Operating Data | Pipeline Maintenance

Pipeline Maintenance News

As of Wednesday, November 14, 2018

(Any day not shown is at 100% capacity)


Redwood Path Maintenance
Dates
Capacity
(MMcf/d)
Maintenance Notes
November 14
2050
L-401 Pipeline Maintenance
Delevan Station Maintenance
November 15 - 16
2080
L-401 Pipeline Maintenance
November 18
2210
Gerber Station Maintenance
November 19 - 20
2100
Gerber Station Maintenance
November 21
2210
Burney Station Maintenance
November 27
2080
Delevan Station Maintenance
Burney Station Maintenance
November 28
1950
Delevan Station Maintenance
Burney Station Maintenance
November 29
1980
Delevan Station Maintenance
Burney Station Maintenance
November 30
2010
Burney Station Maintenance
November Max Capacity: 2260
View Max Capacities for All Months
Baja Path Maintenance
Dates
Capacity(MMcf/d)
Maintenance Notes
Kettleman Hinkley Topock
November 14 - 20
550
350
780
L-300A/B Pipeline Maintenance
L-300A/B Station Maintenance
November 21 - 27
610
410
410
L-300A/B Pipeline Maintenance
L-300A/B Station Maintenance
November 28
610
410
330
L-300A Pipeline Maintenance
L-300A/B Station Maintenance
Topock Station Maintenance
November 29 - 30
610
410
410
L-300A Pipeline Maintenance
L-300A/B Station Maintenance
November Max Capacity: 1089
View Max Capacities for All Months

Limitations at Specific Interconnect Points:

Redwood Path
Dates Capacity
(MMcf/d)
Maintenance Notes
Baja Path
Dates Capacity
(MMcf/d)
Maintenance Notes

Physical Pipeline Capacity shows daily physical capacity at the various interconnections to CGT. Pipeline Maintenance News details maintenance events on CGT's backbone transmission pipelines and the corresponding forecast capacity reductions on the Redwood and Baja paths.

Download Pipeline Maintenance History

and preceding Days In Excel

Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018.

Prospective Maintenance Document

Last revised: October 16, 2018

Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.