Kern River Station, High Desert Lateral, Daggett, Southern Trails or Topock Receipt Points2009 Annual Rates
Effective January 1, 2009
Rate Schedule
Reservation RateUsage RateTotal*
($/Dth/month)($/Dth)($/Dth @ full contract)
Annual Firm
One year minimum term
 G-AFT
Rates (MFV)7.07450.08940.3220
Rates (SFV)9.32530.01540.3220
Seasonal Firm
Three consecutive months in one season minimum term
Two consecutive years maximum term
Winter season: November through March
Summer season: April through October
G-SFT
Rates (MFV)8.48940.10730.3864
Rates (SFV)11.19040.01850.3864
Negotiated Firm
Term, take and rate are negotiable
Rates are capped at 120% of Annual Firm MFV rates in Schedule G-AFT
G-NFT
As-Available
One day minimum term
Volumetric rates
0.3864G-AA
Negotiated As-Available
Term, take and rate are negotiable
Rates are capped at 120% of As-Available rates in Schedule G-AA
 G-NAA

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

To arrange for the further transportation and delivery of natural gas to an Off-System Delivery Point, one of the following additional rate schedules must be utilized: G-NFTOFF, G-NAAOFF, G-AFTOFF or G-AAOFF.

*Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.