Search Pipe Ranger

Annual Rates
Schedule G-SFT

Seasonal Firm Backbone Charges for On-System Deliveries

Archived Rates This link will open in a new window

MFV Rate Design
 2011 Jan 1 - Apr 302011 May 1 - Dec 312012
Redwood to On-System
Reservation Charge ($/Dth/mo)
6.0840
6.4905
6.5491
Usage Charge ($/Dth)
0.1528
0.1245
0.1238
Total ($/Dth @ Full Contract)
0.3528
0.3379
0.3391
Baja to On-System
Reservation Charge ($/Dth/mo)
8.4044
7.0717
7.2502
Usage Charge ($/Dth)
0.1063
0.1354
0.1368
Total ($/Dth @ Full Contract)
0.3826
0.3679
0.3752
Silverado and Mission to On-System
Reservation Charge ($/Dth/mo)
3.7008
3.9215
3.7967
Usage Charge ($/Dth)
0.0622
0.0665
0.0654
Total ($/Dth @ Full Contract)
0.1839
0.1954
0.1902
 
SFV Rate Design
 2011 Jan 1 - Apr 302011 May 1 - Dec 312012
Redwood to On-System
Reservation Charge ($/Dth/mo)
10.4795
9.9714
10.0125
Usage Charge ($/Dth)
0.0082
0.0101
0.0100
Total ($/Dth @ Full Contract)
0.3527
0.3379
0.3391
Baja to On-System
Reservation Charge ($/Dth/mo)
11.0784
10.8643
11.0843
Usage Charge ($/Dth)
0.0183
0.0107
0.0107
Total ($/Dth @ Full Contract)
0.3825
0.3679
0.3752
Silverado and Mission to On-System
Reservation Charge ($/Dth/mo)
5.3794
5.7667
5.5695
Usage Charge ($/Dth)
0.0071
0.0058
0.0071
Total ($/Dth @ Full Contract)
0.1840
0.1954
0.1902

Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.


Copyright © 2009 Pacific Gas and Electric Company.
All rights reserved.