News

Alert - Possible Constraint and Path Limits

Friday, September 18, 2009

This is an alert. PG&E is experiencing high system inventory for gas day September 19, 2009. If additional volumes are nominated in the Intraday 2 cycle, PG&E may hold interconnect constraints and path limits to Intraday 1 cycle scheduled volumes for gas day September 18.

Watch Pipe Ranger for updates if constraint and path limits are implemented.

If you have any questions, please contact the California Gas Transmission Helpline at 1.800.343.4743 and press 2 for Scheduling assistance.