Search Pipe Ranger

Baja Path On System

2007 Rates This link will open in a new window
2006 Rates This link will open in a new window

Kern River Station, High Desert Lateral, Daggett, Southern Trails or Topock Receipt Points2008 Annual Rates
Effective January 1, 2008
Rate Schedule
Reservation RateUsage RateTotal*
($/Dth/month)($/Dth)($/Dth @ full contract)
Annual Firm
One year minimum term
 G-AFT
Rates (MFV)7.14530.09030.3252
Rates (SFV)9.41870.01550.3252
Seasonal Firm
Three consecutive months in one season minimum term
Two consecutive years maximum term
Winter season: November through March
Summer season: April through October
G-SFT
Rates (MFV)8.57440.10830.3902
Rates (SFV)11.30240.01870.3902
Negotiated Firm
Term, take and rate are negotiable
Rates are capped at 120% of Annual Firm MFV rates in Schedule G-AFT
G-NFT
As-Available
One day minimum term
Volumetric rates
0.3902G-AA
Negotiated As-Available
Term, take and rate are negotiable
Rates are capped at 120% of As-Available rates in Schedule G-AA
 G-NAA

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

To arrange for the further transportation and delivery of natural gas to an Off-System Delivery Point, one of the following additional rate schedules must be utilized: G-NFTOFF, G-NAAOFF, G-AFTOFF or G-AAOFF.

*Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.


Copyright © 2007 Pacific Gas and Electric Company.
All rights reserved.