For your security, you will be logged out of your session in 5 minutes.
For your security, you have been logged out of your session due to inactivity.
The information on this page helps describe the process for building and renovation services.
Review our getting started guides to learn more about project requirements. Visit Building and Renovation Services - Getting Started Guides.
Submit your application for service anytime, 24 hours a day, 7 days a week. Visit "Your Projects."
Your PG&E representative will contact you within three business days to discuss project details.
An applicant designer can design your project or we can. Learn more about the responsibilities of the applicant designer. Visit Applicant Design and Installation Responsibilities. After the design is prepared, PG&E mails the project proposal for your approval.
If you’re installing or upgrading underground lines, your PG&E representative can provide drawings for trenches or other structures.
Schedule gas and/or electric construction crew work with your PG&E representative.
Ensure that you call 811 before any trenching. If you hired your own contractor for trenching, get familiar with our requirement. Download Electric & Gas Service Requirements (PDF, 5.3 MB). Then, arrange for inspection with your PG&E representative.
Work with your contractor to install your electrical panel or stub out the gas houseline. Refer to our requirements page. Visit Electric and Gas Service Requirements.
You or your contractor must be on-site when we install gas and pulls electric wires into conduit.
Arrange for the appropriate local government agency to inspect your electric panel and/or gas houseline. Use our online permit office locator tool. Visit Permit Office Locator.
Find out from your PG&E representative when we will install your meter. Understand the stages of SmartMeter™ technology. Visit Getting Your SmartMeter™ Device.
When your inspections are complete and after we install your meter, we can turn on your electric and/or gas service.
Get a full copy of our guide. Download Building and Renovation Process (PDF, 94 KB).
For a disconnect that requires immediate attention due to a hazardous situation or if electrical repairs are needed please call 1-877-743-7782. Please be advised that an application may be required before services can be reconnected.
PLEASE NOTE: After you apply for gas or electric service, we assign a representative to you. Your representative helps you through each step of the process including: