Operating Data | Pipeline Maintenance

Pipeline Maintenance News

As of Friday, June 24, 2022

Redwood Path Maintenance
Dates
Capacity
(MMcf/d)
Maintenance Notes
June 24 - 30
1620
Buckeye Station Maintenance
Redwood Pipeline Maintenance
July 01 - 04
2000
Buckeye Station Maintenance
July 05 - 06
1990
Buckeye Station Maintenance
Redwood Pipeline Maintenance
July 07 - 10
2000
Buckeye Station Maintenance
July 11 - 12
1990
Buckeye Station Maintenance
Redwood Pipeline Maintenance
July 13
1820
Buckeye Station Maintenance
Redwood Pipeline Maintenance
July 14 - 31
2000
Buckeye Station Maintenance
June Max Capacity: 2190
July Max Capacity: 2170
View Max Capacities for All Months
Baja Path Maintenance
Dates
Capacity(MMcf/d)
Maintenance Notes
Kettleman Hinkley Topock
June 24 - 27
400
715
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
June 28 - 29
400
650
600
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
Topock Station Maintenance
June 30
400
715
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 01 - 17
375
715
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 18
325
715
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 19
325
674
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 20
300
674
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 21 - 22
325
674
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 23
375
674
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
July 24 - 31
375
715
945
L-300A Pipeline Maintenance
L-300B Pipeline Maintenance
June Max Capacity: 975
July Max Capacity: 975
View Max Capacities for All Months

Limitations at Specific Interconnect Points:

Redwood Path
Dates Capacity
(MMcf/d)
Maintenance Notes
June 24 - 300Net withdrawal from Wild Goose storage facility
June 24 - 300Net withdrawal from Central Valley storage facility
Baja Path
Dates Capacity
(MMcf/d)
Maintenance Notes

Physical Pipeline Capacity shows daily physical capacity at the various interconnections to CGT. Pipeline Maintenance News details maintenance events on CGT's backbone transmission pipelines and the corresponding forecast capacity reductions on the Redwood and Baja paths.

Storage Maintenance:

Injection
Dates Available Injection
(MMcf/d)
Maintenance Notes
July 05 - 1890Due to planned ILI work affecting McDonald Island the limited available injection during this period may impact firm injection, including pipeline balancing services. Available Injection: 100-90 MMcf/d
July 19239Due to planned ILI work affecting McDonald Island the limited available injection during this period may impact firm injection, including pipeline balancing services.
Withdrawal
Dates Available Withdrawal
(MMcf/d)
Maintenance Notes
July 05 - 20105Due to planned ILI work affecting McDonald Island the limited available withdrawal during this period may impact pipeline balancing services. Available Withdrawal: 140-105 MMcf/d

Download Pipeline Maintenance History

and preceding Days In Excel

Maintenance will not appear in the archive until after it's been removed from the Operating Data | Pipeline Maintenance page above. You can download Redwood and Baja pipeline maintenance information as far back as November 1, 2016. You can download Limitations at Specific Interconnect Point information as far back as March 21, 2018. You can download Storage Maintenance information as far back as December 11, 2020.

Prospective Maintenance Document

Last revised: June 17, 2022

Download our Prospective Maintenance document for a 6-12 month outlook of proposed maintenance on the CGT pipeline system. Note that this document is revised monthly and is offered in addition to our existing month-out Pipeline Maintenance information listed above.