Updated: Effective November 1, California Gas Transmission's in-kind shrinkage rates have been approved as filed. In preparing for bid week, please keep in mind that new shrinkage rates apply, as stated in this article.
--- Original Message 9/22/2011; 8:20 a.m. ---
PG&E filed Advice 3236-G with the California Public Utilities Commission on September 21, 2011, to revise its in-kind shrinkage rates. PG&E is requesting notice of this advice letter approval by October 21, 2011, with changes to gas Rule 21
(Transportation of Natural Gas) to be effective November 1, 2011.
In this advice filing, PG&E proposes to update the base shrinkage allowances to reflect the current shrinkage forecast data for 2012 and, additionally, to eliminate a temporary in-kind shrinkage credit adjustment. Final approval of these rates or updates to this information will be posted on Pipe Ranger as it is received.
Current Total Allowance | Proposed Total Allowance | Proposed Change | |
Transmission - Redwood to Off-System | 0.9% | 0.9% | -- |
Transmission - Mission to On/Off-System | 0.0% | 0.0% | -- |
Transmission - All Other Backbone Paths | 0.8% | 1.0% | +0.2% |
Distribution - Noncore | 0.2% | 0.2% | -- |
Distribution - Core Summer Season (April-October) |
0.9% | 1.7% | +0.8% |
Distribution - Core Winter Season (November-March) |
1.6% | 2.9% | +1.3% |