Baja Path On System

Rates Effective October 1, 2019 This link will open in a new window
Rates Effective January 1, 2019 This link will open in a new window

Kern River Station, High Desert Lateral, Daggett, Southern Trails or Topock Receipt Points2020 Annual Rates
Effective January 1, 2020
Rate Schedule
Reservation RateUsage RateTotal*
($/Dth/month)($/Dth)($/Dth @ full contract)
Annual Firm
One year minimum term
G-AFT
Rates (MFV)17.92700.20670.7961
Rates (SFV)24.09350.00400.7961
Seasonal Firm
Three consecutive months in one season minimum term
Two consecutive years maximum term
Winter season: November through March
Summer season: April through October
G-SFT
Rates (MFV)21.51240.24810.9553
Rates (SFV)28.91220.00480.9553
Negotiated Firm
Term, take and rate are negotiable
Rates are capped at 120% of Annual Firm MFV rates in Schedule G-AFT
G-NFT
As-Available
One day minimum term
Volumetric rates
0.9553G-AA
Negotiated As-Available
Term, take and rate are negotiable
Rates are capped at 120% of As-Available rates in Schedule G-AA
G-NAA

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

To arrange for the further transportation and delivery of natural gas to an Off-System Delivery Point, one of the following additional rate schedules must be utilized: G-NFTOFF, G-NAAOFF, G-AFTOFF or G-AAOFF.

* Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.