
05/31/2022
|
53287-53293
|
Modifications to PG&E's Form 79-1174-02 ("Rule 21 Generator Interconnection Application") Attachments to Incorporate an Exception Option to the Latest Smart Inverter Requirements for Interconnections Participating in the Emergency Load Reduction Program
|
Superceded
|
N/A
|
||
05/27/2022
|
N/A
|
Joint Utility Advice Letter in Compliance with Ordering Paragraph 8 of Resolution E-5167 and Ordering Paragraph 8 of Resolution E-5168
|
12/15/2022
|
N/A
|
||
05/26/2022
|
N/A
|
Implementation Details for Empower EV Pilot Program
|
Superceded
|
19-09-006
|
||
05/24/2022
|
N/A
|
Procurement for Summer 2022 Under Decision 21-03-056 and Decision 21-12-015
|
05/29/2022
|
D.21-03-056 and D.21-12-015
|
||
05/24/2022
|
N/A
|
Amendments for Contracts Not Yet Operational in the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with D.20-08-043
|
06/23/2022
|
D.20-08-043
|
||
05/23/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Giffen Tap 70kV Line in west Fresno County
|
06/22/2022
|
N/A
|
||
05/23/2022
|
N/A
|
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Market Offer Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources
|
10/19/2022
|
D.22-01-004
|
||
05/20/2022
|
N/A
|
Electric Rate Change Effective June 1, 2022
|
06/01/2022
|
21-05-015, 21-04-030, 21-11-016.
|
||
05/19/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Ravenswood-Ames 115kV Reconductor and Tower Replacement Project in the City of Mountain View
|
06/18/2022
|
N/A
|
||
05/19/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Trinity-Cottonwood 115 kV Power Line Reconductoring and Pole Replacement Project in the Cities of Redding and Anderson, County of Shasta
|
06/18/2022
|
N/A
|
||
05/18/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Jameson-Vallejo 115kV Reconductor and Structure Replacement Project in the Cities of Fairfield and Vallejo, Counties of Solano and Napa
|
06/17/2022
|
N/A
|
||
05/18/2022
|
53120-53127
|
Revisions to Electric Schedule EDR - Economic Development Rate and Sample Form 79-1222, Agreement for Economic Development Rate on Electric Service in Compliance with Decision 21-11-016
|
06/17/2022
|
21-11-016
|
||
05/17/2022
|
N/A
|
Supplemental: Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022
|
Superceded
|
D.18-05-022
|
||
05/17/2022
|
N/A
|
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet July 2022 Local Resource Adequacy Procurement Obligations
|
05/03/2023
|
D.19-06-026
|
||
05/16/2022
|
N/A
|
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d) related to Decision 21-05-015
|
05/16/2022
|
21-05-015
|
||
05/16/2022
|
N/A
|
Notification of Energy Resource Recovery Account (ERRA) Reaching the Trigger Amount in Compliance with Decision 02-10-062, Decision 08-08-011, and Decision 22-01-023
|
06/15/2022
|
02-10-062, 08-08-011, 22-01-023
|
||
05/16/2022
|
N/A
|
PG&E Compliance with Ordering Paragraphs 3, 4, and 5 of Decision 21-09-026
|
06/10/2022
|
D.21-09-026
|
||
05/13/2022
|
N/A
|
Annual Capacity Price Updates Offered to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
05/13/2022
|
D.20-05-006
|
||
05/12/2022
|
53112-53116
|
Modifications to the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with CPUC Decision 20-08-046
|
06/11/2022
|
D.20-08-046
|
||
05/11/2022
|
53109-53110, 37898-37899
|
Establishment of the Dixie Fire Mobilehome Park Rebuild Agreement (Form 79-1222) for Mobilehome Park Owners/Operators affected by the Dixie Fire
|
06/10/2022
|
N/A
|
||
05/11/2022
|
N/A
|
JOINT UTILITIES' REQUEST FOR COMMISSION APPROVAL TO USE A PORTION OF THE INTER-AGENCY WORKING GROUP'S TRANSPORTATION ELECTRIFICATION FORECAST COMPONENT IN EACH UTILITY'S 2023-2024 GNA/DDORS
|
Withdrawn
|
18-02-004
|
||
05/10/2022
|
N/A
|
Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance with D.13-01-021, D.13-02-017, and D.13-04-001
|
06/09/2022
|
13-01-021, 13-02-017, and 13-04-001
|
||
05/10/2022
|
N/A
|
Lake Spaulding - Rucker Land Retained - Request for Approval under Decision (D.) 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
06/10/2022
|
03-12-035, D.08-11-043, D.10-08-004
|
||
05/10/2022
|
N/A
|
Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022
|
Superceded
|
D.18-05-022
|
||
05/10/2022
|
N/A
|
Bear River Land Donation - Request for Approval under Decision (D.) 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
06/10/2022
|
N/A
|
||
05/09/2022
|
N/A
|
Diablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter
|
05/09/2022
|
88-12-083
|
||
05/09/2022
|
53104-53107
|
Second Supplemental: Proposed Amendments to PG&E LS-1 and TC-1 Rate Schedules and implementation of proposed changes pursuant to Section 9.2.3 of General Order 96-B.
|
Rejected
|
N/A
|
||
05/06/2022
|
N/A
|
Battle Creek Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
06/10/2022
|
D.03-12-035, D.08-11-043, D.10-08-004
|
||
05/06/2022
|
N/A
|
Supplemental: Net Electric and Gas Bill Impact Study for Residential Customers Who Switch from Natural Gas Water Heater to Heat Pump Water Heater in Compliance with D.21-11-002
|
12/01/2022
|
N/A
|
||
05/06/2022
|
N/A
|
PG&E's DAHRTP CEV M&E Plan
|
Superceded
|
21-11-017
|
||
05/05/2022
|
N/A
|
Energy Price Updates for May 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
05/05/2022
|
D.20-05-006
|
||
05/05/2022
|
N/A
|
Notice to Suspend Competitive Solicitations for Distributed Energy Resource (DER) Procurement for Electric Distribution Deferral Opportunities at Vierra Substation
|
06/05/2022
|
18-02-004
|
||
05/04/2022
|
N/A
|
Issuance Advice Letter Submission for Recovery Bonds
|
05/09/2022
|
21-05-015
|
||
05/04/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the North Central Valley Energy Center 115 kV Generation Power Line in the County of San Joaquin
|
06/03/2022
|
N/A
|
||
05/04/2022
|
N/A
|
Notification of the Creation of a New Affiliate: PG&E Wildfire Recovery Funding LLC
|
05/04/2022
|
97-12-088, D.98-08-035 and D.06-12-029
|
||
05/03/2022
|
N/A
|
Customer Credit Advice Letter to Match Fixed Recovery Charges
|
06/01/2022
|
21-05-015
|
||
05/03/2022
|
N/A
|
Supplemental: BEV Rate Performance SB 350 SRP Annual Report 2021
|
04/01/2022
|
19-10-055
|
||
05/02/2022
|
53088-53084, 37888-37887
|
Revised Household Income Requirements for California Alternate Rates for Energy (CARE) and Family Electric Rate Assistance (FERA) Programs and Modification of Applicable Forms
|
06/01/2022
|
N/A
|
||
05/02/2022
|
N/A
|
Procurement Transaction Quarterly Compliance Submittal (Q1 2022)
|
06/01/2022
|
D.03-12-062 and D.02-10-062
|
||
04/29/2022
|
53001-53063
|
Modifications to PG&E's Electric Rule 21 to Incorporate Approved Language Regarding an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861
|
05/29/2022
|
N/A
|
||
04/29/2022
|
N/A
|
Dedication for Street Purposes of One Parcel of Unimproved Land in the City of Bakersfield in Kern County - Request for Approval Under Section 851 and General Order 173
|
05/23/2022
|
N/A
|
||
04/29/2022
|
52984-52988, 37864-37866
|
Clean-Up of Gas and Electric Tariffs
|
04/29/2022
|
N/A
|
||
04/28/2022
|
N/A
|
Lake Spaulding Land Donation - Request for Approval under Decision 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
05/18/2022
|
03-12-035, D.08-11-043, D.10-08-004
|
||
04/25/2022
|
52941-52942
|
Supplemental: Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.21-12-032
|
08/25/2022
|
D.21-12-032
|
||
04/22/2022
|
52912-52937
|
Revising Departing Load Tariffs and Electric Preliminary Statement Part JG Pursuant to Decision 21-06-030
|
05/22/2022
|
21-06-030
|
||
04/22/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Clawiter Road Industrial Project in the City of Hayward, County of Alameda
|
05/19/2022
|
N/A
|
||
04/21/2022
|
N/A
|
Pacific Gas and Electric Company (PG&E) 1st Quarter 2022 Solar Complaint Trends Information-Only Advice Letter
|
04/21/2022
|
18-09-044
|
||
04/19/2022
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Advocacy Contract Change Order executed between Cohen Ventures, Inc. and PG&E
|
05/19/2022
|
18-01-004
|
||
04/18/2022
|
N/A
|
Illustrative Electric Rate Changes Pursuant to Decision 21-11-016 in PG&E's 2020 General Rate Case Phase 2 Proceeding
|
06/01/2022
|
21-11-016
|
||
04/18/2022
|
52894-52895
|
Supplemental: Proposed Amendments to PG&E LS-1 and TC-1 Rate Schedules and implementation of proposed changes pursuant to Section 9.2.3 of General Order 96-B.
|
Rejected
|
N/A
|
||
04/18/2022
|
N/A
|
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet June 2022 Local Resource Adequacy Procurement Obligations
|
05/03/2022
|
06-06-064 and 07-06-029
|
||
04/15/2022
|
N/A
|
Pacific Gas and Electric's 2021 Unspent and Uncommitted Energy Efficiency Funds Applicable to AB 841 Schools Energy Efficiency Stimulus Program
|
05/15/2022
|
21-01-004
|
||
04/15/2022
|
52883-52892
|
Revisions to Fees for Services to Community Choice Aggregation and Direct Access Electric Service Providers Pursuant to Decision 21-11-016
|
05/15/2022
|
21-11-016
|
||
04/15/2022
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
04/15/2022
|
21-04-015
|
||
04/14/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020
|
04/01/2022
|
21-10-020
|
||
04/13/2022
|
N/A
|
Modification of Pacific Gas and Electric Company Easement to Accommodate Property Development - Request for Approval Under Section 851 and General Order 173
|
05/09/2022
|
N/A
|
||
04/13/2022
|
N/A
|
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q3, 2021)
|
12/01/2021
|
D.03-12-062 and D.02-10-062
|
||
04/12/2022
|
52873-52878
|
Implementing revised Electric Scheduled E-RSMART in compliance with Decision (D.)19-07-004 and D.21-03-056
|
05/01/2022
|
19-07-004 and D.21-03-056
|
||
04/12/2022
|
52880-52881
|
Supplemental: Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachment H to Support the Vehicle-to-Grid Pathway Pursuant to the Rule 21 Working Group 2 and 3 Decision
20-09-035, with Modifications Pursuant to Resolution E-5165
|
05/16/2022
|
D.20-09-035
|
||
04/11/2022
|
N/A
|
Information Only: After-Meeting Reports for Semi-Annual Resiliency Workshops Pursuant to Decision 20-06-017
|
06/02/2022
|
20-06-017
|
||
04/11/2022
|
N/A
|
Supplemental: Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Voluntary Allocation Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources
|
06/23/2022
|
D.22-01-004
|
||
04/08/2022
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
04/08/2022
|
D.14-05-016
|
||
04/08/2022
|
52870-52871
|
Supplemental: Deviation for the United States Coast Guard TRACEN Petaluma from Certain Requirements in Pacific Gas and Electric Company's Electric Rule 21 Filed Form 79-1069-02 Generating Facility Interconnection Agreement (Multiple Tariff NEM2MT)
|
08/25/2022
|
N/A
|
||
04/07/2022
|
N/A
|
Supplemental: Pacific Gas and Electric Company's Advice Letter to D.21-12-015 Agricultural Pumping Dynamic Rate Pilot
|
03/06/2022
|
21-12-015
|
||
04/07/2022
|
52865-52867, 37815-37817
|
Addition of Counties Impacted by the October 2021 Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
04/07/2022
|
19-07-015
|
||
04/06/2022
|
52853-52855
|
Deviation for the United States Coast Guard TRACEN Petaluma from Certain Requirements in Pacific Gas and Electric Company's Electric Rule 21 Filed Form 79-1069-02 Generating Facility Interconnection Agreement (Multiple Tariff NEM2MT)
|
08/25/2022
|
N/A
|
||
04/05/2022
|
N/A
|
Energy Price Updates for April 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
04/05/2022
|
D.20-05-006
|
||
04/05/2022
|
52851-52850
|
Creation of New Electric Sample Form 79-1221 - Agreement To Perform Electric Rule 29 Tariff Schedule Related Work
|
04/05/2022
|
N/A
|
||
04/04/2022
|
N/A
|
Annual Advice Letter for the Disbursement of Funds from the Humboldt Bay Power Plant Unit 3 Nuclear Decommissioning Trusts
|
05/04/2022
|
N/A
|
||
04/04/2022
|
N/A
|
Tier 2 Advice Letter Seeking Approval of Investment Management Agreements for the Customer Credit Trust
|
05/19/2022
|
21-04-030
|
||
04/04/2022
|
N/A
|
Revised Proposal for Self-Generation Incentive Program (SGIP) Residential Price Cap in Accordance with Decision 19-09-027, Ordering Paragraphs 7(g) and 8(a).
|
05/04/2022
|
19-09-027
|
||
04/04/2022
|
52861-
|
Supplemental: Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding
|
04/18/2022
|
N/A
|
||
04/04/2022
|
N/A
|
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Market Offer Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources
|
10/19/2022
|
D.22-01-004
|
||
04/01/2022
|
N/A
|
Joint Utility Tier 3 Advice Letter to Request an Adjustment
to the Approved Program Metrics Used to Determine Per Se
Reasonableness Pursuant to Decision 18-05-040 Ordering
Paragraph 2
|
Pending
|
18-05-040
|
||
04/01/2022
|
N/A
|
Advice Letter regarding an Encroachment Agreement with Peralta Community College District of Alameda County for construction of a multipurpose Learning Resource Center - Request for Approval Under Section 851 and General Order 173
|
04/30/2022
|
N/A
|
||
04/01/2022
|
N/A
|
Annual Update regarding Pacific Gas and Electric Company's Climate Vulnerability Assessment
|
04/01/2022
|
D.20-08-046
|
||
04/01/2022
|
N/A
|
Annual Report for Relocation Work Performed for the California High-Speed Rail Authority (CHSRA), in Compliance with Resolution G-3498
|
05/09/2022
|
N/A
|
||
04/01/2022
|
N/A
|
Supplemental: 2023 Budget Request for the Disadvantaged Community Green Tariff (DAC-GT) and Community Solar Green Tariff (CS-GT) Programs
|
05/11/2022
|
N/A
|
||
04/01/2022
|
52844-52849
|
Modifications to Electric Rule 21 Pursuant to Emergency Load Reduction Program Decision 21-02-015
|
05/01/2022
|
D.21-02-015
|
||
04/01/2022
|
N/A
|
Progress on Energy Storage Procurement at the Mesa Substation in Compliance with Decision 20-05-006
|
06/03/2022
|
20-05-006
|
||
04/01/2022
|
N/A
|
BEV Rate Performance SB 350 SRP Annual Report 2021
|
04/01/2022
|
N/A
|
||
03/31/2022
|
N/A
|
Winter 2021 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers
|
03/31/2022
|
N/A
|
||
03/31/2022
|
N/A
|
Update to Pacific Gas and Electric Company's Bundled Procurement Plan -Natural Gas Procurement Limits (Appendix C) and Risk Management Policy and TeVAR Methodology (Appendix N)
|
03/31/2022
|
07-12-052
|
||
03/31/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Crag View-Cascade 115kV Power Line Reconductoring and Pole Replacement Project, County of Shasta
|
05/02/2022
|
N/A
|
||
03/30/2022
|
52841-52842
|
Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachment H to Support the Vehicle-to-Grid Pathway Pursuant to the Rule 21 Working Group 2 and 3 Decision 20-09-035, with Modifications Pursuant to Resolution E-5165
|
Superceded
|
D.20-09-035
|
||
03/29/2022
|
N/A
|
Conveyance of Antioch Dunes Property to USFWS - Request for Approval Under Section 851 and General Order 173
|
05/02/2022
|
N/A
|
||
03/25/2022
|
N/A
|
Updates to Pacific Gas and Electric Company's Remote Grid Initiative Tariff Deviation Customers
|
03/25/2022
|
N/A
|
||
03/25/2022
|
N/A
|
Implementation of Decision 21-10-019 on PG&E's Pole Attachment Database System
|
08/29/2022
|
21-10-019
|
||
03/25/2022
|
N/A
|
Supplemental: Proposal to Implement Specific Technical Requirements for Telemetering of Distribution-Connected Systems 1 Megawatt (MW) or Greater, and Less Than 10 MW, Pursuant to Resolution E-5038
|
10/04/2022
|
N/A
|
||
03/23/2022
|
N/A
|
Supplemental - Joint Investor Owned Utility Proposed Modifications to Electric Rule 21 to Incorporate an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861
|
04/14/2022
|
N/A
|
||
03/22/2022
|
52833-52836
|
Supplemental: Updates to Electric Rule 29, as per Ordering Paragraph 4 of Resolution E-5167
|
01/05/2022
|
N/A
|
||
03/22/2022
|
N/A
|
Information-Only Submittal - Frequency Deviations Report for the Period February 23, 2021 through February 22, 2022 Pursuant to Resolution E-4898 Ordering Paragraph 4 and PG&E Advice Letter 5336-E-A
|
03/22/2022
|
N/A
|
||
03/22/2022
|
N/A
|
Information-Only Voltage Complaints Reports for the Period February 22, 2021 to February 21, 2022 Pursuant to Resolution E-4898 Ordering Paragraph 7
|
03/22/2022
|
N/A
|
||
03/21/2022
|
52811-52831
|
Requested modifications to PG&E's Electric Schedule NEM2 and Interconnection Form 79-1193-02 to extend use of a Power Control System (PCS) to Small NEM Paired Storage to ensure NEM Integrity, and other modifications to improve clarity
|
12/01/2022
|
N/A
|
||
03/18/2022
|
N/A
|
Information Only Volt-Watt Quarterly Report for the Period November. 19, 2021 thru Feb. 17, 2022 Pursuant to Resolution E-5016
|
03/18/2022
|
N/A
|
||
03/18/2022
|
N/A
|
Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding
|
04/18/2022
|
D.21-11-016
|
||
03/17/2022
|
N/A
|
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet May 2022 Local Resource Adequacy Procurement Obligations
|
02/17/2023
|
06-06-064 and 07-06-029
|
||
03/16/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Proxima Solar Interconnection & Fink Switching Station Project in the County of Stanislaus
|
04/14/2022
|
N/A
|
||
03/15/2022
|
52798-52808
|
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.21-12-032
|
08/25/2022
|
D.21-12-032
|
||
03/14/2022
|
52783-52790
|
Modifying Electric Preliminary Statement Part HM and Electric Preliminary Statement Part HS Pursuant to Decision 22-02-002
|
03/14/2022
|
22-02-002
|
||
03/14/2022
|
N/A
|
Request to Recover 2021 Liability Insurance Costs in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005
|
05/15/2022
|
20-12-005
|
||
03/14/2022
|
N/A
|
Green Tariff Shared Renewables Conforming Rate Calculations Pursuant to D.21-12-036, as Ordered in Decision 22-02-002
|
06/13/2022
|
N/A
|
||
03/11/2022
|
N/A
|
Supplement to Advice 4601-E et al., Joint Investor-Owned
Utilities Advice Letter Pursuant to Decision 21-06-015 for the
Online Data Management and Visualization Dashboard Plan
|
04/10/2022
|
21-06-015
|
||
03/11/2022
|
N/A
|
Pit River Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
04/07/2022
|
D.03-12-035 D.08-11-043, D.10-08-004
|
||
03/11/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Los Banos-Padre Flat Switching Station 230 kV Reconductoring Project in Merced County.
|
04/10/2022
|
N/A
|
||
03/11/2022
|
N/A
|
Supplemental: Proposed Updates to the Self-Generation Incentive Program (SGIP) Handbook California Manufacturer Adder Methodology in Compliance with Ordering Paragraph 2 of Decision (D.)Supplemental: Proposed Updates to the Self-Generation Incentive Program (SGIP) Handbook California Manufacturer Adder Methodology in Compliance with Ordering Paragraph 2 of Decision (D.)19-02-006
|
04/10/2022
|
D.19-02-006
|
||
03/09/2022
|
N/A
|
Proposed New Lease to Marina View Heights Association; Bass Lake, County of Madera - Request for Approval Under Section 851 and General Order 173
|
04/08/2022
|
N/A
|
||
03/09/2022
|
N/A
|
Second Supplemental: Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Ignacio-Alto-Sausalito #1 and #2 60 kV Power Lines, SCADA Switch Program, in the City of Mill Valley, County of Marin
|
06/23/2022
|
N/A
|
||
03/07/2022
|
N/A
|
Energy Price Updates for March 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
03/07/2022
|
D.20-05-006
|
||
03/07/2022
|
N/A
|
Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company's Integrated Demand-Side Management Program Guidance, Pursuant to Decision 12-12-015
|
04/06/2022
|
21-12-015
|
||
03/07/2022
|
N/A
|
Supplemental: PG&E's Pension-Related Revenue Requirement for 2022
|
02/03/2022
|
N/A
|
||
03/01/2022
|
N/A
|
2021 True-Up for the Solar on Multifamily Affordable Housing (SOMAH) Program Funding
|
03/01/2022
|
20-04-012
|
||
02/28/2022
|
N/A
|
Green Tariff Shared Renewables Updated 20-Year Forecast
|
02/28/2022
|
N/A
|
||
02/28/2022
|
N/A
|
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Voluntary Allocation Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources
|
06/23/2022
|
D.22-01-004
|
||
02/25/2022
|
52557-52558
|
Modifying Electric Preliminary Statement Part CP and Electric Preliminary Statement Part HS Pursuant to Decisions 22-01-023 and 22-02-002
|
02/25/2022
|
D.22-01-023 and D.22-02-002
|
||
02/25/2022
|
52586-52762
|
Supplemental: Annual Electric True-Up Part 2 - Electric Rate Change Effective March 1, 2022
|
03/01/2022
|
N/A
|
||
02/25/2022
|
52773-52780
|
Tariff Updates to the Base Interruptible Program, Capacity Bidding Program and SmartAC Program Pursuant to Decision 21-12-015
|
02/25/2022
|
21-12-015
|
||
02/25/2022
|
N/A
|
Joint Report on Cybersecurity Discussions with the Smart Inverter Working Group and Recommended Path Forward Directed in Ordering Paragraph 4 of Resolution E-5000
|
07/19/2022
|
N/A
|
||
02/24/2022
|
N/A
|
Southern California Edison Company, San Diego Gas and Electric Company and Pacific Gas and Electric Company's Submission of Updated Automated Demand Response Control Incentive Guidelines and Adopted Policies, Pursuant to Decision 21-12-015
|
02/24/2022
|
D.21-12-015
|
||
02/24/2022
|
N/A
|
Adjustments to Revenue Requirement and Rate Base to Comply with Internal Revenue Service Private Letter Ruling.
|
03/26/2022
|
N/A
|
||
02/22/2022
|
N/A
|
Pacific Gas and Electric Company, Center for Sustainable Energy,
Southern California Edison Company, and Southern California Gas
Company's Proposed Corrections to the 2021 Version 5 Self-Generation Incentive Program Handbook
|
02/22/2022
|
N/A
|
||
02/22/2022
|
N/A
|
Spring 2021 Solar in Disadvantaged Communities (DAC) Solicitation;
Power Purchase Agreements Between PG&E and Selected
Counterparties
|
03/24/2022
|
18-06-027, 18-10-007
|
||
02/18/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Central Towers Program: Tesla-Schulte 115 kV Project in the County of Alameda and San Joaquin
|
03/17/2022
|
N/A
|
||
02/18/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Central Towers Program: Lammers-Kasson 115 kV Project in the City of Tracy, County of San Joaquin
|
03/17/2022
|
N/A
|
||
02/18/2022
|
N/A
|
Annual Electric True-Up Part 2 - Electric Rate Change Effective March 1, 2022
|
03/01/2022
|
N/A
|
||
02/17/2022
|
N/A
|
Request for Approval to Exercise the Ruby Pipeline Contract Step Down Rights Pursuant to Decision 21-12-035, Ordering Paragraph 3
|
02/17/2022
|
21-12-035
|
||
02/17/2022
|
N/A
|
Joint Investor Owned Utility Proposed Modifications to Electric Rule 21 to Incorporate an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861
|
Superceded
|
N/A
|
||
02/17/2022
|
N/A
|
Day Ahead Hourly Real Time Pricing Business Electric Vehicle Rebate Program Proposal
|
03/19/2022
|
D.21-11-017
|
||
02/15/2022
|
N/A
|
2022 Energy Resource Recovery Account Trigger Amount
|
02/15/2022
|
02-10-062, 04-01-050, 04-12-048, 15-05-008
|
||
02/15/2022
|
N/A
|
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet April 2022 Local Resource Adequacy Procurement Obligations
|
01/23/2023
|
N/A
|
||
02/14/2022
|
N/A
|
Procurement for Summers 2022-2023 Under Decision 21-02-028, Decision 21-03-056, and Decision 21-12-015.
|
02/19/2022
|
21-02-028, 21-03-056, 21-12-015
|
||
02/11/2022
|
N/A
|
Joint Advice Letter Proposing Interconnection Pathway for Vehicle-to-Grid Alternating Current Projects and Implementation Steps for Direct Current Electric Vehicle Supply Equipment Projects, Pursuant to Decision 20-09-035, with Modifications Pursuant to Resolution E -5165
|
02/11/2022
|
D.20-09-035
|
||
02/07/2022
|
N/A
|
Energy Price Updates for February 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
02/07/2022
|
D.20-05-006
|
||
02/07/2022
|
N/A
|
Advice Letter of Pacific Gas and Electric: Summer Reliability Market Access Program 2022-2023
|
03/09/2022
|
21-12-011
|
||
02/07/2022
|
N/A
|
Net Electric and Gas Bill Impact Study for Residential Customers Who Switch from Natural Gas Water Heater to Heat Pump Water Heater in Compliance with D.21-11-002
|
12/01/2022
|
21-11-002
|
||
02/04/2022
|
N/A
|
Pacific Gas and Electric Company's Tier 2 Advice Letter for the Emergency Load Reduction Program Residential Pilot A.6 Pursuant to Decision 21-12-015 and 21-12-069
|
04/18/2022
|
D.21-12-015 and D.21-12-069
|
||
02/04/2022
|
52546-52548
|
Pacific Gas and Electric Company's Advice Letter to D.21-12-015 Agricultural Pumping Dynamic Rate Pilot
|
03/06/2022
|
D.21-12-015
|
||
02/04/2022
|
52551-52555, 37687-37684
|
Pacific Gas and Electric Company's Proposed Percentage of Income Payment Plan Pilot in Compliance with D.21-10-012
|
12/15/2022
|
D.21-10-012
|
||
02/03/2022
|
N/A
|
PG&E's Pension-Related Revenue Requirement for 2022
|
02/03/2022
|
N/A
|
||
02/02/2022
|
N/A
|
Presentation of GHG Credits on Customers' Bills
|
02/02/2022
|
N/A
|
||
02/01/2022
|
52543-52544, 37681-37682
|
Update to Sample Form 62-0401 to Reflect New Contact Center Hours of Operation
|
02/06/2022
|
N/A
|
||
02/01/2022
|
N/A
|
2022 Proposed Budget for Administrative Costs to Support the Disadvantaged Communities - Single Family Solar Homes (DAC-SASH) Program
|
03/03/2022
|
20-12-003
|
||
02/01/2022
|
N/A
|
2023 Budget Request for the Disadvantaged Community Green Tariff (DAC-GT) and Community Solar Green Tariff (CS-GT) Programs
|
Superceded
|
N/A
|
||
01/31/2022
|
N/A
|
2022 Self-Generation Incentive Program Annual Budget Update Advice Letter Pursuant to Decision 21-12-031
|
01/31/2022
|
21-12-031
|
||
01/31/2022
|
N/A
|
January 2021 Winter Storms Emergency Consumer Protections Summary
|
01/31/2022
|
19-07-015
|
||
01/31/2022
|
N/A
|
Emergency Load Reduction Program Pilot Terms and Conditions of Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company in Compliance With Decisions 21-12-015 and 21-12-069
|
01/31/2022
|
21-12-015
|
||
01/31/2022
|
N/A
|
Procurement Transaction Quarterly Compliance Submittal (Q4, 2021)
|
03/02/2022
|
D.03-12-062 and D.02-10-062
|
||
01/31/2022
|
N/A
|
Reservation of 2022 temporary generation and associated make-ready improvements for the purposes of mitigating Public Safety Power Shutoff events and system capacity shortfalls
|
10/13/2022
|
D.21-01-018, D.21-12-004
|
||
01/28/2022
|
N/A
|
Bear River Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
02/28/2022
|
D.03-12-035, D.08-11-043, D.10-08-004 D.03-12-035
|
||
01/27/2022
|
52534-52537
|
Clean-Up of Electric Rate Schedules NEM and NEM2
|
01/27/2022
|
N/A
|
||
01/27/2022
|
N/A
|
Lake Britton - Hat Creek #2 Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851
|
02/28/2022
|
N/A
|
||
01/27/2022
|
N/A
|
Statewide Marketing, Education, and Outreach (Statewide ME&O) 2022 Annual Budget Update
|
01/27/2022
|
19-01-005
|
||
01/27/2022
|
52539-52541, 37677-37679
|
Revision to PG&E's Pension Contribution Balancing Accounts
|
02/26/2022
|
N/A
|
||
01/27/2022
|
N/A
|
Supplemental: Self-Generation Incentive Program (SGIP) 2021-2025 Measurement and Evaluation Plan
|
02/11/2022
|
19-09-027
|
||
01/24/2022
|
52520-52528, 37643-37645
|
Clean-Up of Gas and Electric Forms
|
01/24/2022
|
N/A
|
||
01/24/2022
|
N/A
|
Joint EPIC Administrator Advice Letter Proposal of Eligible Administrative Budget Line Items
|
03/14/2022
|
D.21-11-028
|
||
01/21/2022
|
N/A
|
Pacific Gas and Electric Company (PG&E) 4th Quarter 2021 Solar Complaint Trends Information-Only Advice Letter
|
12/06/2021
|
N/A
|
||
01/21/2022
|
N/A
|
Request for Approval of Mid-Term Reliability Procurement Pursuant to D.21-06-035 and D.21-12-015
|
04/21/2022
|
21-06-035 and 21-12-015
|
||
01/20/2022
|
N/A
|
Request for Approval of New Investment Management Agreement for the Qualified Nuclear Decommissioning Trusts in Compliance with Ordering Paragraph 11 of D.13-01-039
|
02/19/2022
|
13-01-039
|
||
01/20/2022
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Building Code Advocacy Contract Amendments executed between Frontier Energy and PG&E; TRC Solutions and PG&E; and Cohen Ventures and PG&E
|
03/28/2022
|
N/A
|
||
01/20/2022
|
N/A
|
Joint Submittal - Establishment Of Smart Communicating Thermostat Program of Southern California Edison Company (SCE), Pacific Gas and Electric Company (PG&E), and San Diego Gas and Electric Company (SDG&E), Pursuant To Decision 21-12-015
|
04/06/2022
|
D.21-12-015
|
||
01/19/2022
|
N/A
|
Procurement for Summers 2021 & 2022 Under Decision 21-02-028 and Decision 21-03-056
|
01/24/2022
|
21-02-028 and D.21-03-056
|
||
01/19/2022
|
N/A
|
After-the-Fact Final Allocation Report Regarding Self-Generation Incentive Program (SGIP) Accumulated Funds Pursuant to Decision (D.) 21-12-031
|
01/19/2022
|
21-12-031
|
||
01/19/2022
|
N/A
|
Annual Capacity Price Updates Offered to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006
|
Withdrawn
|
D.20-06-006
|
||
01/18/2022
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
01/18/2022
|
D.21-04-015
|
||
01/18/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Brighton-Grand Island No. 1 and No. 2 115kV Power Line Reconductoring and Tower Replacement Project, County of Sacramento
|
03/02/2022
|
N/A
|
||
01/18/2022
|
N/A
|
Present Details of the Retained Resource Adequacy capacity rate for PG&E's Green Tariff Shared Renewables to include the Retained Resource Adequacy capacity as authorized in Decision 19-10-001
|
04/13/2022
|
21-12-036
|
||
01/18/2022
|
N/A
|
Request for Waiver of Penalties for Failure to Meet March 2022 Local Resource Adequacy Procurement Obligations
|
10/25/2022
|
06-06-064 and 19-06-026
|
||
01/18/2022
|
N/A
|
Demonstration Related to PG&E's Disaggregated PG&E Other Local Capacity Area Requirements for March 2022, Pending Approval of AL 6384-E (Required Demonstration for PG&E's Disaggregated PG&E Other Local Capacity Area Requirements in Compliance with Ordering Paragraph 22(a) of Decision 20-06-031)
|
10/25/2022
|
D.20-06-031
|
||
01/14/2022
|
52510-52511, 37639-37641
|
Addition of Counties Impacted by the December 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
01/14/2022
|
19-07-015.
|
||
01/14/2022
|
N/A
|
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020
|
03/02/2022
|
21-10-020
|
||
01/14/2022
|
52503-
|
Update Agricultural Electric Schedule AG-4, AG-5, AG-R, and AG-V to Align with Approval to Change Legacy AG-A Time-of-Use (TOU) Rates from Connected Load to Metered Demand in March 2025.
|
02/13/2022
|
N/A
|
||
01/13/2022
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
01/13/2022
|
D.14-05-016
|
||
01/13/2022
|
52499-52501
|
Clean-Up of Electric E-TOU-C
|
01/13/2022
|
N/A
|
||
01/12/2022
|
52496-52497
|
Request to Establish an AB 1X Balancing Account to Refund Over-Collected Bond Charges and Future Energy Crisis Litigation Resolution Monies
|
02/11/2022
|
D.21-12-001
|
||
01/11/2022
|
N/A
|
Cow Creek Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004, and Public Utilities Code Section 851
|
02/03/2022
|
N/A
|
||
01/11/2022
|
52495-52489
|
Modifications to PG&E's Interconnection Application Forms to Incorporate Customer-Owned Telemetry Options in the Application Portal pursuant to the Rule 21 Working Group 1 Decision 19-03-013
|
02/22/2022
|
D.19-03-013
|
||
01/10/2022
|
52486-52488
|
Third Supplemental: 2022 Annual Electric True-Up - Consolidated Electric Rate Changes Effective January 1, 2022
|
Effective Pending Final Disposition
|
N/A
|
||
01/07/2022
|
N/A
|
Routine Annual Advice Letter for Fixed Recovery Charges True-up Mechanism
|
03/01/2022
|
D.21-06-030
|
||
01/07/2022
|
N/A
|
Energy Price Updates for January 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006
|
01/07/2022
|
D.20-05-006
|
||
01/07/2022
|
N/A
|
Supplemental: PG&E's 2022-2023 Energy Efficiency Biennial Budget Advice Letter in Compliance with Decisions 15-10-028, 18-05-041, and 21-05-031
|
01/01/2022
|
15-10-028, 18-05-041, and 21-05-031
|
||
01/07/2022
|
N/A
|
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Sanger Unified Education Center Power-Line Relocation Project in the County of Fresno
|
03/02/2022
|
N/A
|
||
01/07/2022
|
52478-52484
|
Second Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Ordering Paragraphs 7, 49, 50 Decision 20-09-035 for Working Group 2 and 3
|
08/06/2021
|
D.20-09-035
|
||
01/06/2022
|
52475-52477
|
Supplemental: Electric Rate Change Effective December 1, 2021
|
12/01/2021
|
N/A
|
||
01/05/2022
|
N/A
|
Supplemental: Establishment of the Wildfire and Natural Disaster Resiliency Rebuild Program Balancing Account
|
12/09/2021
|
21-11-002
|
Advice Number |
---|
Date Filed |
12/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Contract resulting from its Summer Reliability Program solicitation, executed between Sunrun, Inc. and PG&E |
Effective Date |
01/25/2023 |
Decision Number |
D.21-12-011 |
Advice Number |
Date Filed |
12/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's End of the Year Advice Letter Filing for the WatterSaver Reporting |
Effective Date |
01/24/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/30/2022 |
Tariff Sheet Number |
55053-55058 |
Subject |
Request for Approval of PG&E's Plan to Develop a Clean Substation Microgrid Project and Associated Procurement Contract with Energy Vault |
Effective Date |
04/27/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/30/2022 |
Tariff Sheet Number |
55060-55065 |
Subject |
Revisions to PG&E's Business Electric Vehicle (BEV) Rate Schedule |
Effective Date |
01/29/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/29/2022 |
Tariff Sheet Number |
54891-55052 |
Subject |
2023 Annual Electric True-Up - Consolidated Electric Rate Changes Effective January 1, 2023 |
Effective Date |
01/01/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Progress on Energy Storage Procurement at the Mesa 115 kilovolt (kV) Substation in Compliance with Decision 22 02 004 |
Effective Date |
07/21/2023 |
Decision Number |
D.22-02-004 |
Advice Number |
Date Filed |
12/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Progress on Energy Storage Procurement on the Kern-Lamont 115kV System in Compliance with Decision 22-02-004 |
Effective Date |
Pending |
Decision Number |
D.22-02-004 |
Advice Number |
Date Filed |
12/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Lake Britton Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
01/18/2023 |
Decision Number |
D.08-11-043, D.03-12-035, D.10-08-004. |
Advice Number |
Date Filed |
12/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pit River Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
01/18/2023 |
Decision Number |
D.08-11-043, D.03-12-035, D.10-08-004. |
Advice Number |
Date Filed |
12/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Update to Pacific Gas and Electric Company's Bundled Procurement Plan - Electrical Capacity and Ratable Rate, Natural Gas Pipeline Capacity, Natural Gas Storage Procurement, and Greenhouse Gas Procurement Limits and Resource Adequacy Solicitation Schedule |
Effective Date |
12/22/2022 |
Decision Number |
D.07-12-052 |
Advice Number |
Date Filed |
12/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Green Tariff (GT) & Enhanced Community Renewables (ECR) 2022 Marketing Plan Marketing Implementation Advice Letter |
Effective Date |
01/20/2023 |
Decision Number |
D.15-01-051 |
Advice Number |
Date Filed |
12/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Annual Update on Capital Structure in Compliance with OP 9 of Decision 20-05-053 |
Effective Date |
12/21/2022 |
Decision Number |
D.20-05-053 |
Advice Number |
Date Filed |
12/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-only Advice Letter on Pacific Gas and Electric Company's Progress to Increase Family Electric Rate Assistance Program Enrollment per Decision (D.) 18-08-013 |
Effective Date |
12/21/2022 |
Decision Number |
D.18-08-013 |
Advice Number |
Date Filed |
12/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Updated Rate and Bill Impacts, in Compliance with OP 13 of D.22-11-040 |
Effective Date |
01/02/2023 |
Decision Number |
D.22-11-040 |
Advice Number |
Date Filed |
12/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003 |
Effective Date |
12/21/2022 |
Decision Number |
D.18-12-003 |
Advice Number |
Date Filed |
12/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter Regarding Market Offer |
Effective Date |
02/02/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Access Charge Balancing Account Adjustment |
Effective Date |
02/21/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/16/2022 |
Tariff Sheet Number |
54816-54832 |
Subject |
Clean-Up Electric Tariffs |
Effective Date |
12/16/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/15/2022 |
Tariff Sheet Number |
54837-54847 |
Subject |
Modifications to Pacific Gas & Electric Virtual Net Energy Metering (VNEM) Tariffs |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas & Electric Company's Request for Certification of Energy Storage Procurement in Other Proceedings for Assembly Bill 2514 Compliance Targets |
Effective Date |
12/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/14/2022 |
Tariff Sheet Number |
54783-54790, 38265-38272 |
Subject |
PG&E's Revisions to its Tariffs, E-OBR, and G-OBR, On-Bill Repayment (OBR), and Form 79-1157, Authorization to Add Charges to Utility Bill, Applicable Throughout its Service Territory |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/14/2022 |
Tariff Sheet Number |
54810-54811 |
Subject |
Retire Electric Rate Schedule E-31, Distribution Bypass Deferral Rate, and Electric Preliminary Statement Part CK, Distribution Bypass Deferral Rate Memorandum Account |
Effective Date |
01/13/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/14/2022 |
Tariff Sheet Number |
54794-54806 |
Subject |
Modifications to the Microgrids Memorandum Account (MGMA), Microgrids Balancing Account (MGBA), Distribution Revenue Adjustment Mechanism (DRAM) and Energy Resource Recovery Account (ERRA) in Compliance Decision (D.) 22-11-009 (Framework for Substation Microgrid Solutions to Mitigate PSPS Decision) |
Effective Date |
12/14/2022 |
Decision Number |
D.22-11-009 |
Advice Number |
Date Filed |
12/14/2022 |
Tariff Sheet Number |
54783-54790, 38265-38272 |
Subject |
PG&E's Revisions to its Tariffs, E-OBR, and G-OBR, On-Bill Repayment (OBR), and Form 79-1157, Authorization to Add Charges to Utility Bill, Applicable Throughout its Service Territory |
Effective Date |
|
Decision Number |
N/A |
Advice Number |
Date Filed |
12/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
East Bay Community Energy, Pacific Gas and Electric Company, and Bay Area Regional Energy Network Joint Cooperation Memorandum for Program Year 2023 Energy Efficiency Programs |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/12/2022 |
Tariff Sheet Number |
N/A |
Subject |
Fall River Mills Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
01/18/2023 |
Decision Number |
D.08-11-043, D.03-12-035, D.10-08-004 |
Advice Number |
Date Filed |
12/12/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q2 2022) |
Effective Date |
08/21/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
12/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
True-Up of Capacity Transfer Under the Disadvantaged Communities Green Tariff Program to Accommodate Service to the City of Los Banos |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter Seeking Approval of Quarterly Estimated Tax Payment Process for the Customer Credit Trust in Compliance with D.21-04-030 |
Effective Date |
01/08/2023 |
Decision Number |
D.21-04-030 |
Advice Number |
Date Filed |
12/08/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020 |
Effective Date |
01/07/2023 |
Decision Number |
D.21-10-020 |
Advice Number |
Date Filed |
12/07/2022 |
Tariff Sheet Number |
54779-54780 |
Subject |
Modifications to PG&E's Electric Rule 21 to Address Anti-Islanding Pursuant to the Rule 21 Working Group 4 Decision 21-06-002 |
Effective Date |
Pending |
Decision Number |
D.21-06-002 |
Advice Number |
Date Filed |
12/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 1 Advice Letter Regarding Market Offer |
Effective Date |
12/05/2022 |
Decision Number |
D.22-11-021 |
Advice Number |
Date Filed |
12/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for December 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
12/05/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
12/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d) |
Effective Date |
12/05/2022 |
Decision Number |
D.22-08-00 |
Advice Number |
Date Filed |
12/05/2022 |
Tariff Sheet Number |
54757-54773 |
Subject |
PG&E EV Submetering Implementation Plan |
Effective Date |
06/29/2023 |
Decision Number |
D.22-08-024 |
Advice Number |
Date Filed |
12/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Self-Generation Incentive Program Funded Energy Storage Installations |
Effective Date |
12/01/2022 |
Decision Number |
D.16-09-007 |
Advice Number |
Date Filed |
11/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Fall 2021 Solar in Disadvantaged Communities (DAC) Solicitation; Power Purchase Agreements Between PG&E and Selected Counterparties |
Effective Date |
12/30/2022 |
Decision Number |
D.18-06-027, D.18-10-007 |
Advice Number |
Date Filed |
11/28/2022 |
Tariff Sheet Number |
54746-54748 |
Subject |
Update Electric Preliminary Statement Part JI - Dynamic and Real-Time Pricing Memorandum Account Pursuant to D. 22-10-024 |
Effective Date |
11/29/2022 |
Decision Number |
D.22-10-024 |
Advice Number |
Date Filed |
11/28/2022 |
Tariff Sheet Number |
54751-54752 |
Subject |
Final Tariff Sheets for Implementation of the New Line-Item Discount Schedule D-MEDICAL Effective December 1, 2022, in Compliance With Decision 22-04-004 |
Effective Date |
12/01/2022 |
Decision Number |
D.22-04-004 |
Advice Number |
Date Filed |
11/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notification of the Creation of a New Affiliate: Pacific Generation LLC |
Effective Date |
Rejected |
Decision Number |
D.97-12-088, D.98-08-035 and D.06-12-029 |
Advice Number |
Date Filed |
11/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Issuance Advice Letter Submission for Wildfire Hardening Recovery Bonds |
Effective Date |
11/21/2022 |
Decision Number |
D.22-08-004 |
Advice Number |
Date Filed |
11/21/2022 |
Tariff Sheet Number |
54743-54744 |
Subject |
Customer-Facing Re-naming of Fixed Charge for Schedule E-ELEC (Residential Time-of-Use, Electric Home), Effective December 1, 2022 |
Effective Date |
12/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Livermore-Las Positas 60kV Power Line Relocation Project, City of Livermore |
Effective Date |
01/06/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/18/2022 |
Tariff Sheet Number |
54736-54734 |
Subject |
Implement Final Rates for New Pro-Electrification Rate Schedule E-ELEC (Residential Time-of-Use, Electric Home) Effective December 1, 2022 in Compliance With Decision 21-11-016 |
Effective Date |
12/01/2022 |
Decision Number |
D.21-11-016 |
Advice Number |
Date Filed |
11/17/2022 |
Tariff Sheet Number |
54731-54732 |
Subject |
Modifications to PG&E's Transmission Load Operating Agreement Form 79-847 |
Effective Date |
04/14/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Preliminary Annual Electric True-Up Submittal - Change to PG&E's Electric Rates on January 1, 2023 |
Effective Date |
01/01/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter of Pacific Gas and Electric: Summer Reliability Market Access Program 2023 |
Effective Date |
12/16/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval to Not Issue Competitive Solicitations for Distributed Energy Resource (DER) Procurement for Electric Distribution Deferral Opportunities |
Effective Date |
12/15/2022 |
Decision Number |
D.18-02-004 |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Proposed Partnership Pilot in Compliance with Decision 21-02-006 |
Effective Date |
12/15/2022 |
Decision Number |
D.21-02-006 |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
54725-54724 |
Subject |
Retire Electric Preliminary Statement Part DG, Power Charge Collection Balancing Account |
Effective Date |
12/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/15/2022 |
Tariff Sheet Number |
54729-54726, 38228-38227 |
Subject |
Clean-Up of Gas and Electric Preliminary Statements |
Effective Date |
12/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notice of Statewide California Energy-Smart Homes Mixed-Fuel Residential New Construction Program Closure Request |
Effective Date |
12/14/2022 |
Decision Number |
D.21-05-031 |
Advice Number |
Date Filed |
11/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022 |
Effective Date |
04/03/2023 |
Decision Number |
D.18-05-022 |
Advice Number |
Date Filed |
11/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance with D.13-01-021, D.13-02-017, and D.13-04-001 |
Effective Date |
04/03/2023 |
Decision Number |
D.13-01-021, D.13-02-017, D.13-04-001 |
Advice Number |
Date Filed |
11/09/2022 |
Tariff Sheet Number |
54499-54721 |
Subject |
Modifications to Electric Rule 21 on Financial Security Posting Requirements |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of VASCO-HERDLYN 60 KV POWER LINE POLE REPLACEMENT PROJECT, Alameda and Contra Costa counties and City of Livermore |
Effective Date |
07/13/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/08/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only: Executed Contracts Pursuant to the May 11, 2020 Administrative Law Judge's Ruling Modifying the Distribution Investment Deferral Framework-Filing and Process Requirements |
Effective Date |
11/08/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for November 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
11/07/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
11/04/2022 |
Tariff Sheet Number |
54491-54493 |
Subject |
Second Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172 |
Effective Date |
11/04/2022 |
Decision Number |
D.22-10-020 |
Advice Number |
Date Filed |
11/04/2022 |
Tariff Sheet Number |
54494-54496 |
Subject |
Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172 and PG&E's Request for Extension of Time to Comply with D.20-09-035 Ordering Paragraphs 2 and 11 as Discussed in Resolution E-5172 |
Effective Date |
11/04/2022 |
Decision Number |
D.22-10-020 |
Advice Number |
Date Filed |
11/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Pacific Gas and Electric Company ("PG&E") Central Procurement Entity ("CPE") Annual Compliance Report |
Effective Date |
12/06/2022 |
Decision Number |
D.20-06-002 |
Advice Number |
Date Filed |
11/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Battle Creek Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
12/09/2022 |
Decision Number |
08-11-043 |
Advice Number |
Date Filed |
10/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Customer Eligibility for PG&E's Vehicle-Grid Integration (VGI) Pilot #3: Microgrids Pilot |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement Transaction Quarterly Compliance Submittal (Q3 2022) |
Effective Date |
11/30/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
10/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental - Summer 2022 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers |
Effective Date |
10/07/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Manteca-Louise 60 kV Pole Relocation Project, City of Manteca |
Effective Date |
11/27/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental filing to AL 6655-E to address OP.10 of D. 21-12-036 |
Effective Date |
11/16/2022 |
Decision Number |
D. 21-12-036 |
Advice Number |
Date Filed |
10/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Modifications to the Self-Generation Incentive Program Handbook for PG&E's Building Permit and Final Monitoring Schematic Documents |
Effective Date |
10/28/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Sale and Conveyance of one Parcel of Improved Land in the City of San Jose in Santa Clara County - Request for Approval under Public Utilities Code Section 851 and General Order 173 |
Effective Date |
11/26/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/26/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Contract resulting from the Statewide Market Transformation Administrator solicitation and executed between Resource Innovations, Inc. and PG&E |
Effective Date |
11/23/2022 |
Decision Number |
D.19-12-021 |
Advice Number |
Date Filed |
10/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company (PG&E) 3rd Quarter 2022 Solar Complaint Trends Information-Only Advice Letter |
Effective Date |
10/21/2022 |
Decision Number |
D.18-09-044 |
Advice Number |
Date Filed |
10/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Elimination of PG&E's High Usage Surcharge Per Decision 21-03-003 |
Effective Date |
01/01/2023 |
Decision Number |
D. 21-03-003 |
Advice Number |
Date Filed |
10/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Tree Mortality Non-Bypassable Charge (TM NBC) Bundled Renewable Portfolio Standard (RPS) Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and San Diego Community Power for product from Burney Forest Products; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and East Bay Community Energy for product from Wheelabrato |
Effective Date |
10/21/2022 |
Decision Number |
D.18-12-003 |
Advice Number |
Date Filed |
10/21/2022 |
Tariff Sheet Number |
54484-54489 |
Subject |
Modifications to PG&E's Interconnection Application Forms to Incorporate Anti-Islanding Options in the Application Portal Pursuant to the Rule 21 Working Group 4 Decision 21-06-002 |
Effective Date |
12/12/2022 |
Decision Number |
D.21-06-002 |
Advice Number |
Date Filed |
10/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Washington, Hopkins and KNP Complex October 2021 Wildfires Event Emergency Consumer Protections Summary |
Effective Date |
10/21/2022 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
10/20/2022 |
Tariff Sheet Number |
54480-54482, 38169-38184 |
Subject |
Modifications to Gas Rule 15, Gas Rule 16, Form 79-1018, and Form 79-1169 to Eliminate Certain Gas Line Extension Allowances, Discounts, and Refunds Pursuant to Decision (D.) 22-09-026 |
Effective Date |
07/01/2023 |
Decision Number |
D.22-09-026 |
Advice Number |
Date Filed |
10/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tidewater Substation Lease Renewal - Request for approval Under Public Utilities Code Section 851, Pursuant to General Order 173 |
Effective Date |
11/17/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet December 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
05/23/2023 |
Decision Number |
D.06-06-064 |
Advice Number |
Date Filed |
10/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Bahia Substation Lease Renewal to Valero Refinery - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
11/13/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
10/14/2022 |
Decision Number |
D.21-04-015 |
Advice Number |
Date Filed |
10/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental Filing for 6587-E Advice Letter PG&E's DAHRTP CEV M&E Plan Includes Updated Overall DAHRTP CEV Budget |
Effective Date |
Pending |
Decision Number |
D.21-11-017 |
Advice Number |
Date Filed |
10/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Southern California Edison Company, Pacific Gas & Electric Company and San Diego Gas & Electric Company's Auto Demand Response Control Incentive Guidelines and Adopted Policies Submitted, Pursuant To Decision 18-11-029 |
Effective Date |
10/01/2022 |
Decision Number |
D.18-11-029 |
Advice Number |
Date Filed |
10/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Amendment No. 5 to Supplement No. 2 Under the Master Agreement with the Peninsula Corridor Joint Powers Board Regarding the Peninsula Corridor Electrification Project in Accordance with General Order 96-B, Section 9.2.3, and Resolution E-4811 |
Effective Date |
11/12/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/12/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Micro and Small Business Equity Program solicitation, executed between Resource Innovations and PG&E |
Effective Date |
11/11/2022 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
10/12/2022 |
Tariff Sheet Number |
54470-54478 |
Subject |
Corrections to Schedules NEM and NEM2 for Storage Devices Paired with Net Energy Metering Generating Facilities |
Effective Date |
11/11/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/12/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval of Emergency Reliability Procurement for Summer 2022 Under Decision 21-03-056 and Decision 21-12-015 |
Effective Date |
10/17/2022 |
Decision Number |
D.21-03-056 and D.21-12-015 |
Advice Number |
Date Filed |
10/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Revenue Balancing Account Adjustment, the Reliability Services Rates, and the End-Use Customer Refund Balancing Account Adjustment |
Effective Date |
12/06/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
10/10/2022 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
10/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental - Information-Only Filing Regarding Net Energy Metering (NEM) Costs |
Effective Date |
10/20/2022 |
Decision Number |
D.16-01-044 |
Advice Number |
Date Filed |
10/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Summer 2022 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers |
Effective Date |
10/07/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/07/2022 |
Tariff Sheet Number |
54456-54467 |
Subject |
Additional Modifications to the Community Microgrid Enablement Tariff (CMET) Pursuant to Resolution E-5127 |
Effective Date |
11/07/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request to End Quarterly Reporting Obligation to Submit a Progress of Residential Rate Reform (PRRR) Report in Compliance with Decision (D.) 19-09-004 |
Effective Date |
11/01/2022 |
Decision Number |
D.19-19-004 |
Advice Number |
Date Filed |
10/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Section 320 Scenic Highway Deviation - Installation of Distribution |
Effective Date |
01/12/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for October 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006 |
Effective Date |
10/05/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
10/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020 |
Effective Date |
11/04/2022 |
Decision Number |
D.21-10-020 |
Advice Number |
Date Filed |
10/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Conformed Bundled Procurement Plan - Sales Framework (Appendix S) Update |
Effective Date |
10/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q1, 2022) |
Effective Date |
06/01/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
10/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Resource Adequacy Sales Agreements Pursuant to Decision 22-05-015 |
Effective Date |
10/03/2022 |
Decision Number |
22-05-015 |
Advice Number |
Date Filed |
10/03/2022 |
Tariff Sheet Number |
54447-54450, 38161-38162 |
Subject |
Addition of Fork, Barnes, and Mountain Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
10/03/2022 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
10/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Informational Report on SmartRate Enrollments, Pursuant to D.19-07-004, OP 21 |
Effective Date |
10/03/2022 |
Decision Number |
D.19-07-004 |
Advice Number |
Date Filed |
09/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Conformed Bundled Procurement Plan Intent to Offer Carbon Free Energy Allocations |
Effective Date |
09/30/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Tidewater-Sobrante 230kV Transmission Line Tower Replacement Project, City of Martinez |
Effective Date |
10/30/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's 2023 Annual Low Carbon Fuel Standard Electric Credit and Revenue Estimate |
Effective Date |
10/30/2022 |
Decision Number |
D.14-12-083 |
Advice Number |
Date Filed |
09/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020 |
Effective Date |
10/29/2022 |
Decision Number |
D.21-10-020 |
Advice Number |
Date Filed |
09/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020 |
Effective Date |
10/05/2022 |
Decision Number |
D.21 10 020 |
Advice Number |
Date Filed |
09/28/2022 |
Tariff Sheet Number |
54444-54446 |
Subject |
Open California Distributed Generation Statistics Website Memorandum Account -2 (CDGSWMA-2) for Continued Implementation of Resolution E-5030 Authorizing Energy Division to Oversee Contracts for Work Required to Maintain the California Distributed Generation Statistics Website |
Effective Date |
09/28/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/26/2022 |
Tariff Sheet Number |
N/A |
Subject |
Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraph 9 |
Effective Date |
10/26/2022 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
09/23/2022 |
Tariff Sheet Number |
54435-54438 |
Subject |
Addition of Subaccounts to the Dynamic and Real-Time Pricing Memorandum Account (DRTPMA) Pursuant to the Settlement Agreement Adopted by D.22-08-002 |
Effective Date |
08/04/2022 |
Decision Number |
22-08-002 |
Advice Number |
Date Filed |
09/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
This submittal provides information required by Ordering Paragraph (OP) 1 of Decision (D.) 21-10-020 regarding Pacific Gas and Electric Company's (PG&E) restoration, rebuilding, and reconstruction activities related to the Mill Fire. |
Effective Date |
10/23/2022 |
Decision Number |
D.21-10-020 |
Advice Number |
Date Filed |
09/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Amendments to Mid-Term Reliability Contracts approved in Advice Letter 6477-E |
Effective Date |
12/01/2022 |
Decision Number |
D.21-06-035 |
Advice Number |
Date Filed |
09/23/2022 |
Tariff Sheet Number |
54440-54443 |
Subject |
Electric Rate Change Effective October 1, 2022 |
Effective Date |
10/01/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
09/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Quarterly Report, Pursuant to D. 22-06-028, Ordering Paragraph 6 |
Effective Date |
09/22/2022 |
Decision Number |
22-06-028 |
Advice Number |
Date Filed |
09/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Oakland J-Grant 115 kV Power Line Reconductoring and Structure Replacement Project, Cities of Oakland and San Leandro, County of Alameda |
Effective Date |
10/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/21/2022 |
Tariff Sheet Number |
54434-54431, 38127-38125 |
Subject |
Addition of Mosquito Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015 |
Effective Date |
09/21/2022 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
09/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Filing Regarding Net Energy Metering (NEM) Costs |
Effective Date |
Superceded |
Decision Number |
16-01-044 |
Advice Number |
Date Filed |
09/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Pacific Gas and Electric Company's Proposed Anti-Islanding Options Guidance Section for its Interconnection Handbooks Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 14 |
Effective Date |
10/05/2022 |
Decision Number |
D.21-06-006 |
Advice Number |
Date Filed |
09/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company ("PG&E") Central Procurement Entity ("CPE") Annual Compliance Report |
Effective Date |
12/06/2022 |
Decision Number |
D.20-06-002 |
Advice Number |
Date Filed |
09/19/2022 |
Tariff Sheet Number |
54113-54427 |
Subject |
Supplemental: Modifications to Electric Rule 21 and Net Energy Metering Tariffs for Generation Facilities Greater than One Megawatt Interconnecting on Transmission Pursuant to Decision 22-07-001 Ordering Paragraphs 1, 3 and 4 |
Effective Date |
02/28/2023 |
Decision Number |
D.22-07-001 |
Advice Number |
Date Filed |
09/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Partial Quitclaim of Easement Deeds - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
10/16/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Fawn Wildfire Emergency Consumer Protections Summary |
Effective Date |
09/19/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
09/15/2022 |
Tariff Sheet Number |
54070-54076 |
Subject |
Supplemental - Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachments For Implementation of Resolution E-5172 |
Effective Date |
09/26/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Correction to BEV Rate Performance SB 350 SRP Annual Report 2021, Submitted as Advice Letter 6552-E |
Effective Date |
09/15/2022 |
Decision Number |
19-10-055 |
Advice Number |
Date Filed |
09/15/2022 |
Tariff Sheet Number |
54078-54080, 38122-38124 |
Subject |
Addition of Mill Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015 |
Effective Date |
09/15/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
09/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Partial Supplement to Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities |
Effective Date |
12/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/07/2022 |
Tariff Sheet Number |
54063-54066 |
Subject |
Pacific Gas and Electric Company's Tariff Updates to the Base Interruptible Program |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Cache Wildfire Emergency Consumer Protections Summary |
Effective Date |
09/07/2022 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
09/07/2022 |
Tariff Sheet Number |
54067-54068 |
Subject |
Second Supplemental: Clarifications to Electric Schedule NEM2 Applicability and Special Condition requirements for transitions to the NEM Successor tariff |
Effective Date |
12/05/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for September 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
09/06/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
09/06/2022 |
Tariff Sheet Number |
54056-54060 |
Subject |
Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Electric Vehicle Submetering Memorandum Subaccount |
Effective Date |
09/06/2022 |
Decision Number |
22-08-024 |
Advice Number |
Date Filed |
09/06/2022 |
Tariff Sheet Number |
54062-54061 |
Subject |
Pacific Gas and Electric Company's Closure of the Non-Residential C-SmartAC Tariff |
Effective Date |
09/06/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/02/2022 |
Tariff Sheet Number |
N/A |
Subject |
Rate Structures for Vehicle Grid Integration Pilots |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/02/2022 |
Tariff Sheet Number |
54053-54054 |
Subject |
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to E-5220 |
Effective Date |
09/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/02/2022 |
Tariff Sheet Number |
N/A |
Subject |
Hat Creek Land Retained - Request for Approval under Decision (D.) 08-11-043, D.03-12-035, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
10/04/2022 |
Decision Number |
08-11-043, 03-12-035, 10-08-004. |
Advice Number |
Date Filed |
09/02/2022 |
Tariff Sheet Number |
N/A |
Subject |
Phased Implementation of the New Line-Item Discount Schedule D-MEDICAL Effective December 1, 2022, in Compliance With Decision 22-04-004 |
Effective Date |
12/01/2022 |
Decision Number |
D.22-04-011 |
Advice Number |
Date Filed |
09/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Southern California Edison Company, Pacific Gas & Electric Company and San Diego Gas & Electric Company's Auto Demand Response Control Incentive Guidelines and Adopted Policies Submitted, Pursuant To Decision 18-11-029 |
Effective Date |
Superceded |
Decision Number |
D.18-11-029 |
Advice Number |
Date Filed |
08/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Implement New Pro-Electrification Rate Schedule E-ELEC (Residential Time-of-Use, Electric Home) Effective December 1, 2022 in Compliance With Decision 21-11-016 |
Effective Date |
12/01/2022 |
Decision Number |
D.21-11-016 |
Advice Number |
Date Filed |
08/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Revisions to the Self-Generation Incentive Program Handbook to Clarify Eligibility of Steam Turbine and Pressure Reduction Turbine Technologies and Reinstate Capacity Limits for Generation Projects |
Effective Date |
08/31/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/30/2022 |
Tariff Sheet Number |
54006-54051 |
Subject |
Electric Rate Change Effective September 1, 2022 |
Effective Date |
09/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Clarifications to Electric Schedule NEM2 Applicability and Special Condition requirements for transitions to the NEM Successor tariff |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/24/2022 |
Tariff Sheet Number |
53991-53993 |
Subject |
Supplemental: Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Subaccount (Vehicle Grid Integration "VGI" Subaccount) per Public Utilities Code Section 740.16, Enacted by Senate Bill 676 |
Effective Date |
05/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Second Supplemental: Implementation Details for Empower EV Pilot Program |
Effective Date |
06/24/2022 |
Decision Number |
D.19-09-006 |
Advice Number |
Date Filed |
08/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Utility Evaluation Process and Criteria to Assess Microgrid Different Isolation Technologies Pursuant to Final Resolution E-5194 and Decision 21-01-018 |
Effective Date |
10/26/2022 |
Decision Number |
D.21-01-018 |
Advice Number |
Date Filed |
08/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pit River and Tunnel Reservoir Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
09/18/2022 |
Decision Number |
03-12-035, D.08-11-043, D.10-08-004 |
Advice Number |
Date Filed |
08/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Update to Pacific Gas and Electric Company Bundled Procurement Plan - Procurement Methods and Processes and Liquidity Management Strategy |
Effective Date |
02/23/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Martin-SF Airport 115kV Power Line Tower Replacement Project, City of South San Francisco |
Effective Date |
09/17/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/17/2022 |
Tariff Sheet Number |
53964-53980 |
Subject |
Modifications to Electric Rule 21 and Net Energy Metering Tariffs for Generation Facilities Greater than One Megawatt Interconnecting on Transmission Pursuant to Decision 22-07-001 Ordering Paragraphs 1, 3 and 4 |
Effective Date |
Superceded |
Decision Number |
D.22-07-001 |
Advice Number |
Date Filed |
08/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only: After-Meeting Reports for Semi-Annual Resiliency Workshops Pursuant to Decision 20-06-017 |
Effective Date |
08/17/2022 |
Decision Number |
20-06-017 |
Advice Number |
Date Filed |
08/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020 |
Effective Date |
09/16/2022 |
Decision Number |
21-10-020 |
Advice Number |
Date Filed |
08/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Submittal Community-Based Organization Arrears Case Management Pilot Proposal in Compliance with D.22-04-037 |
Effective Date |
Withdrawn |
Decision Number |
D.22-04-037 |
Advice Number |
Date Filed |
08/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Second Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q4, 2021) |
Effective Date |
03/02/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
08/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company, Center for Sustainable Energy, Southern California Edison Company, and Southern California Gas Company's Proposed Modifications to Inspections Protocol Procedures in the Self-Generation Incentive Program |
Effective Date |
09/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/15/2022 |
Tariff Sheet Number |
53914-53918 |
Subject |
Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding Effective September 1, 2022 |
Effective Date |
09/01/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
08/12/2022 |
Tariff Sheet Number |
53930-53936 |
Subject |
Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E-5172 |
Effective Date |
11/04/2022 |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
08/12/2022 |
Tariff Sheet Number |
53938-53950 |
Subject |
Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E 5172 and PG&E's Request for Extension of Time to Comply with D.20-09-035 Ordering Paragraphs 2 , 6, and 11 as Discussed in Resolution E-5172 |
Effective Date |
11/04/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/11/2022 |
Tariff Sheet Number |
53920-53927 |
Subject |
Tariff Modifications to the Portfolio Allocation Balancing Account and Energy Resource Recovery Account to Support Green Tariff Shared Renewables Program Interim Pool Resources |
Effective Date |
09/10/2022 |
Decision Number |
21-12-036 |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for August 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006 |
Effective Date |
08/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003 |
Effective Date |
08/05/2022 |
Decision Number |
18-12-003 |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplement to Advice Letter 6626-E Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003 |
Effective Date |
08/05/2022 |
Decision Number |
18-12-003 |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
53896-53897, 38077-38078 |
Subject |
Addition of Oak Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
08/05/2022 |
Decision Number |
19-07-015. |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Antelope, River, McFarland, Monument, and Caldor Wildfires Events Emergency Consumer Protections Summary |
Effective Date |
08/05/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
08/05/2022 |
Tariff Sheet Number |
53901-53906 |
Subject |
Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachments For Implementation of Resolution E-5172 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/04/2022 |
Tariff Sheet Number |
53892-53893 |
Subject |
Modification of the Transmission Load Operating Agreement (TLOA) for the Caltrain Electrification Project |
Effective Date |
Pending |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Amendments for Contracts Not Yet Operational in the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with D.20-08-043 |
Effective Date |
06/23/2022 |
Decision Number |
D.20-08-043 |
Advice Number |
Date Filed |
08/02/2022 |
Tariff Sheet Number |
53875-53888 |
Subject |
Clean-Up of Rule 21/Net Energy Metering (NEM) Tariffs and Forms |
Effective Date |
08/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/01/2022 |
Tariff Sheet Number |
53858-53859 |
Subject |
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.20-08-046 |
Effective Date |
08/01/2022 |
Decision Number |
D.20-08-046 |
Advice Number |
Date Filed |
08/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement Transaction Quarterly Compliance Submittal (Q2 2022) |
Effective Date |
08/21/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
07/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval of PG&E's Pending Extension Request to Develop a Clean Substation Microgrid Project |
Effective Date |
Withdrawn |
Decision Number |
21-01-018 |
Advice Number |
Date Filed |
07/29/2022 |
Tariff Sheet Number |
53840-53852 |
Subject |
Supplemental: Rate Implementation Plan Pursuant to Decision 22-05-015 to Implement Cost Recovery Associated with Reliability Contracts Procured to Meet the Modified Cost Allocation Mechanism Targets Established in Decision 19-11-016 and Mid-Term Reliability Targets Established in D.21-06-035. Establishment of Electric Preliminary Statement Part JN, Modified Cost Allocation Mechanism Balancing A |
Effective Date |
01/12/2023 |
Decision Number |
19-11-016, D.21-06-035 |
Advice Number |
Date Filed |
07/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas & Electric's Interim Rate Relief Wildfire Mitigation and Catastrophic Events, A.20-02-003 Reconciliation of Revenues Collected Through June 30, 2022 |
Effective Date |
07/28/2022 |
Decision Number |
D.20-10-026 |
Advice Number |
Date Filed |
07/27/2022 |
Tariff Sheet Number |
53828-53833 |
Subject |
Modifications to PG&E's Electric Rule No. 21 Tariff ("Generating Facility Interconnections") To Address Direct Current Electric Vehicle Supply Equipment Projects Certification Time Frame |
Effective Date |
07/27/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/26/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Spring 2022 Solar Choice and Regional Renewable Choice RFOs - Collectively the Spring 2022 GTSR RFOs |
Effective Date |
11/16/2022 |
Decision Number |
21-12-036 |
Advice Number |
Date Filed |
07/25/2022 |
Tariff Sheet Number |
53805-53806 |
Subject |
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program tariff Pursuant to Resolution E-5209 |
Effective Date |
07/25/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/25/2022 |
Tariff Sheet Number |
53808-53826 |
Subject |
Advice Letter Modifying Electric Rule 21 Pursuant to Resolution E-5172 |
Effective Date |
Superceded |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
07/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d) related to Decision 21-05-015 |
Effective Date |
07/22/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
07/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Vegetation Management Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 |
Effective Date |
08/22/2022 |
Decision Number |
20-12-005 |
Advice Number |
Date Filed |
07/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Dixie, Fly, and Tamarack Wildfires Emergency Consumer Protections Summary |
Effective Date |
07/22/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
07/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company (PG&E) 2nd Quarter 2022 Solar Complaint Trends Information-Only Advice Letter |
Effective Date |
07/21/2022 |
Decision Number |
D.18-09-044 |
Advice Number |
Date Filed |
07/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21 10 020 |
Effective Date |
08/19/2022 |
Decision Number |
D.21-10-020 |
Advice Number |
Date Filed |
07/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Amendments to System Reliability Contracts approved in Advice Letter 6033-E, Procurement Toward Procurement Requirements Under D.19-11-016 - Nexus Renewables and NextEra North Central Valley |
Effective Date |
10/06/2022 |
Decision Number |
19-11-016 |
Advice Number |
Date Filed |
07/20/2022 |
Tariff Sheet Number |
53744-53803 |
Subject |
Supplemental: Modifications to Electric Tariff Rule 21 to Incorporate IEEE 1547.1-2020 Test Procedures into Testing Regime for Phase 2 and 3 Requirements in Compliance with Resolutions E-5000 and E5036 |
Effective Date |
08/29/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/18/2022 |
Tariff Sheet Number |
53713-53727 |
Subject |
Rate Implementation Plan pursuant to Decision 22-05-015 Directives to Implement Cost Recovery associated with Reliability Contracts Procured to Meet the Modified Cost Allocation Mechanism Targets Established in Decision 19-11-016 and Mid-Term Reliability Targets Established in D.21-06-035. Establishment of Preliminary Statement JN, Modified Cost Allocation Mechanism Balancing Account |
Effective Date |
Superceded |
Decision Number |
19-11-016, D.21-06-035 |
Advice Number |
Date Filed |
07/15/2022 |
Tariff Sheet Number |
53688-53706, 38002-38012 |
Subject |
Addition of Alisal and Colorado Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
07/15/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
07/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
07/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Issuance Advice Letter Submission for Recovery Bonds |
Effective Date |
07/19/2022 |
Decision Number |
D.21-05-015 |
Advice Number |
Date Filed |
07/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Revision of Securitization Customer Credit to Match Fixed Recovery Charges |
Effective Date |
09/01/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
07/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Utility Advice Letter to Update to Investor Owned-Utilities' 2021 Recorded GHG Proceeds and Share of $100 Million |
Effective Date |
07/14/2022 |
Decision Number |
20-04-012 |
Advice Number |
Date Filed |
07/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Implementation Details for Empower EV Pilot Program |
Effective Date |
Superceded |
Decision Number |
19-09-006 |
Advice Number |
Date Filed |
07/12/2022 |
Tariff Sheet Number |
53682-53681 |
Subject |
Modifications to Electric Rate Schedule EV2 to Expand Eligibility to Residential Customers Using an Electric Heat Pump as Their Primary Means for Either Water Heating or Climate Control in Compliance With Decision 21-11-016 |
Effective Date |
10/24/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
07/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Routine Semi-Annual Advice Letter for Fixed Recovery Charges True-Up Mechanism |
Effective Date |
07/08/2022 |
Decision Number |
D.21-05-015 |
Advice Number |
Date Filed |
07/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Routine Semi-Annual Advice Letter for Fixed Recovery Charges True-Up Mechanism |
Effective Date |
07/08/2022 |
Decision Number |
21-06-03 |
Advice Number |
Date Filed |
07/11/2022 |
Tariff Sheet Number |
53678-53679 |
Subject |
Modifications to PG&E's Form 79-1174-02 ("Rule 21 Generator Interconnection Application") Attachments to Incorporate an Exception Option to the Latest Smart Inverter Requirements for Interconnections Participating in the Emergency Load Reduction Program |
Effective Date |
07/20/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/08/2022 |
Tariff Sheet Number |
N/A |
Subject |
Vegetation Management Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 |
Effective Date |
Withdrawn |
Decision Number |
20-12-005 |
Advice Number |
Date Filed |
07/08/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 1 Advice Letter re Executive Compensation |
Effective Date |
07/08/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Second Supplemental: Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022 |
Effective Date |
08/06/2022 |
Decision Number |
D.18-05-022 |
Advice Number |
Date Filed |
07/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Sobrante-Moraga 115kV Power Line Project, City of Orinda |
Effective Date |
08/06/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Ignacio- Alto 60 kV Power Line Replacement Project in the City of Larkspur |
Effective Date |
08/06/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/07/2022 |
Tariff Sheet Number |
53675-53676, 37995-37992 |
Subject |
Implement Tariff Changes in Compliance with Decision (D.) 22-06-033 |
Effective Date |
07/07/2022 |
Decision Number |
22-06-033 |
Advice Number |
Date Filed |
07/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
07/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for July 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006 |
Effective Date |
07/05/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
07/01/2022 |
Tariff Sheet Number |
53600-53673 |
Subject |
Modifications to Electric Tariff Rule 21 to Incorporate IEEE 1547.1-2020 Test Procedures into Testing Regime for Phase 2 and 3 Requirements in Compliance with Resolutions E-5000 and E 5036 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Justification for PG&E's V2X Pilot 2 (Commercial Fleets Pilot) |
Effective Date |
08/11/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration of Pathways to Scale Implementation of PG&E's Vehicle-Grid Integration (VGI) Pilot #3: Microgrids Pilot |
Effective Date |
07/31/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company's Effective Load Carrying Capability Study Submission |
Effective Date |
07/31/2022 |
Decision Number |
D.19-09-043 |
Advice Number |
Date Filed |
06/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Update to Back of Bill Sample Form to Reflect New Fixed Recovery Charge and Customer Credit Definitions in Compliance with OP 41 of D.21-05-015 |
Effective Date |
06/01/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
06/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Northern Orchard PV Interconnection Project and Bitterwater Switching Station in Kern County |
Effective Date |
07/30/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Annual Advanced Energy Rebuild Advice Letter in Compliance with Commission Disposition |
Effective Date |
06/30/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/30/2022 |
Tariff Sheet Number |
N/A |
Subject |
Measurement and Evaluation Study Proposal and Budget for PG&E's E-ELEC Rate, Pursuant to D.21-11-016 |
Effective Date |
04/06/2023 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
06/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Second Supplemental: PG&E's Pension-Related Revenue Requirement for 2022 |
Effective Date |
02/03/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/28/2022 |
Tariff Sheet Number |
53593-53599 |
Subject |
Modification of Transportation Electrification Balancing Account (TEBA) to Add a New Subaccount (Vehicle Grid Integration "VGI" Subaccount) per Public Utilities Code Section 740.16, Enacted by Senate Bill 676 |
Effective Date |
05/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Wheeler Ridge Pole Replacement Project Order # 74043005 |
Effective Date |
07/27/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submittal of New Qualifying Facilities Standard Offer Contract in Conformance to Decision 22-06-003 |
Effective Date |
06/27/2022 |
Decision Number |
22-06-003 |
Advice Number |
Date Filed |
06/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Recovery of Pacific Gas and Electric's Costs as the Contracting and Fiscal Agent for the Statewide Market Transformation Program |
Effective Date |
06/24/2022 |
Decision Number |
D.19-12-021 |
Advice Number |
Date Filed |
06/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q4, 2021) |
Effective Date |
03/02/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
06/22/2022 |
Tariff Sheet Number |
53581-53585 |
Subject |
Revision to Electric Preliminary Statement Part GZ for Recovery of Costs Associated with the Partnership Pilot and Standard-Offer-Contract Pilot Pursuant to Decision 21-02-006 |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
21-02-006 |
Advice Number |
Date Filed |
06/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
January 2021 Wind Events Emergency Consumer Protections Summary |
Effective Date |
06/22/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
06/22/2022 |
Tariff Sheet Number |
53586-53589 |
Subject |
Clean-Up of Electric Forms 79-1220 and 79-1220-02 |
Effective Date |
06/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/22/2022 |
Tariff Sheet Number |
53590-53591 |
Subject |
Remote Grids as Sole Standard Service Offering |
Effective Date |
01/12/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
California Public Utilities Code Section 8386.3(d) Vegetation Management Revenue Requirements |
Effective Date |
06/23/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Advice Letter Regarding Air Pollution Control Information on Tree Mortality Contracts in Compliance with Decision (D.) 18-12-003 |
Effective Date |
08/10/2022 |
Decision Number |
18-12-003 |
Advice Number |
Date Filed |
06/17/2022 |
Tariff Sheet Number |
53578-53579, 37953-37954 |
Subject |
Supplemental: Establishment of the Dixie Fire Mobilehome Park Rebuild Agreement (Form 79-1222) for Mobilehome Park Owners/Operators affected by the Dixie Fire |
Effective Date |
06/10/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Implementing the 2020 Energy Resource Recovery Account (ERRA) Decision 22-04-041 |
Effective Date |
06/17/2022 |
Decision Number |
22-04-041 |
Advice Number |
Date Filed |
06/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Affiliate Transaction Rules Compliance Plan |
Effective Date |
06/17/2022 |
Decision Number |
97-12-088 and 06-12-029 |
Advice Number |
Date Filed |
06/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Emergency Reliability Resource Adequacy Procurement for 2022 Demand Response Pursuant to Decision 21-12-015 |
Effective Date |
06/16/2022 |
Decision Number |
21-12-015 |
Advice Number |
Date Filed |
06/14/2022 |
Tariff Sheet Number |
53570-53577, 37947-37951 |
Subject |
Modification to Electric Preliminary Statement Part GQ and Gas Preliminary Statement Part DJ |
Effective Date |
06/14/2022 |
Decision Number |
21-08-006 |
Advice Number |
Date Filed |
06/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Rider and Amendment to Pacific Gas and Electric's Bioenergy Market Adjusting Tariff Power Purchase Agreement to be executed with Scotts Valley Energy Company, LLC |
Effective Date |
04/27/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter Regarding Initial Shareholder Contribution Under Decision 21-04-030 |
Effective Date |
07/09/2022 |
Decision Number |
21-04-030 |
Advice Number |
Date Filed |
06/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for June 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006 |
Effective Date |
06/06/2022 |
Decision Number |
20-05-006 |
Advice Number |
Date Filed |
06/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Proposed Anti-Islanding Options Guidance Section for its Interconnection Handbooks Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 14 |
Effective Date |
Superceded |
Decision Number |
21-06-006 |
Advice Number |
Date Filed |
06/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Consensus Proposal Regarding Template Aggregator Agreement Pursuant to Decision 21-06-002 |
Effective Date |
07/05/2022 |
Decision Number |
21-06-006 |
Advice Number |
Date Filed |
06/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Operational Flexibility Pilot Proposal Pursuant to R. 17-07-007 Rule 21 Working Group 4 Decision 21-06-006 Ordering Paragraph 18 |
Effective Date |
Pending |
Decision Number |
D.21-06-006 |
Advice Number |
Date Filed |
06/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Self-Generation Incentive Program Funded Energy Storage Installations |
Effective Date |
06/01/2022 |
Decision Number |
16-09-007 |
Advice Number |
Date Filed |
05/31/2022 |
Tariff Sheet Number |
53354-53558 |
Subject |
Supplemental: Electric Rate Change Effective June 1, 2022 |
Effective Date |
06/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/31/2022 |
Tariff Sheet Number |
53284-53283, 37937-37936 |
Subject |
Update to Back of Bill Sample Form to Reflect New Fixed Recovery Charge and Customer Credit Definitions in Compliance with OP 41 of D.21-05-015 |
Effective Date |
06/01/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
05/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's 2023 Demand Response Auction Mechanism Purchase Agreements |
Effective Date |
06/30/2022 |
Decision Number |
19-12-040 |
Advice Number |
Date Filed |
05/31/2022 |
Tariff Sheet Number |
53287-53293 |
Subject |
Modifications to PG&E's Form 79-1174-02 ("Rule 21 Generator Interconnection Application") Attachments to Incorporate an Exception Option to the Latest Smart Inverter Requirements for Interconnections Participating in the Emergency Load Reduction Program |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Utility Advice Letter in Compliance with Ordering Paragraph 8 of Resolution E-5167 and Ordering Paragraph 8 of Resolution E-5168 |
Effective Date |
12/15/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/26/2022 |
Tariff Sheet Number |
N/A |
Subject |
Implementation Details for Empower EV Pilot Program |
Effective Date |
Superceded |
Decision Number |
19-09-006 |
Advice Number |
Date Filed |
05/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement for Summer 2022 Under Decision 21-03-056 and Decision 21-12-015 |
Effective Date |
05/29/2022 |
Decision Number |
D.21-03-056 and D.21-12-015 |
Advice Number |
Date Filed |
05/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Amendments for Contracts Not Yet Operational in the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with D.20-08-043 |
Effective Date |
06/23/2022 |
Decision Number |
D.20-08-043 |
Advice Number |
Date Filed |
05/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Giffen Tap 70kV Line in west Fresno County |
Effective Date |
06/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Market Offer Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources |
Effective Date |
10/19/2022 |
Decision Number |
D.22-01-004 |
Advice Number |
Date Filed |
05/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Electric Rate Change Effective June 1, 2022 |
Effective Date |
06/01/2022 |
Decision Number |
21-05-015, 21-04-030, 21-11-016. |
Advice Number |
Date Filed |
05/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Ravenswood-Ames 115kV Reconductor and Tower Replacement Project in the City of Mountain View |
Effective Date |
06/18/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Trinity-Cottonwood 115 kV Power Line Reconductoring and Pole Replacement Project in the Cities of Redding and Anderson, County of Shasta |
Effective Date |
06/18/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Jameson-Vallejo 115kV Reconductor and Structure Replacement Project in the Cities of Fairfield and Vallejo, Counties of Solano and Napa |
Effective Date |
06/17/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/18/2022 |
Tariff Sheet Number |
53120-53127 |
Subject |
Revisions to Electric Schedule EDR - Economic Development Rate and Sample Form 79-1222, Agreement for Economic Development Rate on Electric Service in Compliance with Decision 21-11-016 |
Effective Date |
06/17/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
05/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022 |
Effective Date |
Superceded |
Decision Number |
D.18-05-022 |
Advice Number |
Date Filed |
05/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet July 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
05/03/2023 |
Decision Number |
D.19-06-026 |
Advice Number |
Date Filed |
05/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only Advice Letter to Provide UCC Financing Statement in Compliance with Sections 850.3(b) and 850.4(d) related to Decision 21-05-015 |
Effective Date |
05/16/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
05/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notification of Energy Resource Recovery Account (ERRA) Reaching the Trigger Amount in Compliance with Decision 02-10-062, Decision 08-08-011, and Decision 22-01-023 |
Effective Date |
06/15/2022 |
Decision Number |
02-10-062, 08-08-011, 22-01-023 |
Advice Number |
Date Filed |
05/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E Compliance with Ordering Paragraphs 3, 4, and 5 of Decision 21-09-026 |
Effective Date |
06/10/2022 |
Decision Number |
D.21-09-026 |
Advice Number |
Date Filed |
05/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Capacity Price Updates Offered to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
05/13/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
05/12/2022 |
Tariff Sheet Number |
53112-53116 |
Subject |
Modifications to the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from the Bioenergy Market Adjusting Tariff ("BioMAT") Program to Comply with CPUC Decision 20-08-046 |
Effective Date |
06/11/2022 |
Decision Number |
D.20-08-046 |
Advice Number |
Date Filed |
05/11/2022 |
Tariff Sheet Number |
53109-53110, 37898-37899 |
Subject |
Establishment of the Dixie Fire Mobilehome Park Rebuild Agreement (Form 79-1222) for Mobilehome Park Owners/Operators affected by the Dixie Fire |
Effective Date |
06/10/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
JOINT UTILITIES' REQUEST FOR COMMISSION APPROVAL TO USE A PORTION OF THE INTER-AGENCY WORKING GROUP'S TRANSPORTATION ELECTRIFICATION FORECAST COMPONENT IN EACH UTILITY'S 2023-2024 GNA/DDORS |
Effective Date |
Withdrawn |
Decision Number |
18-02-004 |
Advice Number |
Date Filed |
05/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance with D.13-01-021, D.13-02-017, and D.13-04-001 |
Effective Date |
06/09/2022 |
Decision Number |
13-01-021, 13-02-017, and 13-04-001 |
Advice Number |
Date Filed |
05/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Lake Spaulding - Rucker Land Retained - Request for Approval under Decision (D.) 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
06/10/2022 |
Decision Number |
03-12-035, D.08-11-043, D.10-08-004 |
Advice Number |
Date Filed |
05/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submittal of Community Choice Aggregator (CCA) Financial Security Requirements in Compliance With D.18-05-022 |
Effective Date |
Superceded |
Decision Number |
D.18-05-022 |
Advice Number |
Date Filed |
05/10/2022 |
Tariff Sheet Number |
N/A |
Subject |
Bear River Land Donation - Request for Approval under Decision (D.) 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
06/10/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Diablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter |
Effective Date |
05/09/2022 |
Decision Number |
88-12-083 |
Advice Number |
Date Filed |
05/09/2022 |
Tariff Sheet Number |
53104-53107 |
Subject |
Second Supplemental: Proposed Amendments to PG&E LS-1 and TC-1 Rate Schedules and implementation of proposed changes pursuant to Section 9.2.3 of General Order 96-B. |
Effective Date |
Rejected |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Battle Creek Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
06/10/2022 |
Decision Number |
D.03-12-035, D.08-11-043, D.10-08-004 |
Advice Number |
Date Filed |
05/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Net Electric and Gas Bill Impact Study for Residential Customers Who Switch from Natural Gas Water Heater to Heat Pump Water Heater in Compliance with D.21-11-002 |
Effective Date |
12/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/06/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's DAHRTP CEV M&E Plan |
Effective Date |
Superceded |
Decision Number |
21-11-017 |
Advice Number |
Date Filed |
05/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for May 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
05/05/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
05/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notice to Suspend Competitive Solicitations for Distributed Energy Resource (DER) Procurement for Electric Distribution Deferral Opportunities at Vierra Substation |
Effective Date |
06/05/2022 |
Decision Number |
18-02-004 |
Advice Number |
Date Filed |
05/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Issuance Advice Letter Submission for Recovery Bonds |
Effective Date |
05/09/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
05/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the North Central Valley Energy Center 115 kV Generation Power Line in the County of San Joaquin |
Effective Date |
06/03/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Notification of the Creation of a New Affiliate: PG&E Wildfire Recovery Funding LLC |
Effective Date |
05/04/2022 |
Decision Number |
97-12-088, D.98-08-035 and D.06-12-029 |
Advice Number |
Date Filed |
05/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Customer Credit Advice Letter to Match Fixed Recovery Charges |
Effective Date |
06/01/2022 |
Decision Number |
21-05-015 |
Advice Number |
Date Filed |
05/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: BEV Rate Performance SB 350 SRP Annual Report 2021 |
Effective Date |
04/01/2022 |
Decision Number |
19-10-055 |
Advice Number |
Date Filed |
05/02/2022 |
Tariff Sheet Number |
53088-53084, 37888-37887 |
Subject |
Revised Household Income Requirements for California Alternate Rates for Energy (CARE) and Family Electric Rate Assistance (FERA) Programs and Modification of Applicable Forms |
Effective Date |
06/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/02/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement Transaction Quarterly Compliance Submittal (Q1 2022) |
Effective Date |
06/01/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
04/29/2022 |
Tariff Sheet Number |
53001-53063 |
Subject |
Modifications to PG&E's Electric Rule 21 to Incorporate Approved Language Regarding an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861 |
Effective Date |
05/29/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Dedication for Street Purposes of One Parcel of Unimproved Land in the City of Bakersfield in Kern County - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
05/23/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/29/2022 |
Tariff Sheet Number |
52984-52988, 37864-37866 |
Subject |
Clean-Up of Gas and Electric Tariffs |
Effective Date |
04/29/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Lake Spaulding Land Donation - Request for Approval under Decision 03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
05/18/2022 |
Decision Number |
03-12-035, D.08-11-043, D.10-08-004 |
Advice Number |
Date Filed |
04/25/2022 |
Tariff Sheet Number |
52941-52942 |
Subject |
Supplemental: Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.21-12-032 |
Effective Date |
08/25/2022 |
Decision Number |
D.21-12-032 |
Advice Number |
Date Filed |
04/22/2022 |
Tariff Sheet Number |
52912-52937 |
Subject |
Revising Departing Load Tariffs and Electric Preliminary Statement Part JG Pursuant to Decision 21-06-030 |
Effective Date |
05/22/2022 |
Decision Number |
21-06-030 |
Advice Number |
Date Filed |
04/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Clawiter Road Industrial Project in the City of Hayward, County of Alameda |
Effective Date |
05/19/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company (PG&E) 1st Quarter 2022 Solar Complaint Trends Information-Only Advice Letter |
Effective Date |
04/21/2022 |
Decision Number |
18-09-044 |
Advice Number |
Date Filed |
04/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Advocacy Contract Change Order executed between Cohen Ventures, Inc. and PG&E |
Effective Date |
05/19/2022 |
Decision Number |
18-01-004 |
Advice Number |
Date Filed |
04/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Illustrative Electric Rate Changes Pursuant to Decision 21-11-016 in PG&E's 2020 General Rate Case Phase 2 Proceeding |
Effective Date |
06/01/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
04/18/2022 |
Tariff Sheet Number |
52894-52895 |
Subject |
Supplemental: Proposed Amendments to PG&E LS-1 and TC-1 Rate Schedules and implementation of proposed changes pursuant to Section 9.2.3 of General Order 96-B. |
Effective Date |
Rejected |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet June 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
05/03/2022 |
Decision Number |
06-06-064 and 07-06-029 |
Advice Number |
Date Filed |
04/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric's 2021 Unspent and Uncommitted Energy Efficiency Funds Applicable to AB 841 Schools Energy Efficiency Stimulus Program |
Effective Date |
05/15/2022 |
Decision Number |
21-01-004 |
Advice Number |
Date Filed |
04/15/2022 |
Tariff Sheet Number |
52883-52892 |
Subject |
Revisions to Fees for Services to Community Choice Aggregation and Direct Access Electric Service Providers Pursuant to Decision 21-11-016 |
Effective Date |
05/15/2022 |
Decision Number |
21-11-016 |
Advice Number |
Date Filed |
04/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
04/15/2022 |
Decision Number |
21-04-015 |
Advice Number |
Date Filed |
04/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020 |
Effective Date |
04/01/2022 |
Decision Number |
21-10-020 |
Advice Number |
Date Filed |
04/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Modification of Pacific Gas and Electric Company Easement to Accommodate Property Development - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
05/09/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Procurement Transaction Quarterly Compliance Submittal (Q3, 2021) |
Effective Date |
12/01/2021 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
04/12/2022 |
Tariff Sheet Number |
52873-52878 |
Subject |
Implementing revised Electric Scheduled E-RSMART in compliance with Decision (D.)19-07-004 and D.21-03-056 |
Effective Date |
05/01/2022 |
Decision Number |
19-07-004 and D.21-03-056 |
Advice Number |
Date Filed |
04/12/2022 |
Tariff Sheet Number |
52880-52881 |
Subject |
Supplemental: Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachment H to Support the Vehicle-to-Grid Pathway Pursuant to the Rule 21 Working Group 2 and 3 Decision 20-09-035, with Modifications Pursuant to Resolution E-5165 |
Effective Date |
05/16/2022 |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
04/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only: After-Meeting Reports for Semi-Annual Resiliency Workshops Pursuant to Decision 20-06-017 |
Effective Date |
06/02/2022 |
Decision Number |
20-06-017 |
Advice Number |
Date Filed |
04/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Voluntary Allocation Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources |
Effective Date |
06/23/2022 |
Decision Number |
D.22-01-004 |
Advice Number |
Date Filed |
04/08/2022 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
04/08/2022 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
04/08/2022 |
Tariff Sheet Number |
52870-52871 |
Subject |
Supplemental: Deviation for the United States Coast Guard TRACEN Petaluma from Certain Requirements in Pacific Gas and Electric Company's Electric Rule 21 Filed Form 79-1069-02 Generating Facility Interconnection Agreement (Multiple Tariff NEM2MT) |
Effective Date |
08/25/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Pacific Gas and Electric Company's Advice Letter to D.21-12-015 Agricultural Pumping Dynamic Rate Pilot |
Effective Date |
03/06/2022 |
Decision Number |
21-12-015 |
Advice Number |
Date Filed |
04/07/2022 |
Tariff Sheet Number |
52865-52867, 37815-37817 |
Subject |
Addition of Counties Impacted by the October 2021 Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
04/07/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
04/06/2022 |
Tariff Sheet Number |
52853-52855 |
Subject |
Deviation for the United States Coast Guard TRACEN Petaluma from Certain Requirements in Pacific Gas and Electric Company's Electric Rule 21 Filed Form 79-1069-02 Generating Facility Interconnection Agreement (Multiple Tariff NEM2MT) |
Effective Date |
08/25/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for April 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
04/05/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
04/05/2022 |
Tariff Sheet Number |
52851-52850 |
Subject |
Creation of New Electric Sample Form 79-1221 - Agreement To Perform Electric Rule 29 Tariff Schedule Related Work |
Effective Date |
04/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Advice Letter for the Disbursement of Funds from the Humboldt Bay Power Plant Unit 3 Nuclear Decommissioning Trusts |
Effective Date |
05/04/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter Seeking Approval of Investment Management Agreements for the Customer Credit Trust |
Effective Date |
05/19/2022 |
Decision Number |
21-04-030 |
Advice Number |
Date Filed |
04/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Revised Proposal for Self-Generation Incentive Program (SGIP) Residential Price Cap in Accordance with Decision 19-09-027, Ordering Paragraphs 7(g) and 8(a). |
Effective Date |
05/04/2022 |
Decision Number |
19-09-027 |
Advice Number |
Date Filed |
04/04/2022 |
Tariff Sheet Number |
52861- |
Subject |
Supplemental: Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding |
Effective Date |
04/18/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Market Offer Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources |
Effective Date |
10/19/2022 |
Decision Number |
D.22-01-004 |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Utility Tier 3 Advice Letter to Request an Adjustment to the Approved Program Metrics Used to Determine Per Se Reasonableness Pursuant to Decision 18-05-040 Ordering Paragraph 2 |
Effective Date |
Pending |
Decision Number |
18-05-040 |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter regarding an Encroachment Agreement with Peralta Community College District of Alameda County for construction of a multipurpose Learning Resource Center - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
04/30/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Update regarding Pacific Gas and Electric Company's Climate Vulnerability Assessment |
Effective Date |
04/01/2022 |
Decision Number |
D.20-08-046 |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Report for Relocation Work Performed for the California High-Speed Rail Authority (CHSRA), in Compliance with Resolution G-3498 |
Effective Date |
05/09/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: 2023 Budget Request for the Disadvantaged Community Green Tariff (DAC-GT) and Community Solar Green Tariff (CS-GT) Programs |
Effective Date |
05/11/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
52844-52849 |
Subject |
Modifications to Electric Rule 21 Pursuant to Emergency Load Reduction Program Decision 21-02-015 |
Effective Date |
05/01/2022 |
Decision Number |
D.21-02-015 |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
Progress on Energy Storage Procurement at the Mesa Substation in Compliance with Decision 20-05-006 |
Effective Date |
06/03/2022 |
Decision Number |
20-05-006 |
Advice Number |
Date Filed |
04/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
BEV Rate Performance SB 350 SRP Annual Report 2021 |
Effective Date |
04/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Winter 2021 Bundled RPS Energy Sale Solicitation; Power Purchase and Sale Agreement Between Pacific Gas and Electric Company and Multiple Buyers |
Effective Date |
03/31/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Update to Pacific Gas and Electric Company's Bundled Procurement Plan -Natural Gas Procurement Limits (Appendix C) and Risk Management Policy and TeVAR Methodology (Appendix N) |
Effective Date |
03/31/2022 |
Decision Number |
07-12-052 |
Advice Number |
Date Filed |
03/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Crag View-Cascade 115kV Power Line Reconductoring and Pole Replacement Project, County of Shasta |
Effective Date |
05/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/30/2022 |
Tariff Sheet Number |
52841-52842 |
Subject |
Modifications to PG&E's Interconnection Application Form 79-1174-02 Attachment H to Support the Vehicle-to-Grid Pathway Pursuant to the Rule 21 Working Group 2 and 3 Decision 20-09-035, with Modifications Pursuant to Resolution E-5165 |
Effective Date |
Superceded |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
03/29/2022 |
Tariff Sheet Number |
N/A |
Subject |
Conveyance of Antioch Dunes Property to USFWS - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
05/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/25/2022 |
Tariff Sheet Number |
N/A |
Subject |
Updates to Pacific Gas and Electric Company's Remote Grid Initiative Tariff Deviation Customers |
Effective Date |
03/25/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/25/2022 |
Tariff Sheet Number |
N/A |
Subject |
Implementation of Decision 21-10-019 on PG&E's Pole Attachment Database System |
Effective Date |
08/29/2022 |
Decision Number |
21-10-019 |
Advice Number |
Date Filed |
03/25/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Proposal to Implement Specific Technical Requirements for Telemetering of Distribution-Connected Systems 1 Megawatt (MW) or Greater, and Less Than 10 MW, Pursuant to Resolution E-5038 |
Effective Date |
10/04/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/23/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental - Joint Investor Owned Utility Proposed Modifications to Electric Rule 21 to Incorporate an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861 |
Effective Date |
04/14/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/22/2022 |
Tariff Sheet Number |
52833-52836 |
Subject |
Supplemental: Updates to Electric Rule 29, as per Ordering Paragraph 4 of Resolution E-5167 |
Effective Date |
01/05/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Submittal - Frequency Deviations Report for the Period February 23, 2021 through February 22, 2022 Pursuant to Resolution E-4898 Ordering Paragraph 4 and PG&E Advice Letter 5336-E-A |
Effective Date |
03/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information-Only Voltage Complaints Reports for the Period February 22, 2021 to February 21, 2022 Pursuant to Resolution E-4898 Ordering Paragraph 7 |
Effective Date |
03/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/21/2022 |
Tariff Sheet Number |
52811-52831 |
Subject |
Requested modifications to PG&E's Electric Schedule NEM2 and Interconnection Form 79-1193-02 to extend use of a Power Control System (PCS) to Small NEM Paired Storage to ensure NEM Integrity, and other modifications to improve clarity |
Effective Date |
12/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Information Only Volt-Watt Quarterly Report for the Period November. 19, 2021 thru Feb. 17, 2022 Pursuant to Resolution E-5016 |
Effective Date |
03/18/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Revise Option R Eligibility Requirements and Implement a Participation Cap and Reservation System Pursuant to D.21-11-016 in PG&E's 2020 GRC Phase 2 Proceeding |
Effective Date |
04/18/2022 |
Decision Number |
D.21-11-016 |
Advice Number |
Date Filed |
03/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet May 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
02/17/2023 |
Decision Number |
06-06-064 and 07-06-029 |
Advice Number |
Date Filed |
03/16/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Proxima Solar Interconnection & Fink Switching Station Project in the County of Stanislaus |
Effective Date |
04/14/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/15/2022 |
Tariff Sheet Number |
52798-52808 |
Subject |
Modifications to PG&E's Renewable Market Adjusting Tariff ("ReMAT") Program Pursuant to D.21-12-032 |
Effective Date |
08/25/2022 |
Decision Number |
D.21-12-032 |
Advice Number |
Date Filed |
03/14/2022 |
Tariff Sheet Number |
52783-52790 |
Subject |
Modifying Electric Preliminary Statement Part HM and Electric Preliminary Statement Part HS Pursuant to Decision 22-02-002 |
Effective Date |
03/14/2022 |
Decision Number |
22-02-002 |
Advice Number |
Date Filed |
03/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request to Recover 2021 Liability Insurance Costs in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005 |
Effective Date |
05/15/2022 |
Decision Number |
20-12-005 |
Advice Number |
Date Filed |
03/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Green Tariff Shared Renewables Conforming Rate Calculations Pursuant to D.21-12-036, as Ordered in Decision 22-02-002 |
Effective Date |
06/13/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplement to Advice 4601-E et al., Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Online Data Management and Visualization Dashboard Plan |
Effective Date |
04/10/2022 |
Decision Number |
21-06-015 |
Advice Number |
Date Filed |
03/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pit River Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
04/07/2022 |
Decision Number |
D.03-12-035 D.08-11-043, D.10-08-004 |
Advice Number |
Date Filed |
03/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Los Banos-Padre Flat Switching Station 230 kV Reconductoring Project in Merced County. |
Effective Date |
04/10/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Proposed Updates to the Self-Generation Incentive Program (SGIP) Handbook California Manufacturer Adder Methodology in Compliance with Ordering Paragraph 2 of Decision (D.)Supplemental: Proposed Updates to the Self-Generation Incentive Program (SGIP) Handbook California Manufacturer Adder Methodology in Compliance with Ordering Paragraph 2 of Decision (D.)19-02-006 |
Effective Date |
04/10/2022 |
Decision Number |
D.19-02-006 |
Advice Number |
Date Filed |
03/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Proposed New Lease to Marina View Heights Association; Bass Lake, County of Madera - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
04/08/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/09/2022 |
Tariff Sheet Number |
N/A |
Subject |
Second Supplemental: Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Ignacio-Alto-Sausalito #1 and #2 60 kV Power Lines, SCADA Switch Program, in the City of Mill Valley, County of Marin |
Effective Date |
06/23/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for March 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
03/07/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
03/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company's Integrated Demand-Side Management Program Guidance, Pursuant to Decision 12-12-015 |
Effective Date |
04/06/2022 |
Decision Number |
21-12-015 |
Advice Number |
Date Filed |
03/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: PG&E's Pension-Related Revenue Requirement for 2022 |
Effective Date |
02/03/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
2021 True-Up for the Solar on Multifamily Affordable Housing (SOMAH) Program Funding |
Effective Date |
03/01/2022 |
Decision Number |
20-04-012 |
Advice Number |
Date Filed |
02/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Green Tariff Shared Renewables Updated 20-Year Forecast |
Effective Date |
02/28/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter of Pacific Gas and Electric Company Requesting Approval of Voluntary Allocation Contract for Power Charge Indifference Adjustment Eligible Renewables Portfolio Standard Resources |
Effective Date |
06/23/2022 |
Decision Number |
D.22-01-004 |
Advice Number |
Date Filed |
02/25/2022 |
Tariff Sheet Number |
52557-52558 |
Subject |
Modifying Electric Preliminary Statement Part CP and Electric Preliminary Statement Part HS Pursuant to Decisions 22-01-023 and 22-02-002 |
Effective Date |
02/25/2022 |
Decision Number |
D.22-01-023 and D.22-02-002 |
Advice Number |
Date Filed |
02/25/2022 |
Tariff Sheet Number |
52586-52762 |
Subject |
Supplemental: Annual Electric True-Up Part 2 - Electric Rate Change Effective March 1, 2022 |
Effective Date |
03/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/25/2022 |
Tariff Sheet Number |
52773-52780 |
Subject |
Tariff Updates to the Base Interruptible Program, Capacity Bidding Program and SmartAC Program Pursuant to Decision 21-12-015 |
Effective Date |
02/25/2022 |
Decision Number |
21-12-015 |
Advice Number |
Date Filed |
02/25/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Report on Cybersecurity Discussions with the Smart Inverter Working Group and Recommended Path Forward Directed in Ordering Paragraph 4 of Resolution E-5000 |
Effective Date |
07/19/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Southern California Edison Company, San Diego Gas and Electric Company and Pacific Gas and Electric Company's Submission of Updated Automated Demand Response Control Incentive Guidelines and Adopted Policies, Pursuant to Decision 21-12-015 |
Effective Date |
02/24/2022 |
Decision Number |
D.21-12-015 |
Advice Number |
Date Filed |
02/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Adjustments to Revenue Requirement and Rate Base to Comply with Internal Revenue Service Private Letter Ruling. |
Effective Date |
03/26/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company, Center for Sustainable Energy, Southern California Edison Company, and Southern California Gas Company's Proposed Corrections to the 2021 Version 5 Self-Generation Incentive Program Handbook |
Effective Date |
02/22/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/22/2022 |
Tariff Sheet Number |
N/A |
Subject |
Spring 2021 Solar in Disadvantaged Communities (DAC) Solicitation; Power Purchase Agreements Between PG&E and Selected Counterparties |
Effective Date |
03/24/2022 |
Decision Number |
18-06-027, 18-10-007 |
Advice Number |
Date Filed |
02/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Central Towers Program: Tesla-Schulte 115 kV Project in the County of Alameda and San Joaquin |
Effective Date |
03/17/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Central Towers Program: Lammers-Kasson 115 kV Project in the City of Tracy, County of San Joaquin |
Effective Date |
03/17/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Electric True-Up Part 2 - Electric Rate Change Effective March 1, 2022 |
Effective Date |
03/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval to Exercise the Ruby Pipeline Contract Step Down Rights Pursuant to Decision 21-12-035, Ordering Paragraph 3 |
Effective Date |
02/17/2022 |
Decision Number |
21-12-035 |
Advice Number |
Date Filed |
02/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Investor Owned Utility Proposed Modifications to Electric Rule 21 to Incorporate an Expedited Dispute Resolution Process Pursuant to Resolution ALJ-347 and Assembly Bill 2861 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/17/2022 |
Tariff Sheet Number |
N/A |
Subject |
Day Ahead Hourly Real Time Pricing Business Electric Vehicle Rebate Program Proposal |
Effective Date |
03/19/2022 |
Decision Number |
D.21-11-017 |
Advice Number |
Date Filed |
02/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Energy Resource Recovery Account Trigger Amount |
Effective Date |
02/15/2022 |
Decision Number |
02-10-062, 04-01-050, 04-12-048, 15-05-008 |
Advice Number |
Date Filed |
02/15/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Associated with Request for Waiver of Penalties for Failure to Meet April 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
01/23/2023 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement for Summers 2022-2023 Under Decision 21-02-028, Decision 21-03-056, and Decision 21-12-015. |
Effective Date |
02/19/2022 |
Decision Number |
21-02-028, 21-03-056, 21-12-015 |
Advice Number |
Date Filed |
02/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Advice Letter Proposing Interconnection Pathway for Vehicle-to-Grid Alternating Current Projects and Implementation Steps for Direct Current Electric Vehicle Supply Equipment Projects, Pursuant to Decision 20-09-035, with Modifications Pursuant to Resolution E -5165 |
Effective Date |
02/11/2022 |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
02/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for February 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
02/07/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
02/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter of Pacific Gas and Electric: Summer Reliability Market Access Program 2022-2023 |
Effective Date |
03/09/2022 |
Decision Number |
21-12-011 |
Advice Number |
Date Filed |
02/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Net Electric and Gas Bill Impact Study for Residential Customers Who Switch from Natural Gas Water Heater to Heat Pump Water Heater in Compliance with D.21-11-002 |
Effective Date |
12/01/2022 |
Decision Number |
21-11-002 |
Advice Number |
Date Filed |
02/04/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Tier 2 Advice Letter for the Emergency Load Reduction Program Residential Pilot A.6 Pursuant to Decision 21-12-015 and 21-12-069 |
Effective Date |
04/18/2022 |
Decision Number |
D.21-12-015 and D.21-12-069 |
Advice Number |
Date Filed |
02/04/2022 |
Tariff Sheet Number |
52546-52548 |
Subject |
Pacific Gas and Electric Company's Advice Letter to D.21-12-015 Agricultural Pumping Dynamic Rate Pilot |
Effective Date |
03/06/2022 |
Decision Number |
D.21-12-015 |
Advice Number |
Date Filed |
02/04/2022 |
Tariff Sheet Number |
52551-52555, 37687-37684 |
Subject |
Pacific Gas and Electric Company's Proposed Percentage of Income Payment Plan Pilot in Compliance with D.21-10-012 |
Effective Date |
12/15/2022 |
Decision Number |
D.21-10-012 |
Advice Number |
Date Filed |
02/03/2022 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Pension-Related Revenue Requirement for 2022 |
Effective Date |
02/03/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/02/2022 |
Tariff Sheet Number |
N/A |
Subject |
Presentation of GHG Credits on Customers' Bills |
Effective Date |
02/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/01/2022 |
Tariff Sheet Number |
52543-52544, 37681-37682 |
Subject |
Update to Sample Form 62-0401 to Reflect New Contact Center Hours of Operation |
Effective Date |
02/06/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Proposed Budget for Administrative Costs to Support the Disadvantaged Communities - Single Family Solar Homes (DAC-SASH) Program |
Effective Date |
03/03/2022 |
Decision Number |
20-12-003 |
Advice Number |
Date Filed |
02/01/2022 |
Tariff Sheet Number |
N/A |
Subject |
2023 Budget Request for the Disadvantaged Community Green Tariff (DAC-GT) and Community Solar Green Tariff (CS-GT) Programs |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
2022 Self-Generation Incentive Program Annual Budget Update Advice Letter Pursuant to Decision 21-12-031 |
Effective Date |
01/31/2022 |
Decision Number |
21-12-031 |
Advice Number |
Date Filed |
01/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
January 2021 Winter Storms Emergency Consumer Protections Summary |
Effective Date |
01/31/2022 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
01/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Emergency Load Reduction Program Pilot Terms and Conditions of Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company in Compliance With Decisions 21-12-015 and 21-12-069 |
Effective Date |
01/31/2022 |
Decision Number |
21-12-015 |
Advice Number |
Date Filed |
01/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement Transaction Quarterly Compliance Submittal (Q4, 2021) |
Effective Date |
03/02/2022 |
Decision Number |
D.03-12-062 and D.02-10-062 |
Advice Number |
Date Filed |
01/31/2022 |
Tariff Sheet Number |
N/A |
Subject |
Reservation of 2022 temporary generation and associated make-ready improvements for the purposes of mitigating Public Safety Power Shutoff events and system capacity shortfalls |
Effective Date |
10/13/2022 |
Decision Number |
D.21-01-018, D.21-12-004 |
Advice Number |
Date Filed |
01/28/2022 |
Tariff Sheet Number |
N/A |
Subject |
Bear River Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
02/28/2022 |
Decision Number |
D.03-12-035, D.08-11-043, D.10-08-004 D.03-12-035 |
Advice Number |
Date Filed |
01/27/2022 |
Tariff Sheet Number |
52534-52537 |
Subject |
Clean-Up of Electric Rate Schedules NEM and NEM2 |
Effective Date |
01/27/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Lake Britton - Hat Creek #2 Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004 and Public Utilities Code Section 851 |
Effective Date |
02/28/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Statewide Marketing, Education, and Outreach (Statewide ME&O) 2022 Annual Budget Update |
Effective Date |
01/27/2022 |
Decision Number |
19-01-005 |
Advice Number |
Date Filed |
01/27/2022 |
Tariff Sheet Number |
52539-52541, 37677-37679 |
Subject |
Revision to PG&E's Pension Contribution Balancing Accounts |
Effective Date |
02/26/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/27/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Self-Generation Incentive Program (SGIP) 2021-2025 Measurement and Evaluation Plan |
Effective Date |
02/11/2022 |
Decision Number |
19-09-027 |
Advice Number |
Date Filed |
01/24/2022 |
Tariff Sheet Number |
52520-52528, 37643-37645 |
Subject |
Clean-Up of Gas and Electric Forms |
Effective Date |
01/24/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/24/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint EPIC Administrator Advice Letter Proposal of Eligible Administrative Budget Line Items |
Effective Date |
03/14/2022 |
Decision Number |
D.21-11-028 |
Advice Number |
Date Filed |
01/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company (PG&E) 4th Quarter 2021 Solar Complaint Trends Information-Only Advice Letter |
Effective Date |
12/06/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/21/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval of Mid-Term Reliability Procurement Pursuant to D.21-06-035 and D.21-12-015 |
Effective Date |
04/21/2022 |
Decision Number |
21-06-035 and 21-12-015 |
Advice Number |
Date Filed |
01/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Approval of New Investment Management Agreement for the Qualified Nuclear Decommissioning Trusts in Compliance with Ordering Paragraph 11 of D.13-01-039 |
Effective Date |
02/19/2022 |
Decision Number |
13-01-039 |
Advice Number |
Date Filed |
01/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Building Code Advocacy Contract Amendments executed between Frontier Energy and PG&E; TRC Solutions and PG&E; and Cohen Ventures and PG&E |
Effective Date |
03/28/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/20/2022 |
Tariff Sheet Number |
N/A |
Subject |
Joint Submittal - Establishment Of Smart Communicating Thermostat Program of Southern California Edison Company (SCE), Pacific Gas and Electric Company (PG&E), and San Diego Gas and Electric Company (SDG&E), Pursuant To Decision 21-12-015 |
Effective Date |
04/06/2022 |
Decision Number |
D.21-12-015 |
Advice Number |
Date Filed |
01/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Procurement for Summers 2021 & 2022 Under Decision 21-02-028 and Decision 21-03-056 |
Effective Date |
01/24/2022 |
Decision Number |
21-02-028 and D.21-03-056 |
Advice Number |
Date Filed |
01/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
After-the-Fact Final Allocation Report Regarding Self-Generation Incentive Program (SGIP) Accumulated Funds Pursuant to Decision (D.) 21-12-031 |
Effective Date |
01/19/2022 |
Decision Number |
21-12-031 |
Advice Number |
Date Filed |
01/19/2022 |
Tariff Sheet Number |
N/A |
Subject |
Annual Capacity Price Updates Offered to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20-05-006 |
Effective Date |
Withdrawn |
Decision Number |
D.20-06-006 |
Advice Number |
Date Filed |
01/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
01/18/2022 |
Decision Number |
D.21-04-015 |
Advice Number |
Date Filed |
01/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Brighton-Grand Island No. 1 and No. 2 115kV Power Line Reconductoring and Tower Replacement Project, County of Sacramento |
Effective Date |
03/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Present Details of the Retained Resource Adequacy capacity rate for PG&E's Green Tariff Shared Renewables to include the Retained Resource Adequacy capacity as authorized in Decision 19-10-001 |
Effective Date |
04/13/2022 |
Decision Number |
21-12-036 |
Advice Number |
Date Filed |
01/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Request for Waiver of Penalties for Failure to Meet March 2022 Local Resource Adequacy Procurement Obligations |
Effective Date |
10/25/2022 |
Decision Number |
06-06-064 and 19-06-026 |
Advice Number |
Date Filed |
01/18/2022 |
Tariff Sheet Number |
N/A |
Subject |
Demonstration Related to PG&E's Disaggregated PG&E Other Local Capacity Area Requirements for March 2022, Pending Approval of AL 6384-E (Required Demonstration for PG&E's Disaggregated PG&E Other Local Capacity Area Requirements in Compliance with Ordering Paragraph 22(a) of Decision 20-06-031) |
Effective Date |
10/25/2022 |
Decision Number |
D.20-06-031 |
Advice Number |
Date Filed |
01/14/2022 |
Tariff Sheet Number |
52510-52511, 37639-37641 |
Subject |
Addition of Counties Impacted by the December 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
01/14/2022 |
Decision Number |
19-07-015. |
Advice Number |
Date Filed |
01/14/2022 |
Tariff Sheet Number |
N/A |
Subject |
Report in Compliance with Ordering Paragraph 1 of Decision 21-10-020 |
Effective Date |
03/02/2022 |
Decision Number |
21-10-020 |
Advice Number |
Date Filed |
01/14/2022 |
Tariff Sheet Number |
52503- |
Subject |
Update Agricultural Electric Schedule AG-4, AG-5, AG-R, and AG-V to Align with Approval to Change Legacy AG-A Time-of-Use (TOU) Rates from Connected Load to Metered Demand in March 2025. |
Effective Date |
02/13/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/13/2022 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
01/13/2022 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
01/13/2022 |
Tariff Sheet Number |
52499-52501 |
Subject |
Clean-Up of Electric E-TOU-C |
Effective Date |
01/13/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/12/2022 |
Tariff Sheet Number |
52496-52497 |
Subject |
Request to Establish an AB 1X Balancing Account to Refund Over-Collected Bond Charges and Future Energy Crisis Litigation Resolution Monies |
Effective Date |
02/11/2022 |
Decision Number |
D.21-12-001 |
Advice Number |
Date Filed |
01/11/2022 |
Tariff Sheet Number |
N/A |
Subject |
Cow Creek Land Donation - Request for Approval under Decision D.03-12-035, D.08-11-043, D.10-08-004, and Public Utilities Code Section 851 |
Effective Date |
02/03/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/11/2022 |
Tariff Sheet Number |
52495-52489 |
Subject |
Modifications to PG&E's Interconnection Application Forms to Incorporate Customer-Owned Telemetry Options in the Application Portal pursuant to the Rule 21 Working Group 1 Decision 19-03-013 |
Effective Date |
02/22/2022 |
Decision Number |
D.19-03-013 |
Advice Number |
Date Filed |
01/10/2022 |
Tariff Sheet Number |
52486-52488 |
Subject |
Third Supplemental: 2022 Annual Electric True-Up - Consolidated Electric Rate Changes Effective January 1, 2022 |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Routine Annual Advice Letter for Fixed Recovery Charges True-up Mechanism |
Effective Date |
03/01/2022 |
Decision Number |
D.21-06-030 |
Advice Number |
Date Filed |
01/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Energy Price Updates for January 2022 Eligible to Qualifying Facilities of 20 Megawatts or Less in Compliance with Decision 20 05 006 |
Effective Date |
01/07/2022 |
Decision Number |
D.20-05-006 |
Advice Number |
Date Filed |
01/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: PG&E's 2022-2023 Energy Efficiency Biennial Budget Advice Letter in Compliance with Decisions 15-10-028, 18-05-041, and 21-05-031 |
Effective Date |
01/01/2022 |
Decision Number |
15-10-028, 18-05-041, and 21-05-031 |
Advice Number |
Date Filed |
01/07/2022 |
Tariff Sheet Number |
N/A |
Subject |
Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Sanger Unified Education Center Power-Line Relocation Project in the County of Fresno |
Effective Date |
03/02/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/07/2022 |
Tariff Sheet Number |
52478-52484 |
Subject |
Second Supplemental: Advice Letter Modifying Electric Rule 21 Pursuant to Ordering Paragraphs 7, 49, 50 Decision 20-09-035 for Working Group 2 and 3 |
Effective Date |
08/06/2021 |
Decision Number |
D.20-09-035 |
Advice Number |
Date Filed |
01/06/2022 |
Tariff Sheet Number |
52475-52477 |
Subject |
Supplemental: Electric Rate Change Effective December 1, 2021 |
Effective Date |
12/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/05/2022 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Establishment of the Wildfire and Natural Disaster Resiliency Rebuild Program Balancing Account |
Effective Date |
12/09/2021 |
Decision Number |
21-11-002 |