Annual Rates, Schedule G-SFT
Baja to On-System Core
| MFV Rate Design | |||||
| 2011 Jan 1 - Apr 30 | 2011 May 1 - Dec 31 | 2012 | 2013 Jan 1 - Mar 31 | 2013 Apr 1 - Dec 31 | |
|---|---|---|---|---|---|
| Baja to On-System Core | |||||
| Reservation Charge ($/Dth/mo) | n/a |
6.3373 |
6.3460 |
6.1634 |
6.2731 |
| Usage Charge ($/Dth) | n/a |
0.0910 |
0.0941 |
0.0936 |
0.0952 |
| Total ($/Dth @ Full Contract) | n/a |
0.2993 |
0.3027 |
0.2963 |
0.3015 |
| SFV Rate Design | |||||
| 2011 Jan 1 - Apr 30 | 2011 May 1 - Dec 31 | 2012 | 2013 Jan 1 - Mar 31 | 2013 Apr 1 - Dec 31 | |
| Baja to On-System Core | |||||
| Reservation Charge ($/Dth/mo) | n/a |
8.6999 |
8.8204 |
8.6438 |
8.7976 |
| Usage Charge ($/Dth) | n/a |
0.0133 |
0.0127 |
0.0121 |
0.0122 |
| Total ($/Dth @ Full Contract) | n/a |
0.2993 |
0.3027 |
0.2963 |
0.3015 |
Notes:
Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.
To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.
All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.