Annual Rates, Schedule G-AFT

Baja to On-System Core

MFV Rate Design
  2011 Jan 1 - Apr 30 2011 May 1 - Dec 31 2012 2013 Jan 1 - Mar 31 2013 Apr 1 - Dec 31 2014
Baja to On-System Core
Reservation Charge ($/Dth/mo)
n/a
5.2811
5.2883
5.1362
5.2276
5.3466
Usage Charge ($/Dth)
n/a
0.0758
0.0784
0.0780
0.0794
0.0831
Total ($/Dth @ Full Contract)
n/a
0.2494
0.2523
0.2469
0.2512
0.2588
 
SFV Rate Design
 2011 Jan 1 - Apr 30 2011 May 1 - Dec 31 2012 2013 Jan 1 - Mar 31 2013 Apr 1 - Dec 31 2014
Baja to On-System Core
Reservation Charge ($/Dth/mo)
n/a
7.2499
7.3504
7.2031
7.3313
7.5567
Usage Charge ($/Dth)
n/a
0.0111
0.0106
0.0101
0.0102
0.0104
Total ($/Dth @ Full Contract)
n/a
0.2494
0.2523
0.2469
0.2512
0.2588

Notes:

Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.

To arrange for the further transportation and delivery of natural gas to an End-Use Customer's meter, one of the following additional rate schedules must be utilized: G-CT, G-NT, G-EG, G-NGV4 or G-WSL.

All services are subject to PG&E's tariffs and applicable contracts. In the event that the descriptions on this page vary from the tariff, the tariff provisions will predominate.


Copyright © 2009 Pacific Gas and Electric Company.
All rights reserved.