News

Redwood Path Allocation Process Refresher

Friday, April 10, 2015

As-available Redwood path supplies flowing from Malin (Gas Transmission Northwest) and Onyx Hill (Ruby Pipeline), and net withdrawals flowing on Mission path as-available transportation from Wild Goose Storage, Lodi Gas Storage, and Central Valley Gas Storage (the northern Independent Storage Providers) all compete for the same as-available pipeline space on the Line 400/401 system.

Currently, California Gas Transmission is seeing high flowing supply at Malin and Onyx Hill and high net storage withdrawals from the northern Independent Storage Providers.  When total confirmed volumes from these sources exceed the capacity of the Line 400/401 system, CGT evaluates if a Redwood Allocation is necessary.  

Although a Redwood Allocation is not currently called, we wanted to bring your attention to the Redwood Allocation educational article which we published last spring.   Please take a moment to review this information and reach out to your CGT Sales  Representative with questions.

Related Links