Search Pipe Ranger

Annual Rates
Schedule G-AFTOFF

Annual Firm Backbone Charges for Off-System Deliveries

Archived Rates This link will open in a new window

MFV Rate Design
 2011 Jan 1 - Apr 302011 May 1 - Dec 312012
Redwood to Off-System
Reservation Charge ($/Dth/mo)
5.0700
5.4087
5.4576
Usage Charge ($/Dth)
0.1274
0.1038
0.1032
Total ($/Dth @ Full Contract)
0.2941
0.2816
0.2826
Baja to Off-System
Reservation Charge ($/Dth/mo)
7.0037
5.8930
6.0418
Usage Charge ($/Dth)
0.0885
0.1129
0.1140
Total ($/Dth @ Full Contract)
0.3188
0.3066
0.3126
Silverado and Mission to Off-System
Reservation Charge ($/Dth/mo)
5.0700
5.4087
5.4576
Usage Charge ($/Dth)
0.1274
0.1038
0.1032
Total ($/Dth @ Full Contract)
0.2941
0.2816
0.2826
 
SFV Rate Design
 2011 Jan 1 - Apr 302011 May 1 - Dec 312012
Redwood to Off-System
Reservation Charge ($/Dth/mo)
8.7329
8.3095
8.3437
Usage Charge ($/Dth)
0.0070
0.0084
0.0083
Total ($/Dth @ Full Contract)
0.2941
0.2816
0.2826
Baja to Off-System
Reservation Charge ($/Dth/mo)
9.2319
9.0536
9.2370
Usage Charge ($/Dth)
0.0153
0.0089
0.0089
Total ($/Dth @ Full Contract)
0.3188
0.3066
0.3126
Silverado and Mission to Off-System
Reservation Charge ($/Dth/mo)
8.7329
8.3095
8.3437
Usage Charge ($/Dth)
0.0070
0.0084
0.0083
Total ($/Dth @ Full Contract)
0.2941
0.2816
0.2826

Notes:

Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.

All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.


Copyright © 2009 Pacific Gas and Electric Company.
All rights reserved.