News

Storage Inventory Verification Period and Storage Maintenance

Monday, November 06, 2017

Updated:

The storage maintenance has been extended through November 14, 2017. Due to the extended outage at PG&E’s storage facilities, California Gas Transmission pipeline balancing services could be limited and firm storage services may be impacted on November 11th and 12th, 2017.

---Original Message 10/20/2017 08:44 a.m ----

From November 1 through November 8, 2017, CGT will be conducting an inventory verification process at its storage fields along with other maintenance. Although this work will have an impact on both injections and withdrawals during this time period, it is our expectation that both injection capacity and withdrawal capacity will meet expected demand.

If you need to view each day’s maximum storage injection and/or withdrawal capacity, our PG&E Supply and Demand Forecast (Net Physical Flows) page on Pipe Ranger is a great resource.

Please feel free to contact your CGT Sales Representative if you have any questions.

Related Links