Advice Number | Date Filed | Tariff Sheet Number | Subject | Effective Date | Decision Number | |
---|---|---|---|---|---|---|
12/29/2021
|
37626-37630, 52262-52265
|
Establishing the Cost of Capital Memorandum Accounts Per Ordering Paragraph 3 of D.21-12-029
|
01/01/2022
|
21-12-029
|
||
12/20/2021
|
N/A
|
2021 Annual Update on Capital Structure in Compliance with OP 9 of Decision 20-05-053
|
12/21/2022
|
D.20-05-053
|
||
12/16/2021
|
N/A
|
Supplemental: San Francisco General Office Post-Close Final Calculations for the Net Gain on the Sale and Related Tax Information in Compliance with Decision 21-08-027
|
12/01/2021
|
21-08-027
|
||
12/10/2021
|
N/A
|
Partial Supplement - Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8
|
11/05/2021
|
N/A
|
||
12/09/2021
|
37555-37556, 52239-52240
|
Update to Sample Forms to Reflect New Contact Center Hours of Operation
|
01/08/2022
|
N/A
|
||
12/02/2021
|
37541-37543, 52187-52188
|
Addition of Counties Impacted by the January 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
12/02/2021
|
D.19-07-015
|
||
12/01/2021
|
37538-37539, 52182-52183
|
Temporary Tracking of Percentage of Income Payment Plan pilot administrative costs in the Disconnection Memorandum Accounts
|
10/07/2021
|
N/A
|
||
12/01/2021
|
N/A
|
San Francisco General Office Post-Close Final Calculations for the Net Gain on the Sale and Related Tax Information in Compliance with Decision 21-08-027
|
Superceded
|
N/A
|
||
11/30/2021
|
N/A
|
Supplemental: PG&E's 2022 Base Revenue Requirements Effective January 1, 2022
|
01/01/2022
|
N/A
|
||
11/29/2021
|
N/A
|
Submission of the Pacific Gas and Electric's (PG&E) E-6 and EM-TOU Electric Rates to be added as a Self-Generation Incentive Program Approved Rate
|
12/29/2022
|
19-08-001
|
||
11/19/2021
|
N/A
|
Supplemental Advice Letter of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Standards Advocacy Contract Change Order executed between 2050 Partners, Inc. and PG&E
|
12/21/2021
|
18-01-004
|
||
11/19/2021
|
N/A
|
Pacific Gas &Electric Company Advice Letter Pursuant to Decision 21-06-015 for the Energy Savings Assistance Program Pilot Plus and Pilot Deep Implementation Plan
|
12/19/2021
|
21-06-015
|
||
11/12/2021
|
N/A
|
Pacific Gas and Electric Company's Acknowledgment of CalEnviroScreen 4.0 Version Release
|
11/12/2021
|
N/A
|
||
11/12/2021
|
N/A
|
Implementation of WEMA Revenue Requirement and Customer Credit
|
12/12/2021
|
21-10-022
|
||
11/08/2021
|
N/A
|
PG&E's 2022-2023 Energy Efficiency Biennial Budget Advice Letter in Compliance with Decisions 15-10-028, 18-05-041, and 21-05-031
|
Superceded
|
D.15-10-028, D.18-05-041, D.21-05-031
|
||
11/05/2021
|
N/A
|
Joint Submittal regarding Proposed Modifications to the Self-Generation Incentive Program Handbook Related to Program Processing Improvements
|
12/05/2021
|
N/A
|
||
11/05/2021
|
37495-37497, 51935-51936
|
Addition of Washington, Hopkins and KNP Complex Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015
|
|
19-07-015
|
||
11/01/2021
|
N/A
|
Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Clean Energy Programs Workshop
|
11/01/2021
|
21-06-015
|
||
11/01/2021
|
N/A
|
PG&E's 2022 Base Revenue Requirements Effective January 1, 2022
|
Superceded
|
N/A
|
||
10/28/2021
|
N/A
|
Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities
|
Pending
|
21-06-036
|
||
10/28/2021
|
N/A
|
Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities
|
12/01/2021
|
21-06-036
|
||
10/26/2021
|
N/A
|
2020 General Rate Case 2022 Revenue Requirement Implementation Compliance with Ordering Paragraph 6
|
11/26/2021
|
D.20-12-005
|
||
10/21/2021
|
N/A
|
PG&E's Uncollectibles Factor Effective January 1, 2022 in Compliance with the 2020 General Rate Case Decision 20-12-005
|
01/01/2022
|
D.20-12-005
|
||
10/15/2021
|
37453-37454, 51642-51645
|
New Forms and Online Portal Availability to Support Rule 21 OIRs
|
12/20/2021
|
D.20-09-035, D.21-06-002
|
||
10/15/2021
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
10/15/2021
|
D.21-04-015
|
||
10/12/2021
|
37449-37451, 51614-51615
|
Addition of Fawn Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
10/12/2021
|
D.19-07-015
|
||
10/12/2021
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
10/12/2021
|
D.14-05-016
|
||
10/08/2021
|
N/A
|
Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company's Request for Approval of Incremental Investor-Owned Utility Ratepayer Funding for the California Hub for Energy Efficiency Financing (CHEEF) Programs through June 30, 2027
|
11/08/2021
|
D.21-08-006
|
||
10/08/2021
|
N/A
|
Vegetation Management Balancing Account and Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 and 9
|
11/06/2021
|
20-12-005
|
||
10/06/2021
|
N/A
|
Supplemental: Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8
|
Superceded
|
N/A
|
||
10/04/2021
|
37443-37444, 51599-51600
|
Modifications to PG&E's Mobilehome Park Utility Conversion Program Agreement Pursuant to Decision 21-08-025
|
10/04/2021
|
21-08-025
|
||
10/01/2021
|
N/A
|
Notification of Addition of New Events to Wildfire Expense Memorandum Account
|
10/01/2021
|
D.18-06-029
|
||
10/01/2021
|
N/A
|
Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Online Data Management and Visualization Dashboard Plan
|
04/10/2022
|
N/A
|
||
09/30/2021
|
N/A
|
Pacific Gas and Electric Company's 2022 Annual Low Carbon Fuel Standard Credit and Revenue Estimate
|
10/30/2021
|
14-12-083
|
||
09/30/2021
|
N/A
|
Proposed Self-Generation Incentive Program (SGIP) Handbook Modifications to Pre-installation Monitoring Requirements for Measurement and Evaluation (M&E) of Large Thermal Energy Storage (L-TES) Projects
|
10/31/2021
|
N/A
|
||
09/27/2021
|
N/A
|
Glass, Oak, and Zogg Fires Emergency Consumer Protections Summary
|
09/27/2021
|
19-07-015
|
||
09/23/2021
|
N/A
|
PG&E's Tier 2 Advice Letter Addressing Annual Costs Associated with Development and Deployment of IT & Marketing Strategies for the CHEEF Programs.
|
10/23/2021
|
D.21-08-006
|
||
09/22/2021
|
N/A
|
Revisions to August 2020 Fires Emergency Consumer Protections Summary
|
09/22/2021
|
N/A
|
||
09/21/2021
|
37405-37407, 51580-51582
|
Addition of Cache Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
09/21/2021
|
D.19-07-015
|
||
09/20/2021
|
37401-37402, 51571-51572
|
Establish General Office Sale Balancing Accounts and Modify General Office Sale Memorandum Accounts
|
09/20/2021
|
N/A
|
||
09/17/2021
|
N/A
|
PG&E's San Joaquin Valley Disadvantaged Communities Pilot Implementation Plan Amendment to Language
|
09/17/2021
|
D.18-12-015
|
||
09/17/2021
|
37398-37399, 51558-51559
|
Revision to Gas Rule No. 2 and Electric Rule No. 2
|
01/01/2022
|
N/A
|
||
09/17/2021
|
37395-37396, 51555-51556
|
Revisions to Residential Allowances Gas Rule No. 15.H.2 and Electric Rule No. 15.I.2
|
01/01/2022
|
N/A
|
||
09/16/2021
|
N/A
|
Supplemental: Revision to Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Multifamily Common Area Measure Program Budgets and Annual Property Treatment Targets for Program Year 2021-2022 [Pursuant to Decision 21-06-015, Ordering Paragraph 148]
|
08/02/2021
|
D.21-06-015
|
||
09/14/2021
|
37390-37391, 51485-51487
|
Supplemental: Revision to the Butte County Mobilehome Park Rebuild Program Agreement (Form 79-1201) for Mobilehome Park Owners/Operators in Butte County Pursuant to Resolution E-5070 and Other Miscellaneous Update
|
09/14/2021
|
N/A
|
||
09/08/2021
|
37387-37386, 51482-51481
|
Revisions to Emergency Consumer Protection Plan for the Dixie, River and Caldor Fires in Compliance with Decision 19-07-015.
|
09/08/2021
|
D.19-07-15
|
||
09/07/2021
|
N/A
|
Creek Fire Emergency Consumer Protections Summary
|
09/07/2021
|
D.19-07-015
|
||
09/02/2021
|
N/A
|
Pacific Gas and Electric Company, Center for Sustainable Energy, Southern California Edison Company, and Southern California Gas Company's Proposed Modifications to the 2021 Self-Generation Incentive Program Handbook in Compliance with D.21-06-005
|
12/16/2021
|
21-06-005
|
||
09/01/2021
|
N/A
|
Joint IOU Advice Letter Pursuant To Decision 21-06-015 For The Energy Savings Assistance (ESA) Program Design And Delivery Of The Measure Treatment Tiers For Program Years 2022-2026
|
10/01/2021
|
D.21-06-015
|
||
08/31/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Standards Advocacy Contract Change Order executed between 2050 Partners, Inc. and PG&E
|
12/21/2021
|
18-01-004
|
||
08/30/2021
|
N/A
|
Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8
|
Superceded
|
N/A
|
||
08/20/2021
|
37340-37350, 51207-51225
|
Addition of Antelope, River, McFarland, Monument, and Caldor Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
08/20/2021
|
D.19-07-015
|
||
08/18/2021
|
N/A
|
August 2020 Fires Emergency Consumer Protections Summary
|
08/18/2021
|
19-07-015
|
||
08/09/2021
|
37332-37333, 51179-51180
|
Modification to Electric Preliminary Statement Part IA and Gas Preliminary Statement Part FD
|
09/08/2021
|
N/A
|
||
08/09/2021
|
37326-37329, 51171-51175
|
Extension of Specific Measures of PG&E's Emergency Consumer Protection Plan Due to the COVID-19 Pandemic Through September 30, 2021 Pursuant to Decision 21-06-036 and the Addition of Dixie, Fly, and Tamarack Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
08/09/2021
|
D.19-07-015, D.21-06-036
|
||
08/03/2021
|
N/A
|
Notification of the Creation of a New Affiliate: PG&E Recovery Funding LLC
|
08/03/2021
|
D.97-12-088, D.98-08-035 and D.06-12-029
|
||
08/02/2021
|
N/A
|
Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Multifamily Common Area Measure Program Budgets and Annual Property Treatment Targets for Program Year 2021-2022 [Pursuant to Decision 21-06-015, Ordering Paragraph 148]
|
Superceded
|
N/A
|
||
07/22/2021
|
N/A
|
Add the San Francisco Marina Safeway Property to the Hazardous Substance Mechanism
|
08/21/2021
|
D.94-05-020 and D. 96-07-016
|
||
07/15/2021
|
N/A
|
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2
|
07/15/2021
|
21-04-015
|
||
07/12/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") - California Energy-Smart Homes Mixed Fuel Residential Program, executed between TRC Solutions, Inc. and PG&E
|
09/15/2021
|
D.18-01-004
|
||
07/12/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") - California Energy-Smart Homes All Electric Residential Program, executed between TRC Solutions, Inc. and PG&E
|
08/11/2021
|
D.18-01-004
|
||
07/09/2021
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
07/10/2021
|
D.14-05-016
|
||
07/08/2021
|
37278-37279, 50623-50641
|
Clean-Up of Gas and Electric Tariffs
|
|
N/A
|
||
07/07/2021
|
37268-37270, 50551-50556
|
Addition of January 2021 Wind Events to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015.
|
07/07/2021
|
D.19-07-015.
|
||
06/30/2021
|
N/A
|
PG&E's Annual Advanced Energy Rebuild Advice Letter in Compliance with Commission Disposition
|
06/30/2021
|
N/A
|
||
06/30/2021
|
N/A
|
2021 Affiliate Transaction Rules Compliance Plan
|
06/30/2021
|
D.97-12-088 and D.06-12-029
|
||
06/24/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide State of California Request for Proposal ("RFP") program, executed between Alternative Energy Systems Consulting, Inc and PG&E
|
07/28/2021
|
D.18-01-004
|
||
06/23/2021
|
N/A
|
Transfer of Residential Uncollectibles from COVID-19 Pandemic Protections Memorandum Accounts (CPPMA) into Residential Uncollectible Balancing Accounts (RUBA)
|
07/23/2021
|
D. 20-06-003
|
||
06/21/2021
|
37232-37233, 50060-50061
|
Revision to the Butte County Mobilehome Park Rebuild Program Agreement (Form 79-1201) for Mobilehome Park Owners/Operators in Butte County Pursuant to Resolution E-5070 and Other Miscellaneous Update
|
09/14/2021
|
N/A
|
||
06/17/2021
|
N/A
|
Add the Ignacio-Alto-Sausalito Structures to the Hazardous Substance Mechanism
|
07/17/2021
|
D.94-05-020
|
||
06/15/2021
|
N/A
|
BayREN and PG&E's Joint Cooperation Memo in Compliance with D.18-05-041, Ordering Paragraph 38 for Program Year 2022
|
07/15/2021
|
D.18-05-041
|
||
06/15/2021
|
N/A
|
PG&E and MCE's 2022 Joint Cooperation Memo in Compliance with Decision 18-05-041, Ordering Paragraph 38
|
07/15/2021
|
D.18-05-041
|
||
06/15/2021
|
N/A
|
2022 Joint Cooperation Memorandum (JCM) of 3C-REN, SoCalGas, SCE, and PG&E Pursuant to Decision (D.) 18-05-041
|
07/15/2021
|
D.18-05-041
|
||
06/11/2021
|
37225-37226, 50036-50037
|
General Office Sale Memorandum Account
|
07/11/2021
|
N/A
|
||
06/08/2021
|
N/A
|
Supplemental: Notification of the Creation of a New Affiliate: PG&E ShareCo LLC
|
05/17/2021
|
D.97-12-088, D.98-08-035 and D.06-12-029
|
||
06/08/2021
|
N/A
|
Revised Low Carbon Fuel Standard Credits Sales Plans for Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company
|
07/08/2021
|
N/A
|
||
06/03/2021
|
37218-37220, 50017-50020
|
Additional Emergency Customer Protection Measure Pursuant to Resolution M-4842, Resolution M-4849 and Decision 19-07-015. - Deferring of Rule 15 Contract Compliance Timelines
|
07/06/2021
|
D.19-07-015
|
||
06/01/2021
|
N/A
|
Request to Recover 2020 Liability Insurance Costs in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005
|
06/20/2021
|
N/A
|
||
05/28/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide Workforce Education and Training Career Connections Request for Proposal ("RFP") Energy is Everything program, executed between The Energy Coalition and PG&E
|
06/25/2021
|
D.18-08-004
|
||
05/28/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide Workforce Education and Training Career and Workforce Readiness Request for Proposal ("RFP") Energize Careers program, executed between Strategic Energy Innovations and PG&E
|
06/25/2021
|
D.18-01-004
|
||
05/24/2021
|
N/A
|
Self-Generation Incentive Program (SGIP) 2021-2025 Measurement and Evaluation Plan
|
Superceded
|
19-09-027
|
||
05/19/2021
|
N/A
|
PG&E's Self-Generation Incentive Program (SGIP) Budget Information per Administrative Law Judge's (ALJ) Ruling dated April 16, 2021
|
05/19/2021
|
N/A
|
||
05/17/2021
|
N/A
|
Notification of the Creation of a New Affiliate: PG&E ShareCo LLC
|
05/17/2021
|
D.97-12-088, D.98-08-035 and D.06-12-029
|
||
05/14/2021
|
37152-37154, 49764-49767
|
Medium and Large Commercial and Industrial COVID-19 Disconnection Moratorium Memorandum Account
|
12/30/2020
|
D.21-04-015
|
||
05/07/2021
|
N/A
|
Copy of Request to the Internal Revenue Service in Compliance with 2017 GRC Decision 19-08-023 Ordering Paragraph 6 and 2015 GT&S Decision 19-08-021 Ordering Paragraph 6
|
05/07/2021
|
D. 19-08-023, 19-08-021
|
||
05/03/2021
|
37142-37146, 49737-49741
|
Pacific Gas and Electric Company's Proposed Modifications to Medical Baseline Program Self-Certification Request Form (Form 61-0502) and Medical Baseline Program Application (Form 62-3481)
|
07/01/2021
|
D.20-06-003
|
||
04/30/2021
|
37134-37137, 49728-49735
|
Revised Household Income Requirements for California Alternate Rates for Energy (CARE) and Family Electric Rate Assistance (FERA) Programs and Modification of Applicable Forms
|
06/01/2021
|
N/A
|
||
04/30/2021
|
N/A
|
Supplemental: Tier 1 Advice Letter re Executive Compensation
|
03/17/2022
|
D.20-05-053
|
||
04/29/2021
|
N/A
|
Tier 2 Advice Letter Regarding Nominees for Customer Credit Trust Management Committee
|
05/20/2021
|
D.21-04-030
|
||
04/27/2021
|
N/A
|
Supplemental: PG&E's COVID-19 Emergency Customer Protections Transition Plan, Pursuant to Resolution M-4849, Ordering Paragraph 5
|
04/01/2021
|
N/A
|
||
04/16/2021
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
04/16/2021
|
D.14-05-016
|
||
04/15/2021
|
N/A
|
Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Program Bridge Funding and Retreatment Interim Progress Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2 and Decision 19-06-022, Ordering Paragraph 4]
|
04/15/2021
|
D.19-06-022
|
||
04/13/2021
|
N/A
|
Proposed Revisions to the Self-Generation Incentive Program Handbook to Clarify Requirements for Multifamily Applications to Remove Ambiguity as to How Multifamily Properties are Classified for Purposes of Greenhouse Gas Emissions Reduction Requirements, Operational Requirements, and Incentive Payment Structure and to Replace "Food Bank" with "Emergency Feeding Organization"
|
05/13/2021
|
D.21-03-002
|
||
04/09/2021
|
N/A
|
Tier 1 Advice Letter re Executive Compensation
|
03/17/2022
|
D.20-05-053
|
||
04/02/2021
|
N/A
|
Pacific Gas and Electric Company's Request to Shift Funds in the Energy Saving Assistance Program
|
Withdrawn
|
08-11-031, as modified by D.10-10-008, D.16-11-022
|
||
04/01/2021
|
37071-37072, 49317-49318
|
PG&E's COVID-19 Emergency Customer Protections Transition Plan, Pursuant to Resolution M-4849, Ordering Paragraph 5
|
04/01/2021
|
N/A
|
||
04/01/2021
|
N/A
|
Annual Report for Relocation Work Performed for the California High-Speed Rail Authority (CHSRA), in Compliance with Resolution G-3498
|
05/01/2021
|
N/A
|
||
03/30/2021
|
N/A
|
Annual Update regarding Pacific Gas and Electric Company's Climate Vulnerability Assessment
|
03/31/2021
|
D.20-08-046
|
||
03/29/2021
|
N/A
|
PG&E's Pension-Related Revenue Requirement for 2021
|
03/29/2021
|
N/A
|
||
03/29/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP"), Continuous Energy Feedback Program (CEFP) program, executed between Oracle America Inc. and PG&E
|
04/28/2021
|
D. 18-01-004
|
||
03/24/2021
|
N/A
|
Proposed Modifications to the Self-Generation Incentive Program (SGIP) Handbook to Implement the Stay on Cancellation of Projects Past their Third Six-Month Extension Due to Issues Related to the COVID-19 Pandemic Pursuant to Decision (D.) 21-03-009
|
Effective Pending Final Disposition
|
N/A
|
||
03/24/2021
|
N/A
|
Proposed Modifications to the Self-Generation Incentive Program (SGIP) Handbook to Implement Pause on Performance-Based Incentive (PBI) Calculations Due to the COVID-19 Pandemic Pursuant to Decision (D.) 21-03-008
|
03/24/2021
|
21-03-008
|
||
03/19/2021
|
N/A
|
PG&E's Summary of Customer Protections Offered in Response to the COVID-19 Pandemic, Pursuant to D.19-07-015, OP 6
|
03/18/2021
|
19-07-015
|
||
03/16/2021
|
N/A
|
Proposal for Self-Generation Incentive Program (SGIP) Residential Price Cap in Accordance with Decision 19-09-027, Ordering Paragraphs 7(g) and 8(a).
|
Rejected
|
D.19-09-027
|
||
03/15/2021
|
37007-37008, 49244-49246
|
Tier 3 Advice Letter Regarding an Independent Safety Monitor
|
08/05/2021
|
D.20-05-053
|
||
03/15/2021
|
N/A
|
Self-Generation Incentive Plan (SGIP) Residential Equity Resiliency Marketing Plan and Implementation Strategy
|
Rejected
|
N/A
|
||
03/12/2021
|
N/A
|
Grant of Easement to Alameda County Flood Control and Water Conservation District for a Multi-Purpose Public Pedestrian Path - Request for Approval Under Section 851 and General Order 173
|
04/11/2021
|
N/A
|
||
03/09/2021
|
37006-37002, 49240-49243
|
Supplemental: Addition of Privacy Statement Pursuant to the California Consumer Privacy Act and other Updates to PG&E's Gas and Electric Sample Forms
|
02/04/2021
|
N/A
|
||
03/05/2021
|
N/A
|
Modifications to the Pacific Gas and Electric Company's On-Bill Financing (OBF) Loan Program Pursuant to D.19-03-001.
|
04/04/2021
|
D.19-03-001
|
||
03/04/2021
|
N/A
|
Compliance with Decision 20-12-005 Ordering Paragraph 13 for Customer Deposits
|
04/03/2021
|
D.20-12-005
|
||
03/03/2021
|
N/A
|
Add the Rancho Capay Meter Station Site to the Hazardous Substance Mechanism
|
04/02/2021
|
94-05-020
|
||
02/23/2021
|
N/A, 48876-48877
|
Vegetation Management Balancing Account and Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 and 9
|
03/25/2021
|
D.20-12-005
|
||
02/22/2021
|
36964-36967, 48745-48750
|
Extension of Pacific Gas and Electric Company's Emergency Consumer Protection Plan to Support Customers During the COVID 19 Pandemic Pursuant to Resolution M-4849
|
Effective Pending Final Disposition
|
N/A
|
||
02/19/2021
|
36926-36927, 48732-48733
|
Establish the Regionalization Plan Memorandum Account (RPMA) to Record Costs Incurred Implementing regionalization as proposed in Application (A.) 20-06-011.
|
02/19/2021
|
N/A
|
||
02/19/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") Non-Residential, Mixed Fuel - California New Construction program, executed between Willdan Energy Solutions and PG&E
|
04/28/2021
|
D.18-01-004
|
||
02/19/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") Non-Residential, All Electric - California New Construction program, executed between Willdan Energy Solutions and PG&E
|
04/28/2021
|
D.18-01-004
|
||
02/16/2021
|
36923-36924, 48728-48729
|
Addition of January 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015
|
02/16/2021
|
19-07-015
|
||
02/05/2021
|
36909-36912, 48720-48726
|
Implement Tariff Changes in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005
|
01/01/2020
|
D.20-12-005
|
||
02/04/2021
|
36829-36902, 48543-48711
|
Addition of Privacy Statement Pursuant to the California Consumer Privacy Act and other Updates to PG&E's Gas and Electric Sample Forms
|
02/04/2021
|
N/A
|
||
02/03/2021
|
36820-36824, 48536-48537
|
Clean-Up of Gas and Electric Tariffs
|
02/03/2021
|
N/A
|
||
02/01/2021
|
N/A
|
Joint Tier 1 Advice Letter to Fund the School Energy Efficiency Stimulus Program in Compliance with Decision 21-01-004
|
02/01/2021
|
D.21-01-004
|
||
02/01/2021
|
N/A
|
Advice Letter Summarizing PG&E's 2021 Energy Efficiency Budget Recovery Request for San Francisco Bay Area Regional Energy Network, Tri-County Regional Energy Network, and Marin Clean Energy in Alignment with PG&E's 2021 Energy Efficiency Annual Budget Advice Letter.
|
02/01/2021
|
N/A
|
||
02/01/2021
|
36816-36817, 48514-48515
|
Advice Letter Summarizing Establishment of Balancing Accounts to Record Funding Amounts Allocated to the School Energy Efficiency Stimulus Program in Compliance with Decision 21-01-004.
|
02/01/2021
|
D. 21-01-004
|
||
01/26/2021
|
N/A
|
Supplemental: Revision to January 1, 2021 - June 30, 2021 Energy Savings Assistance Program Bridge Funding and Retreatment Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2]
|
12/24/2020
|
D.19-06-022
|
||
01/25/2021
|
N/A
|
PG&E's 2021 Base Revenue Requirements Effective January 1, 2021
|
01/01/2021
|
N/A
|
||
01/22/2021
|
N/A
|
Supplemental: Revision to January 1, 2021 - June 30, 2021 Energy Savings Assistance Program Bridge Funding and Retreatment Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2]
|
Superceded
|
D.19-06-022
|
||
01/22/2021
|
36780-36781, 48370-48371
|
Pacific Gas and Electric Company's Revisions to Electric and Gas Rule 19 to Update the End Date for Medical Baseline Customer Protections
|
01/22/2021
|
19-07-015
|
||
01/22/2021
|
N/A
|
Supplemental: Pacific Gas and Electric Company's Plan to Implement Senate Bill 1338's Requirements in Support of the Medical Baseline Program, Pursuant to D.20-06-003, Ordering Paragraphs 39-41
|
09/23/2021
|
20-06-003
|
||
01/19/2021
|
N/A
|
Return to Ratepayers of Excess Accumulated Deferred Income Taxes Pursuant to the 2017 Tax Act
|
02/18/2021
|
D. 20-12-005
|
||
01/13/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") NetOne program, executed between Ecology Action and PG&E
|
02/12/2021
|
D.18-01-004
|
||
01/13/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") Healthcare Energy Fitness Initiative program, executed between Nexant and PG&E.
|
02/12/2021
|
D.18-01-004
|
||
01/13/2021
|
N/A
|
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") Advanced Energy program, executed between Nexant and PG&E
|
02/12/2021
|
D.18-01-004
|
||
01/13/2021
|
36752-36754, 48303-48306
|
Supplemental: Establishment of Residential Uncollectibles Balancing Accounts (RUBA) in Compliance with Decision 20-06-003.
|
06/11/2020
|
N/A
|
||
01/12/2021
|
N/A
|
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016
|
01/12/2021
|
D.14-05-016
|
||
01/12/2021
|
N/A
|
Pacific Gas and Electric Company's Proposal to Implement an On-Bill Financing Resiliency Pilot for K-12 Schools
|
Withdrawn
|
N/A
|
||
01/08/2021
|
36747-36748, 48273-48287
|
Second Supplemental: Clean-Up of Gas and Electric Tariffs
|
08/18/2020
|
N/A
|
||
01/07/2021
|
N/A
|
Pacific Gas and Electric Company's Plan to Close 10 Customer Service Offices Pursuant to D. 20-12-005
|
01/07/2021
|
D.20-12-005
|
||
01/04/2021
|
N/A
|
Proposed Dynamic Methodology for Large Thermal Energy Storage Incentive Calculations and Updates to the Self-Generation Incentive Program (SGIP) Handbook in Compliance with Ordering Paragraphs 2 and 3 of Resolution E-5106
|
07/13/2021
|
N/A
|
Advice Number |
---|
Date Filed |
12/29/2021 |
Tariff Sheet Number |
37626-37630, 52262-52265 |
Subject |
Establishing the Cost of Capital Memorandum Accounts Per Ordering Paragraph 3 of D.21-12-029 |
Effective Date |
01/01/2022 |
Decision Number |
21-12-029 |
Advice Number |
Date Filed |
12/20/2021 |
Tariff Sheet Number |
N/A |
Subject |
2021 Annual Update on Capital Structure in Compliance with OP 9 of Decision 20-05-053 |
Effective Date |
12/21/2022 |
Decision Number |
D.20-05-053 |
Advice Number |
Date Filed |
12/16/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: San Francisco General Office Post-Close Final Calculations for the Net Gain on the Sale and Related Tax Information in Compliance with Decision 21-08-027 |
Effective Date |
12/01/2021 |
Decision Number |
21-08-027 |
Advice Number |
Date Filed |
12/10/2021 |
Tariff Sheet Number |
N/A |
Subject |
Partial Supplement - Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8 |
Effective Date |
11/05/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/09/2021 |
Tariff Sheet Number |
37555-37556, 52239-52240 |
Subject |
Update to Sample Forms to Reflect New Contact Center Hours of Operation |
Effective Date |
01/08/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/02/2021 |
Tariff Sheet Number |
37541-37543, 52187-52188 |
Subject |
Addition of Counties Impacted by the January 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
12/02/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
12/01/2021 |
Tariff Sheet Number |
37538-37539, 52182-52183 |
Subject |
Temporary Tracking of Percentage of Income Payment Plan pilot administrative costs in the Disconnection Memorandum Accounts |
Effective Date |
10/07/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
12/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
San Francisco General Office Post-Close Final Calculations for the Net Gain on the Sale and Related Tax Information in Compliance with Decision 21-08-027 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: PG&E's 2022 Base Revenue Requirements Effective January 1, 2022 |
Effective Date |
01/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/29/2021 |
Tariff Sheet Number |
N/A |
Subject |
Submission of the Pacific Gas and Electric's (PG&E) E-6 and EM-TOU Electric Rates to be added as a Self-Generation Incentive Program Approved Rate |
Effective Date |
12/29/2022 |
Decision Number |
19-08-001 |
Advice Number |
Date Filed |
11/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental Advice Letter of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Standards Advocacy Contract Change Order executed between 2050 Partners, Inc. and PG&E |
Effective Date |
12/21/2021 |
Decision Number |
18-01-004 |
Advice Number |
Date Filed |
11/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas &Electric Company Advice Letter Pursuant to Decision 21-06-015 for the Energy Savings Assistance Program Pilot Plus and Pilot Deep Implementation Plan |
Effective Date |
12/19/2021 |
Decision Number |
21-06-015 |
Advice Number |
Date Filed |
11/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Acknowledgment of CalEnviroScreen 4.0 Version Release |
Effective Date |
11/12/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Implementation of WEMA Revenue Requirement and Customer Credit |
Effective Date |
12/12/2021 |
Decision Number |
21-10-022 |
Advice Number |
Date Filed |
11/08/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's 2022-2023 Energy Efficiency Biennial Budget Advice Letter in Compliance with Decisions 15-10-028, 18-05-041, and 21-05-031 |
Effective Date |
Superceded |
Decision Number |
D.15-10-028, D.18-05-041, D.21-05-031 |
Advice Number |
Date Filed |
11/05/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Submittal regarding Proposed Modifications to the Self-Generation Incentive Program Handbook Related to Program Processing Improvements |
Effective Date |
12/05/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
11/05/2021 |
Tariff Sheet Number |
37495-37497, 51935-51936 |
Subject |
Addition of Washington, Hopkins and KNP Complex Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015 |
Effective Date |
|
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
11/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Clean Energy Programs Workshop |
Effective Date |
11/01/2021 |
Decision Number |
21-06-015 |
Advice Number |
Date Filed |
11/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's 2022 Base Revenue Requirements Effective January 1, 2022 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/28/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities |
Effective Date |
Pending |
Decision Number |
21-06-036 |
Advice Number |
Date Filed |
10/28/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Submittal regarding Small Business Customer Outreach Pilot for Disadvantaged Communities |
Effective Date |
12/01/2021 |
Decision Number |
21-06-036 |
Advice Number |
Date Filed |
10/26/2021 |
Tariff Sheet Number |
N/A |
Subject |
2020 General Rate Case 2022 Revenue Requirement Implementation Compliance with Ordering Paragraph 6 |
Effective Date |
11/26/2021 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
10/21/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Uncollectibles Factor Effective January 1, 2022 in Compliance with the 2020 General Rate Case Decision 20-12-005 |
Effective Date |
01/01/2022 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
10/15/2021 |
Tariff Sheet Number |
37453-37454, 51642-51645 |
Subject |
New Forms and Online Portal Availability to Support Rule 21 OIRs |
Effective Date |
12/20/2021 |
Decision Number |
D.20-09-035, D.21-06-002 |
Advice Number |
Date Filed |
10/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
10/15/2021 |
Decision Number |
D.21-04-015 |
Advice Number |
Date Filed |
10/12/2021 |
Tariff Sheet Number |
37449-37451, 51614-51615 |
Subject |
Addition of Fawn Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
10/12/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
10/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
10/12/2021 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
10/08/2021 |
Tariff Sheet Number |
N/A |
Subject |
Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company's Request for Approval of Incremental Investor-Owned Utility Ratepayer Funding for the California Hub for Energy Efficiency Financing (CHEEF) Programs through June 30, 2027 |
Effective Date |
11/08/2021 |
Decision Number |
D.21-08-006 |
Advice Number |
Date Filed |
10/08/2021 |
Tariff Sheet Number |
N/A |
Subject |
Vegetation Management Balancing Account and Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 and 9 |
Effective Date |
11/06/2021 |
Decision Number |
20-12-005 |
Advice Number |
Date Filed |
10/06/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
10/04/2021 |
Tariff Sheet Number |
37443-37444, 51599-51600 |
Subject |
Modifications to PG&E's Mobilehome Park Utility Conversion Program Agreement Pursuant to Decision 21-08-025 |
Effective Date |
10/04/2021 |
Decision Number |
21-08-025 |
Advice Number |
Date Filed |
10/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Notification of Addition of New Events to Wildfire Expense Memorandum Account |
Effective Date |
10/01/2021 |
Decision Number |
D.18-06-029 |
Advice Number |
Date Filed |
10/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Online Data Management and Visualization Dashboard Plan |
Effective Date |
04/10/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's 2022 Annual Low Carbon Fuel Standard Credit and Revenue Estimate |
Effective Date |
10/30/2021 |
Decision Number |
14-12-083 |
Advice Number |
Date Filed |
09/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Self-Generation Incentive Program (SGIP) Handbook Modifications to Pre-installation Monitoring Requirements for Measurement and Evaluation (M&E) of Large Thermal Energy Storage (L-TES) Projects |
Effective Date |
10/31/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/27/2021 |
Tariff Sheet Number |
N/A |
Subject |
Glass, Oak, and Zogg Fires Emergency Consumer Protections Summary |
Effective Date |
09/27/2021 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
09/23/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Tier 2 Advice Letter Addressing Annual Costs Associated with Development and Deployment of IT & Marketing Strategies for the CHEEF Programs. |
Effective Date |
10/23/2021 |
Decision Number |
D.21-08-006 |
Advice Number |
Date Filed |
09/22/2021 |
Tariff Sheet Number |
N/A |
Subject |
Revisions to August 2020 Fires Emergency Consumer Protections Summary |
Effective Date |
09/22/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/21/2021 |
Tariff Sheet Number |
37405-37407, 51580-51582 |
Subject |
Addition of Cache Wildfire to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
09/21/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
09/20/2021 |
Tariff Sheet Number |
37401-37402, 51571-51572 |
Subject |
Establish General Office Sale Balancing Accounts and Modify General Office Sale Memorandum Accounts |
Effective Date |
09/20/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/17/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's San Joaquin Valley Disadvantaged Communities Pilot Implementation Plan Amendment to Language |
Effective Date |
09/17/2021 |
Decision Number |
D.18-12-015 |
Advice Number |
Date Filed |
09/17/2021 |
Tariff Sheet Number |
37398-37399, 51558-51559 |
Subject |
Revision to Gas Rule No. 2 and Electric Rule No. 2 |
Effective Date |
01/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/17/2021 |
Tariff Sheet Number |
37395-37396, 51555-51556 |
Subject |
Revisions to Residential Allowances Gas Rule No. 15.H.2 and Electric Rule No. 15.I.2 |
Effective Date |
01/01/2022 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/16/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Revision to Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Multifamily Common Area Measure Program Budgets and Annual Property Treatment Targets for Program Year 2021-2022 [Pursuant to Decision 21-06-015, Ordering Paragraph 148] |
Effective Date |
08/02/2021 |
Decision Number |
D.21-06-015 |
Advice Number |
Date Filed |
09/14/2021 |
Tariff Sheet Number |
37390-37391, 51485-51487 |
Subject |
Supplemental: Revision to the Butte County Mobilehome Park Rebuild Program Agreement (Form 79-1201) for Mobilehome Park Owners/Operators in Butte County Pursuant to Resolution E-5070 and Other Miscellaneous Update |
Effective Date |
09/14/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
09/08/2021 |
Tariff Sheet Number |
37387-37386, 51482-51481 |
Subject |
Revisions to Emergency Consumer Protection Plan for the Dixie, River and Caldor Fires in Compliance with Decision 19-07-015. |
Effective Date |
09/08/2021 |
Decision Number |
D.19-07-15 |
Advice Number |
Date Filed |
09/07/2021 |
Tariff Sheet Number |
N/A |
Subject |
Creek Fire Emergency Consumer Protections Summary |
Effective Date |
09/07/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
09/02/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company, Center for Sustainable Energy, Southern California Edison Company, and Southern California Gas Company's Proposed Modifications to the 2021 Self-Generation Incentive Program Handbook in Compliance with D.21-06-005 |
Effective Date |
12/16/2021 |
Decision Number |
21-06-005 |
Advice Number |
Date Filed |
09/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint IOU Advice Letter Pursuant To Decision 21-06-015 For The Energy Savings Assistance (ESA) Program Design And Delivery Of The Measure Treatment Tiers For Program Years 2022-2026 |
Effective Date |
10/01/2021 |
Decision Number |
D.21-06-015 |
Advice Number |
Date Filed |
08/31/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Statewide Codes and Standards Federal Appliance Standards Advocacy Contract Change Order executed between 2050 Partners, Inc. and PG&E |
Effective Date |
12/21/2021 |
Decision Number |
18-01-004 |
Advice Number |
Date Filed |
08/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Community Based Organization (CBO) Reporting Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision (D.) 21-06-036 Ordering Paragraph (OP) 8 |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/20/2021 |
Tariff Sheet Number |
37340-37350, 51207-51225 |
Subject |
Addition of Antelope, River, McFarland, Monument, and Caldor Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
08/20/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
08/18/2021 |
Tariff Sheet Number |
N/A |
Subject |
August 2020 Fires Emergency Consumer Protections Summary |
Effective Date |
08/18/2021 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
08/09/2021 |
Tariff Sheet Number |
37332-37333, 51179-51180 |
Subject |
Modification to Electric Preliminary Statement Part IA and Gas Preliminary Statement Part FD |
Effective Date |
09/08/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
08/09/2021 |
Tariff Sheet Number |
37326-37329, 51171-51175 |
Subject |
Extension of Specific Measures of PG&E's Emergency Consumer Protection Plan Due to the COVID-19 Pandemic Through September 30, 2021 Pursuant to Decision 21-06-036 and the Addition of Dixie, Fly, and Tamarack Wildfires to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
08/09/2021 |
Decision Number |
D.19-07-015, D.21-06-036 |
Advice Number |
Date Filed |
08/03/2021 |
Tariff Sheet Number |
N/A |
Subject |
Notification of the Creation of a New Affiliate: PG&E Recovery Funding LLC |
Effective Date |
08/03/2021 |
Decision Number |
D.97-12-088, D.98-08-035 and D.06-12-029 |
Advice Number |
Date Filed |
08/02/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Multifamily Common Area Measure Program Budgets and Annual Property Treatment Targets for Program Year 2021-2022 [Pursuant to Decision 21-06-015, Ordering Paragraph 148] |
Effective Date |
Superceded |
Decision Number |
N/A |
Advice Number |
Date Filed |
07/22/2021 |
Tariff Sheet Number |
N/A |
Subject |
Add the San Francisco Marina Safeway Property to the Hazardous Substance Mechanism |
Effective Date |
08/21/2021 |
Decision Number |
D.94-05-020 and D. 96-07-016 |
Advice Number |
Date Filed |
07/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Medium-Large Commercial and Industrial COVID-19 Disconnection Moratorium Quarterly Report, Pursuant to D.21-04-015, Ordering Paragraph 2 |
Effective Date |
07/15/2021 |
Decision Number |
21-04-015 |
Advice Number |
Date Filed |
07/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") - California Energy-Smart Homes Mixed Fuel Residential Program, executed between TRC Solutions, Inc. and PG&E |
Effective Date |
09/15/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
07/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") - California Energy-Smart Homes All Electric Residential Program, executed between TRC Solutions, Inc. and PG&E |
Effective Date |
08/11/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
07/09/2021 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
07/10/2021 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
07/08/2021 |
Tariff Sheet Number |
37278-37279, 50623-50641 |
Subject |
Clean-Up of Gas and Electric Tariffs |
Effective Date |
|
Decision Number |
N/A |
Advice Number |
Date Filed |
07/07/2021 |
Tariff Sheet Number |
37268-37270, 50551-50556 |
Subject |
Addition of January 2021 Wind Events to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015. |
Effective Date |
07/07/2021 |
Decision Number |
D.19-07-015. |
Advice Number |
Date Filed |
06/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Annual Advanced Energy Rebuild Advice Letter in Compliance with Commission Disposition |
Effective Date |
06/30/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
2021 Affiliate Transaction Rules Compliance Plan |
Effective Date |
06/30/2021 |
Decision Number |
D.97-12-088 and D.06-12-029 |
Advice Number |
Date Filed |
06/24/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide State of California Request for Proposal ("RFP") program, executed between Alternative Energy Systems Consulting, Inc and PG&E |
Effective Date |
07/28/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
06/23/2021 |
Tariff Sheet Number |
N/A |
Subject |
Transfer of Residential Uncollectibles from COVID-19 Pandemic Protections Memorandum Accounts (CPPMA) into Residential Uncollectible Balancing Accounts (RUBA) |
Effective Date |
07/23/2021 |
Decision Number |
D. 20-06-003 |
Advice Number |
Date Filed |
06/21/2021 |
Tariff Sheet Number |
37232-37233, 50060-50061 |
Subject |
Revision to the Butte County Mobilehome Park Rebuild Program Agreement (Form 79-1201) for Mobilehome Park Owners/Operators in Butte County Pursuant to Resolution E-5070 and Other Miscellaneous Update |
Effective Date |
09/14/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/17/2021 |
Tariff Sheet Number |
N/A |
Subject |
Add the Ignacio-Alto-Sausalito Structures to the Hazardous Substance Mechanism |
Effective Date |
07/17/2021 |
Decision Number |
D.94-05-020 |
Advice Number |
Date Filed |
06/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
BayREN and PG&E's Joint Cooperation Memo in Compliance with D.18-05-041, Ordering Paragraph 38 for Program Year 2022 |
Effective Date |
07/15/2021 |
Decision Number |
D.18-05-041 |
Advice Number |
Date Filed |
06/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E and MCE's 2022 Joint Cooperation Memo in Compliance with Decision 18-05-041, Ordering Paragraph 38 |
Effective Date |
07/15/2021 |
Decision Number |
D.18-05-041 |
Advice Number |
Date Filed |
06/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
2022 Joint Cooperation Memorandum (JCM) of 3C-REN, SoCalGas, SCE, and PG&E Pursuant to Decision (D.) 18-05-041 |
Effective Date |
07/15/2021 |
Decision Number |
D.18-05-041 |
Advice Number |
Date Filed |
06/11/2021 |
Tariff Sheet Number |
37225-37226, 50036-50037 |
Subject |
General Office Sale Memorandum Account |
Effective Date |
07/11/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/08/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Notification of the Creation of a New Affiliate: PG&E ShareCo LLC |
Effective Date |
05/17/2021 |
Decision Number |
D.97-12-088, D.98-08-035 and D.06-12-029 |
Advice Number |
Date Filed |
06/08/2021 |
Tariff Sheet Number |
N/A |
Subject |
Revised Low Carbon Fuel Standard Credits Sales Plans for Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company |
Effective Date |
07/08/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
06/03/2021 |
Tariff Sheet Number |
37218-37220, 50017-50020 |
Subject |
Additional Emergency Customer Protection Measure Pursuant to Resolution M-4842, Resolution M-4849 and Decision 19-07-015. - Deferring of Rule 15 Contract Compliance Timelines |
Effective Date |
07/06/2021 |
Decision Number |
D.19-07-015 |
Advice Number |
Date Filed |
06/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Request to Recover 2020 Liability Insurance Costs in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005 |
Effective Date |
06/20/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/28/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide Workforce Education and Training Career Connections Request for Proposal ("RFP") Energy is Everything program, executed between The Energy Coalition and PG&E |
Effective Date |
06/25/2021 |
Decision Number |
D.18-08-004 |
Advice Number |
Date Filed |
05/28/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide Workforce Education and Training Career and Workforce Readiness Request for Proposal ("RFP") Energize Careers program, executed between Strategic Energy Innovations and PG&E |
Effective Date |
06/25/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
05/24/2021 |
Tariff Sheet Number |
N/A |
Subject |
Self-Generation Incentive Program (SGIP) 2021-2025 Measurement and Evaluation Plan |
Effective Date |
Superceded |
Decision Number |
19-09-027 |
Advice Number |
Date Filed |
05/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Self-Generation Incentive Program (SGIP) Budget Information per Administrative Law Judge's (ALJ) Ruling dated April 16, 2021 |
Effective Date |
05/19/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
05/17/2021 |
Tariff Sheet Number |
N/A |
Subject |
Notification of the Creation of a New Affiliate: PG&E ShareCo LLC |
Effective Date |
05/17/2021 |
Decision Number |
D.97-12-088, D.98-08-035 and D.06-12-029 |
Advice Number |
Date Filed |
05/14/2021 |
Tariff Sheet Number |
37152-37154, 49764-49767 |
Subject |
Medium and Large Commercial and Industrial COVID-19 Disconnection Moratorium Memorandum Account |
Effective Date |
12/30/2020 |
Decision Number |
D.21-04-015 |
Advice Number |
Date Filed |
05/07/2021 |
Tariff Sheet Number |
N/A |
Subject |
Copy of Request to the Internal Revenue Service in Compliance with 2017 GRC Decision 19-08-023 Ordering Paragraph 6 and 2015 GT&S Decision 19-08-021 Ordering Paragraph 6 |
Effective Date |
05/07/2021 |
Decision Number |
D. 19-08-023, 19-08-021 |
Advice Number |
Date Filed |
05/03/2021 |
Tariff Sheet Number |
37142-37146, 49737-49741 |
Subject |
Pacific Gas and Electric Company's Proposed Modifications to Medical Baseline Program Self-Certification Request Form (Form 61-0502) and Medical Baseline Program Application (Form 62-3481) |
Effective Date |
07/01/2021 |
Decision Number |
D.20-06-003 |
Advice Number |
Date Filed |
04/30/2021 |
Tariff Sheet Number |
37134-37137, 49728-49735 |
Subject |
Revised Household Income Requirements for California Alternate Rates for Energy (CARE) and Family Electric Rate Assistance (FERA) Programs and Modification of Applicable Forms |
Effective Date |
06/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Tier 1 Advice Letter re Executive Compensation |
Effective Date |
03/17/2022 |
Decision Number |
D.20-05-053 |
Advice Number |
Date Filed |
04/29/2021 |
Tariff Sheet Number |
N/A |
Subject |
Tier 2 Advice Letter Regarding Nominees for Customer Credit Trust Management Committee |
Effective Date |
05/20/2021 |
Decision Number |
D.21-04-030 |
Advice Number |
Date Filed |
04/27/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: PG&E's COVID-19 Emergency Customer Protections Transition Plan, Pursuant to Resolution M-4849, Ordering Paragraph 5 |
Effective Date |
04/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/16/2021 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
04/16/2021 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
04/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Report Documenting Its Energy Savings Assistance Program Bridge Funding and Retreatment Interim Progress Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2 and Decision 19-06-022, Ordering Paragraph 4] |
Effective Date |
04/15/2021 |
Decision Number |
D.19-06-022 |
Advice Number |
Date Filed |
04/13/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Revisions to the Self-Generation Incentive Program Handbook to Clarify Requirements for Multifamily Applications to Remove Ambiguity as to How Multifamily Properties are Classified for Purposes of Greenhouse Gas Emissions Reduction Requirements, Operational Requirements, and Incentive Payment Structure and to Replace "Food Bank" with "Emergency Feeding Organization" |
Effective Date |
05/13/2021 |
Decision Number |
D.21-03-002 |
Advice Number |
Date Filed |
04/09/2021 |
Tariff Sheet Number |
N/A |
Subject |
Tier 1 Advice Letter re Executive Compensation |
Effective Date |
03/17/2022 |
Decision Number |
D.20-05-053 |
Advice Number |
Date Filed |
04/02/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Request to Shift Funds in the Energy Saving Assistance Program |
Effective Date |
Withdrawn |
Decision Number |
08-11-031, as modified by D.10-10-008, D.16-11-022 |
Advice Number |
Date Filed |
04/01/2021 |
Tariff Sheet Number |
37071-37072, 49317-49318 |
Subject |
PG&E's COVID-19 Emergency Customer Protections Transition Plan, Pursuant to Resolution M-4849, Ordering Paragraph 5 |
Effective Date |
04/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
04/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Annual Report for Relocation Work Performed for the California High-Speed Rail Authority (CHSRA), in Compliance with Resolution G-3498 |
Effective Date |
05/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/30/2021 |
Tariff Sheet Number |
N/A |
Subject |
Annual Update regarding Pacific Gas and Electric Company's Climate Vulnerability Assessment |
Effective Date |
03/31/2021 |
Decision Number |
D.20-08-046 |
Advice Number |
Date Filed |
03/29/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Pension-Related Revenue Requirement for 2021 |
Effective Date |
03/29/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/29/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP"), Continuous Energy Feedback Program (CEFP) program, executed between Oracle America Inc. and PG&E |
Effective Date |
04/28/2021 |
Decision Number |
D. 18-01-004 |
Advice Number |
Date Filed |
03/24/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Modifications to the Self-Generation Incentive Program (SGIP) Handbook to Implement the Stay on Cancellation of Projects Past their Third Six-Month Extension Due to Issues Related to the COVID-19 Pandemic Pursuant to Decision (D.) 21-03-009 |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/24/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Modifications to the Self-Generation Incentive Program (SGIP) Handbook to Implement Pause on Performance-Based Incentive (PBI) Calculations Due to the COVID-19 Pandemic Pursuant to Decision (D.) 21-03-008 |
Effective Date |
03/24/2021 |
Decision Number |
21-03-008 |
Advice Number |
Date Filed |
03/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's Summary of Customer Protections Offered in Response to the COVID-19 Pandemic, Pursuant to D.19-07-015, OP 6 |
Effective Date |
03/18/2021 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
03/16/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposal for Self-Generation Incentive Program (SGIP) Residential Price Cap in Accordance with Decision 19-09-027, Ordering Paragraphs 7(g) and 8(a). |
Effective Date |
Rejected |
Decision Number |
D.19-09-027 |
Advice Number |
Date Filed |
03/15/2021 |
Tariff Sheet Number |
37007-37008, 49244-49246 |
Subject |
Tier 3 Advice Letter Regarding an Independent Safety Monitor |
Effective Date |
08/05/2021 |
Decision Number |
D.20-05-053 |
Advice Number |
Date Filed |
03/15/2021 |
Tariff Sheet Number |
N/A |
Subject |
Self-Generation Incentive Plan (SGIP) Residential Equity Resiliency Marketing Plan and Implementation Strategy |
Effective Date |
Rejected |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Grant of Easement to Alameda County Flood Control and Water Conservation District for a Multi-Purpose Public Pedestrian Path - Request for Approval Under Section 851 and General Order 173 |
Effective Date |
04/11/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/09/2021 |
Tariff Sheet Number |
37006-37002, 49240-49243 |
Subject |
Supplemental: Addition of Privacy Statement Pursuant to the California Consumer Privacy Act and other Updates to PG&E's Gas and Electric Sample Forms |
Effective Date |
02/04/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
03/05/2021 |
Tariff Sheet Number |
N/A |
Subject |
Modifications to the Pacific Gas and Electric Company's On-Bill Financing (OBF) Loan Program Pursuant to D.19-03-001. |
Effective Date |
04/04/2021 |
Decision Number |
D.19-03-001 |
Advice Number |
Date Filed |
03/04/2021 |
Tariff Sheet Number |
N/A |
Subject |
Compliance with Decision 20-12-005 Ordering Paragraph 13 for Customer Deposits |
Effective Date |
04/03/2021 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
03/03/2021 |
Tariff Sheet Number |
N/A |
Subject |
Add the Rancho Capay Meter Station Site to the Hazardous Substance Mechanism |
Effective Date |
04/02/2021 |
Decision Number |
94-05-020 |
Advice Number |
Date Filed |
02/23/2021 |
Tariff Sheet Number |
N/A, 48876-48877 |
Subject |
Vegetation Management Balancing Account and Wildfire Mitigation Balancing Account Revenue Requirement True Up Per Decision 20-12-005 Ordering Paragraphs 8 and 9 |
Effective Date |
03/25/2021 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
02/22/2021 |
Tariff Sheet Number |
36964-36967, 48745-48750 |
Subject |
Extension of Pacific Gas and Electric Company's Emergency Consumer Protection Plan to Support Customers During the COVID 19 Pandemic Pursuant to Resolution M-4849 |
Effective Date |
Effective Pending Final Disposition |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/19/2021 |
Tariff Sheet Number |
36926-36927, 48732-48733 |
Subject |
Establish the Regionalization Plan Memorandum Account (RPMA) to Record Costs Incurred Implementing regionalization as proposed in Application (A.) 20-06-011. |
Effective Date |
02/19/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") Non-Residential, Mixed Fuel - California New Construction program, executed between Willdan Energy Solutions and PG&E |
Effective Date |
04/28/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
02/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Statewide New Construction Request for Proposal ("RFP") Non-Residential, All Electric - California New Construction program, executed between Willdan Energy Solutions and PG&E |
Effective Date |
04/28/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
02/16/2021 |
Tariff Sheet Number |
36923-36924, 48728-48729 |
Subject |
Addition of January 2021 Winter Storms to the Emergency Consumer Protection Plan in Compliance with Decision 19-07-015 |
Effective Date |
02/16/2021 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
02/05/2021 |
Tariff Sheet Number |
36909-36912, 48720-48726 |
Subject |
Implement Tariff Changes in Compliance with the 2020 General Rate Case (GRC) Decision (D.) 20-12-005 |
Effective Date |
01/01/2020 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
02/04/2021 |
Tariff Sheet Number |
36829-36902, 48543-48711 |
Subject |
Addition of Privacy Statement Pursuant to the California Consumer Privacy Act and other Updates to PG&E's Gas and Electric Sample Forms |
Effective Date |
02/04/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/03/2021 |
Tariff Sheet Number |
36820-36824, 48536-48537 |
Subject |
Clean-Up of Gas and Electric Tariffs |
Effective Date |
02/03/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Joint Tier 1 Advice Letter to Fund the School Energy Efficiency Stimulus Program in Compliance with Decision 21-01-004 |
Effective Date |
02/01/2021 |
Decision Number |
D.21-01-004 |
Advice Number |
Date Filed |
02/01/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Summarizing PG&E's 2021 Energy Efficiency Budget Recovery Request for San Francisco Bay Area Regional Energy Network, Tri-County Regional Energy Network, and Marin Clean Energy in Alignment with PG&E's 2021 Energy Efficiency Annual Budget Advice Letter. |
Effective Date |
02/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
02/01/2021 |
Tariff Sheet Number |
36816-36817, 48514-48515 |
Subject |
Advice Letter Summarizing Establishment of Balancing Accounts to Record Funding Amounts Allocated to the School Energy Efficiency Stimulus Program in Compliance with Decision 21-01-004. |
Effective Date |
02/01/2021 |
Decision Number |
D. 21-01-004 |
Advice Number |
Date Filed |
01/26/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Revision to January 1, 2021 - June 30, 2021 Energy Savings Assistance Program Bridge Funding and Retreatment Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2] |
Effective Date |
12/24/2020 |
Decision Number |
D.19-06-022 |
Advice Number |
Date Filed |
01/25/2021 |
Tariff Sheet Number |
N/A |
Subject |
PG&E's 2021 Base Revenue Requirements Effective January 1, 2021 |
Effective Date |
01/01/2021 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/22/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Revision to January 1, 2021 - June 30, 2021 Energy Savings Assistance Program Bridge Funding and Retreatment Goals [Pursuant to GO 96-B, Energy Industry Rules, Section 5.2.2] |
Effective Date |
Superceded |
Decision Number |
D.19-06-022 |
Advice Number |
Date Filed |
01/22/2021 |
Tariff Sheet Number |
36780-36781, 48370-48371 |
Subject |
Pacific Gas and Electric Company's Revisions to Electric and Gas Rule 19 to Update the End Date for Medical Baseline Customer Protections |
Effective Date |
01/22/2021 |
Decision Number |
19-07-015 |
Advice Number |
Date Filed |
01/22/2021 |
Tariff Sheet Number |
N/A |
Subject |
Supplemental: Pacific Gas and Electric Company's Plan to Implement Senate Bill 1338's Requirements in Support of the Medical Baseline Program, Pursuant to D.20-06-003, Ordering Paragraphs 39-41 |
Effective Date |
09/23/2021 |
Decision Number |
20-06-003 |
Advice Number |
Date Filed |
01/19/2021 |
Tariff Sheet Number |
N/A |
Subject |
Return to Ratepayers of Excess Accumulated Deferred Income Taxes Pursuant to the 2017 Tax Act |
Effective Date |
02/18/2021 |
Decision Number |
D. 20-12-005 |
Advice Number |
Date Filed |
01/13/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") NetOne program, executed between Ecology Action and PG&E |
Effective Date |
02/12/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
01/13/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") Healthcare Energy Fitness Initiative program, executed between Nexant and PG&E. |
Effective Date |
02/12/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
01/13/2021 |
Tariff Sheet Number |
N/A |
Subject |
Advice Letter Submittal of Pacific Gas and Electric Company's Third-Party Solicitations resulting from its Local Multi-Sector Request for Proposal ("RFP") Advanced Energy program, executed between Nexant and PG&E |
Effective Date |
02/12/2021 |
Decision Number |
D.18-01-004 |
Advice Number |
Date Filed |
01/13/2021 |
Tariff Sheet Number |
36752-36754, 48303-48306 |
Subject |
Supplemental: Establishment of Residential Uncollectibles Balancing Accounts (RUBA) in Compliance with Decision 20-06-003. |
Effective Date |
06/11/2020 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Quarterly Notice on the Energy Data Request and Release Process, Per Decision 14-05-016 |
Effective Date |
01/12/2021 |
Decision Number |
D.14-05-016 |
Advice Number |
Date Filed |
01/12/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Proposal to Implement an On-Bill Financing Resiliency Pilot for K-12 Schools |
Effective Date |
Withdrawn |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/08/2021 |
Tariff Sheet Number |
36747-36748, 48273-48287 |
Subject |
Second Supplemental: Clean-Up of Gas and Electric Tariffs |
Effective Date |
08/18/2020 |
Decision Number |
N/A |
Advice Number |
Date Filed |
01/07/2021 |
Tariff Sheet Number |
N/A |
Subject |
Pacific Gas and Electric Company's Plan to Close 10 Customer Service Offices Pursuant to D. 20-12-005 |
Effective Date |
01/07/2021 |
Decision Number |
D.20-12-005 |
Advice Number |
Date Filed |
01/04/2021 |
Tariff Sheet Number |
N/A |
Subject |
Proposed Dynamic Methodology for Large Thermal Energy Storage Incentive Calculations and Updates to the Self-Generation Incentive Program (SGIP) Handbook in Compliance with Ordering Paragraphs 2 and 3 of Resolution E-5106 |
Effective Date |
07/13/2021 |
Decision Number |
N/A |