Search

Silverado Path On System

2011 Rates This link will open in a new window
2010 Rates This link will open in a new window

PG&E interconnections with California gas production in PG&E's service territory2011 Annual Rates
Effective May 1, 2011
Rate Schedule
Reservation RateUsage RateTotal*
($/Dth/month)($/Dth)($/Dth @ full contract)
Annual Firm
One year minimum term
 G-AFT
Rates (MFV)3.26790.05540.1628
Rates (SFV)4.80560.00490.1628
Seasonal Firm
Three consecutive months in one season minimum term
Two consecutive years maximum term
Winter season: November through March
Summer season: April through October
G-SFT
Rates (MFV)3.92150.06650.1954
Rates (SFV)5.76670.00580.1954
Negotiated Firm
Term, take and rate are negotiable
Rates are capped at 120% of Annual Firm MFV rates in Schedule G-AFT
G-AFT
As-Available
One day minimum term
Volumetric rates
0.1954G-AA
Negotiated As-Available
Term, take and rate are negotiable
Rates are capped at 120% of As-Available rates in Schedule G-AA
 G-AFT

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

To arrange for the further transportation and delivery of natural gas to an Off-System Delivery Point, one of the following additional rate schedules must be utilized: G-NFTOFF, G-NAAOFF, G-AFTOFF or G-AAOFF.

* Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.