Annual Rates, Schedule G-SFT

Baja to On-System Core

MFV Rate Design
  2011 Jan 1 - Apr 30 2011 May 1 - Dec 31 2012 2013 Jan 1 - Mar 31 2013 Apr 1 - Dec 31 2014
Baja to On-System Core
Reservation Charge ($/Dth/mo)
n/a
6.3373
6.3460
6.1634
6.2731
6.4159
Usage Charge ($/Dth)
n/a
0.0910
0.0941
0.0936
0.0952
0.0997
Total ($/Dth @ Full Contract)
n/a
0.2993
0.3027
0.2963
0.3015
0.3106
 
SFV Rate Design
  2011 Jan 1 - Apr 30 2011 May 1 - Dec 31 2012 2013 Jan 1 - Mar 31 2013 Apr 1 - Dec 31 2014
Baja to On-System Core
Reservation Charge ($/Dth/mo)
n/a
8.6999
8.8204
8.6438
8.7976
9.0680
Usage Charge ($/Dth)
n/a
0.0133
0.0127
0.0121
0.0122
0.0125
Total ($/Dth @ Full Contract)
n/a
0.2993
0.3027
0.2963
0.3015
0.3106

Notes:

Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.


Copyright © 2009 Pacific Gas and Electric Company.
All rights reserved.