Plan 1
Posted on Pipe Ranger at approximately 8:00 a.m. Pacific time, and is based on:
Note: Please be aware that Intraday for current day, Timely and Evening cycle volumes for next day are not available when this plan is prepared. Additionally, Plan 1 does not reflect the anticipated results of an OFO that may be called as a result of the forecasts contained in this plan.
Plan 2
Posted on Pipe Ranger at approximately 1:00 p.m. Pacific time, and is based on:
Note: If an OFO was called today for tomorrow's gas day, this plan will reflect actual and anticipated customer adjustments in supply. At this point, CGT determines if it is necessary to hold nominations to a previous cycle due to high inventory.
Plan 3
Posted on Pipe Ranger at approximately 4:30 p.m. Pacific time, and is based on:
Plan 4
Posted on Pipe Ranger at approximately 11:00 p.m. Pacific time, and is based on:
Plan 5
Posted on Pipe Ranger at approximately 5:30 a.m. Pacific time, and is based on prior plans and observed trends during the night.
Note: PG&E can experience significant changes in supply after Plan 5 that may trigger calling an OFO in
Plan 1.