Firm Capacity Commitments January 03, 2013 at 5:28 p.m. Commitments for January through June, 2013...
Delay in Customer Meter Data January 02, 2013 at 6:20 a.m. Updated:Customer meter data is becoming available, but CGT will update you when all data is available...
New Report Available November 15, 2012 at 4:20 p.m. New report shows usage and scheduled volumes...
CGT Ready To Serve on Veterans Day November 09, 2012 at 11:00 a.m. Pacific Gas and Electric Company's California Gas Transmission is ready to serve its customers on Veterans Day...
Baja Path Constraints November 09, 2012 at 9:30 a.m. Updated: Impacts to Kern River Pipeline interconnect at Daggett Delayed by One Day...
New Gas Scheduling Tools Now Available December 02, 2010 at 8:31 a.m. Tools help with cut codes and understanding the basic nomination flow on CGT’s system...
Notice to Shippers - Holding Constraint Limits November 05, 2010 at 8:52 a.m. Interconnect constraints and path limits for Intraday 1 nominations held to Evening cycle scheduled volumes...
Notice to Shippers - Holding Constraint Limits November 05, 2010 at 3:39 p.m. Interconnect constraints and path limits for Intraday 2 nominations held to Evening cycle scheduled volumes...
AMR Data Unavailable June 08, 2010 at 12:55 p.m. Updated: AMR data for gas day June 7 is now available...
High BTU Gas Expected June 7 June 06, 2010 at 10:45 a.m. Update: regarding expected high BTU gas on the system June 7...
High BTU Gas Expected Monday, June 7 June 04, 2010 at 3:39 p.m. Unexpected outage at a plant in Canada results in high BTU gas expected from Malin starting Monday...
Alert – Possible OFO for Gas Day May 26 May 25, 2010 at 3:31 p.m. PG&E may call an OFO for gas day May 26 if Evening cycle nominations increase significantly...
SNL is coming to CGT!!! Febuary 25, 2009 at 9:45 a.m. The latest scheduling tips and hints at your fingertips...
E-mail Timely Noms for Gas Day February 25 Febuary 24, 2009 at 11:01 a.m. Timely nomination changes for gas day February 25 should be e-mailed to CGT's Gas Scheduling team...
INSIDEtracc Logon Issues Febuary 24, 2009 at 9:13 a.m. CGT is currently investigating logon issues with INSIDEtracc; Timely deadline now 10:45 a.m. PT...
Edit Replacement Screen Program Changes April 03, 2008 at 12:22 p.m. A programming change was implemented for INSIDEtracc's Edit Replacement screen on April 2...
November 08, 2007 at 8:58 a.m. CGT called System-Wide OFOs even though the requirements for Customer-Specific OFOs were met...
November 7 SW-OFO November 07, 2007 at 7:44 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met......
November 3 and 5 SW-OFOs November 05, 2007 at 10:50 a.m. CGT called System-Wide OFOs even though the requirements for Customer-Specific OFOs were met...
INSIDEtracc Makes Balancing Pools Easy November 21, 2006 at 5:29 p.m. CGT recommends using the balancing tool to check Pools before the Timely deadline....
November 18 SW-OFO November 18, 2006 at 10:09 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
October 15 SW-OFO October 16, 2006 at 12:20 p.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
October 14 SW-OFO October 14, 2006 at 10:15 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
October 12 SW-OFO October 12, 2006 at 11:01 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Change in Approach: OFOs in the Afternoon October 12, 2006 at 8:15 a.m. Late afternoon OFOs may be called as an alternative to holding to prior interconnect constraints
...
October 9, 2006 at 9:24 a.m. Due to high inventory on the PG&E system, new nominations placed in the Intraday 1 and Intraday 2 cycles for gas day October 9, 2006 have been cut to zero...
September 26 SW-OFO September 26, 2006 at 9:00 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
September 22 and 23 SW-OFOs September 25, 2006 at 8:28 a.m. CGT called System-Wide OFOs even though the requirements for Customer-Specific OFOs were met...
Notice to Shippers - Evening Noms for Gas Day 9/15/2006 September 14, 2006 at 5:14 p.m. Due to high inventory on the PG&E system, new nominations placed in the Evening cycle for gas day September 15, 2006 have been cut to zero...
Notice to Shippers - Intraday 2 Noms for Gas Day 9/14/2006 September 14, 2006 at 3:45 p.m. Due to high inventory on the PG&E system, new nominations placed in the Intraday 2 cycle for gas day September 14, 2006 have been cut to zero...
June 14, 2006 at 2:25 p.m. Higher-than-normal heating value gas is returning to normal levels...
Meet CGT June 14, 2006 at 1:00 p.m. Meet our newest CGT Account Services Representative...
Scheduled Volumes from El Paso for Gas Day June 6 June 7, 2006 at 8:40 a.m. Scheduled volumes for EPNG for the Intraday 2 cycle for gas day June 6 were processed using Evening volumes received from EPNG...
Revised Customer-Specific OFO Notice March 21, 2006 at 8:30 a.m. A new targeted customer-specific OFO message has been sent only to those customers who are targeted for the OFO....
December 24 SW-OFO December 27, 2005 at 9:18 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
INSIDEtracc Update December 21, 2005 at 12:11 p.m. INSIDEtracc is expected to be available around 12:30 p.m. Pacific time...
Please Refrain from Submitting Reports December 21, 2005 at 9:33 a.m. Due to technical difficulties, we are asking that customers refrain from submitting reports at this time...
Pipe Kwon Do December 15, 2005 at 9:00 a.m. Enlightenment on Replacement Nominations...
Natural Gas Web Briefing December 15 December 8, 2005 at 2:30 p.m. PG&E is conducting its first ever Internet conference for all business customers on December 15...
November 24 SW-OFO November 24, 2005 at 10:14 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
November 23 SW-OFO November 23, 2005 at 4:00 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Nomination Sequencing has Changed November 22, 2005 at 12:35 p.m. Transportation contracts and destination rankings determine nomination sequencing when there is a supply shortfall at the interconnect...
Password Guidelines November 18, 2005 at 2:15 a.m. Passwords are a little more sophisticated these days than "Open, Sesame!"...
INSIDEtracc Maintenance October 31, 2005 at 3:21 p.m. The INSIDEtracc nomination system will be down for maintenance Wednesday night November 2, 2005....
INSIDEtracc Online Training Schedule October 28, 2005 at 3:30 p.m. Online training will be held for the new INSIDEtracc changes coming November 8...
High Inventory June 28, 2005 at 9:45 a.m. System constraints for Intraday 1 have been held to Evening scheduled volumes...
June 29 SW-OFO June 28, 2005 at 5:30 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Passwords and Information Protection June 28, 2005 at 3:55 p.m. PG&E's internet security staff would like us to remind customers of the importance of choosing a secure password...
June 25 SW-OFO June 24, 2005 at 5:25 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
June 17 and 18 SW-OFOs June 18, 2005 at 2:35 p.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
INSIDEtracc Maintenance January 31, 2005 at 1:00 p.m. INSIDEtracc will be down for maintenance tomorrow night...
APD Window Closed January 28, 2005 at 2:00 p.m. The probability of an APD prior to next winter is nearly zero...
INSIDEtracc Maintenance January 20, 2005 at 11:00 a.m. INSIDEtracc will be down for maintenance tonight...
Pipe Kwon Do January 18, 2005 at 11:20 a.m. A deft hand is rewarded when reranking...
Customer Bookmarks January 10, 2005 at 4:28 p.m. CGT encourages customers using bookmarks to re-bookmark the Pipeline Status and other operations data pages...
Notice to Shippers January 2, 2005 at 8:14 a.m. Due to high inventory on the PG&E system, new nominations placed in the Intraday 1 and Intraday 2 cycles for gas day January 2, 2005 will be cut to zero....
January 1 SW-OFO January 1, 2005 at 3:24 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
High Inventory for December 31 December 31, 2004 at 8:30 a.m. Nominations will be limited to Evening scheduled volumes for gas day December 31, 2004...
INSIDEtracc Documentation Updated December 23, 2004 at 2:00 p.m. The Nominate! and INSIDEtracc User Documentation has recently been updated...
November 27, 2004 at 7:49 a.m. CGT returned Kettleman compressor K-1 to service...
High Inventory for November 26 November 26, 2004 at 9:49 a.m. Nominations will be limited to Evening scheduled volumes for gas day November 26, 2004....
High Inventory for November 25 November 25, 2004 at 7:36 a.m. Nominations will be limited to Evening scheduled volumes for gas day November 25, 2004....
November 24 SW-OFO November 24, 2004 at 2:14 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
October 26, 2004 at 2:31 p.m. All INSIDEtracc reports are now available...
Pipe Kwon Do October 25, 2004 at 2:30 a.m. Pipe Ranger will quickly display yesterday's Daily Gas Usage...
INSIDEtracc Maintenance October 22, 2004 at 1:45 a.m. INSIDEtracc will be down for maintenance Monday night...
High Inventory for October 19 October 19, 2004 at 12:22 p.m. Nominations will be limited to Intraday 1 scheduled volumes...
High Inventory for October 16 October 16, 2004 at 1:45 a.m. Nominations will be limited to Intraday 1 scheduled volumes...
Annual Quiet Period at McDonald Island October 12, 2004 at 2:00 p.m. During the quiet period, CGT's physical injection capacity will total approximately 60 MMcf/d...
High Inventory for October 12 October 11, 2004 at 4:29 p.m. Nominations will be limited to Timely scheduled volumes...
Second Page Sent for CS-OFO for 10/8/2004 October 8, 2004 at 7:30 a.m. A second blast page was inadvertently sent out this morning for the CS-OFO called yesterday for gas day 10/8/2004...
Pipe Kwon Do September 29, 2004 at 6:00 a.m. Reflect by Looking Back and Within...
High Inventory for Intraday 1 and 2 September 28, 2004 at 9:45 a.m. New nominations placed in the Intraday 1 and Intraday 2 cycles will be cut to zero...
September 25 SW-OFO September 25, 2004 at 6:00 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
September 22 SW-OFO September 22, 2004 at 4:00 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Operations Info Initiative Results September 21, 2004 at 1:30 p.m. CGT is pleased to announce a customer satisfaction initiative targeting Pipe Ranger's Pipeline Status forecasts...
Pipe Kwon Do September 13, 2004 at 1:18 p.m. Subscription to the proper CGT lists will accurately guide timely information...
September 5 SW-OFO September 7, 2004 at 8:38 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Static Operations Data Page Created March 30, 2004 at 5:34 a.m. A static operations data page has been created pending resolution of live data pages...
Operations Data March 29, 2004 at 3:20 p.m. Operations data on Pipe Ranger is in transition...
March 25 SW-OFO March 25, 2004 at 6:00 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Storage Shrinkage Arrives May 1 March 23, 2004 at 2:43 p.m. An in-kind shrinkage factor will be applied to storage injections beginning May 1, 2004...
2005 Transmission and Storage Rate Proposal March 22, 2004 at 12:01 p.m. Pacific Gas and Electric Company filed its Gas Transmission and Storage 2005 Rate Case Application...
March 18 SW-OFO March 18, 2004 at 4:43 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
March 14 SW-OFO March 15, 2004 at 11:13 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
March 10 and 11 SW-OFOs March 12, 2004 at 9:38 a.m. CGT called System-Wide OFOs even though the requirements for Customer-Specific OFOs were met...
Revised OFO Rules for 2004 March 9, 2004 at 7:43 a.m. The first OFO of 2004 brings with it a few revised policies...
Intraday 2 Notice March 9, 2004 at 1:27 p.m. System constraints for Intraday 2 will be held to Intraday 1 scheduled volumes...
Doing Business with CGT in 2004 December 19, 2003 at 5:30 a.m. Doing Business with CGT in 2004 provides customers the information needed to conduct business on CGT's system beginning January 1, 2004...
Open Season Closes Tomorrow December 18, 2003 at 4:41 a.m. today the CPUC issued its final decision approving California Gas Transmission's 2004 Extension and Open Season...
Open Season Closes Friday December 15, 2003 at 11:32 a.m. Less than one week remains to submit your Request for Firm Service...
Storage and the Redwood Path December 12, 2003 at 9:00 a.m. Customers should be aware of a new procedure for allocating as-available capacity...
Make an Informed Commitment December 4, 2003 at 11:00 a.m. Extension and Open Season participants may review the Gas Accord II -- 2004 decision prior to fully committing...
Proposed Gas Accord II -- 2004 Decision November 19, 2003 at 3:22 a.m. The PD would generally adopt Pacific Gas and Electric Company's proposals for contracting into 2004...
November 16 SW-OFO November 17, 2003 at 1:22 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Customer Satisfaction Initiatives November 14, 2003 at 7:00 a.m. CGT is wrapping up the satisfaction initiatives it took during 2003...
November 9 SW-OFO November 10, 2003 at 8:20 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Deadline for Adding or Removing Customers November 10, 2003 at 4:00 a.m. The deadline to submit changes to an NBAA using Exhibits A or B for December business is November 26...
EPNG Technical Difficulties September 6, 2003 at 1:34 a.m. El Paso Pipeline is experiencing technical difficulties that prevented them from providing scheduled volumes to Pacific Gas and Electric Company for the IntraDay 1 cycle...
Timely Deadline Extension September 3, 2003 at 9:59 a.m. Timely deadline for gas day September 4 has been extended...
Therm Factor Detail August 28, 2003 at 2:30 p.m. The Therm Factors page now features links to the Heating Values that comprise each individual therm factor...
August 22, 2003 at 8:45 a.m. Customers should closely monitor their INSIDEtracc nominations...
INSIDEtracc Enhancements On Hold August 19, 2003 at 1:00 a.m. The INSIDEtracc enhancements previously announced on Pipe Ranger have not been implemented...
Change Is In The Air August 17, 2003 at 11:30 p.m. Remember to familiarize yourself with the new INSIDEtracc improvements prior to implementation...
More INSIDEtracc Improvements August 14, 2003 at 4:38 a.m. CGT will roll out two additional INSIDEtracc improvements this coming Tuesday....
June 28 SW-OFO June 27, 2003 at 9:15 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
System Injection Limited June 27, 2003 at 1:45 p.m. Total system injection capacity will be limited to 260 MMcf/d from June 27 through July 4...
Proposed Bankruptcy Settlement June 24, 2003 at 7:33 a.m. On June 19, 2003, U.S. Bankruptcy Judge Newsome announced a proposed settlement agreement...
June 20 and June 21 SW-OFOs June 20, 2003 at 2:30 a.m. CGT called System-Wide OFOs even though requirements for Customer-Specific OFOs were met...
Extremely High System Inventory June 11, 2003 at 8:02 a.m. Due to extremely high inventory on CGT's system, some nominations for gas day June 11, 2001 will be cut....
Daily Parking June 11, 2003 at 5:00 a.m. The Golden Gate Market Center can offer parking services even when you may least expect it....
Sorting It All Out June 10, 2003 at 9:20 a.m. The OFO Archive page has a new look...
June 8 SW-OFO June 9, 2003 at 10:21 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
June 5 SW-OFO June 4, 2003 at 12:01 p.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
May 31 OFO May 30, 2003 at 8:07 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Quicker Turnaround on NBAA Exhibits May 30, 2003 at 3:00 p.m. Pacific Gas and Electric Company has just received CPUC approval on an advice filing to modify Schedule G-BAL...
Plan One Data on the Second of the Month April 29, 2003 at 12:05 p.m. On April 2, 2003, Pipe Ranger's Pipeline Status pages displayed some inaccurate operations data for a few hours...
EPNG Technical Difficulties April 24, 2003 at 1:23 a.m. Technical problems prevented EPNG from confirming Intraday 1 nominations...
INSIDEtracc Technical Difficulties April 16, 2003 at 1:58 a.m. Due to technical difficulties with INSIDEtracc this morning, CGT processed Intraday 1 nominations...
Blast Page Test April 15, 2003 at 1:45 a.m. CGT will test the blast page system Thursday...
INSIDEtracc Training Coming to Houston April 10, 2003 at 10:10 a.m. A CGT representative will be in Houston conducting INSIDEtracc training in May, 2003...
New Shrinkage Rates and March Nominations Febuary 27, 2003 at 2:49 a.m. Customers who made March nominations early should verify they have planned their delivered volumes using the new rates...
February 21 SW-OFO Febuary 21, 2003 at 11:50 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Self-Balancing Open Season Febuary 20, 2003 at 1:08 a.m. A Self-Balancing open season is now under way...
CGT Tops the Charts in 2002 January 30, 2003 at 10:26 a.m. Annual customer satisfaction survey results are in...
El Paso Technical Difficulties January 26, 2003 at 2:25 a.m. Due to El Paso technical difficulties, some CGT scheduled volumes reflect confirmed volumes...
PG&E Files Gas Accord II-2004 Application January 15, 2003 at 11:12 a.m. On January 13, 2003, PG&E filed its Gas Accord II Amended Application and accompanying testimony...
Ready for Winter 2002 October 30, 2002 at 3:54 a.m. CGT brings you Getting Ready for Winter...
Stay in Touch with E-mail OFO Notice October 18, 2002 at 11:59 a.m. Account Representatives are now asking noncore end-use gas customers to add an e-mail contact to their NGSAs...
October 17 SW-OFO October 16, 2002 at 11:42 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
INSIDEtracc Upgrades Tonight October 15, 2002 at 11:24 a.m. What do October 14, 1582 and INSIDEtracc have in common?...
September 18, 2002 at 1:41 a.m. INSIDEtracc is back online...
September 18 SW-OFO September 17, 2002 at 1:33 a.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Open Season Volumes September 16, 2002 at 1:20 a.m. CGT announced the annual firm capacity available in its Open Season...
Extension and Open Season Update September 6, 2002 at 12:05 p.m. Today CGT mailed customers revised Extension and Open Season materials...
INSIDEtracc Web Eclipses Dial-Up Service September 3, 2002 at 1:08 a.m. INSIDEtracc Web is such a hit that customers are no longer using its dial-up predecessor...
New Off-System Interconnect Preview August 12, 2002 at 3:00 a.m. The KRGT High Desert Lateral Interconnect is coming online on CGT's southern pipeline system...
Contract For The Future August 7, 2002 at 9:45 a.m. In anticipation of CPUC approval, CGT offers several documents explaining the Extension and Open Season...
INSIDEtracc Down for Maintenance August 2, 2002 at 9:15 a.m. INSIDEtracc will be down for maintenance for approximately 30 minutes starting at 9:30 a.m. P.T...
June 24, 2002 at 2:09 a.m. Total system injection capacity will be limited to 280 MMcf/d through June 25...
June 16 SW-OFO June 18, 2002 at 12:49 p.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Gas Accord II Joint Reply Comments Filed June 18, 2002 at 12:45 p.m. On June 17th, joint reply comments were filed by the Settlement Parties in the Gas Accord II proceeding...
Bankruptcy Court Notices June 17, 2002 at 12:42 p.m. Today the United States Bankruptcy Court mailed a variety of information...
Electric Generation Data Revised June 17, 2002 at 12:33 p.m. CGT revised some of Pipe Ranger's Daily Demand by Customer Class data...
June 12 SW-OFO June 11, 2002 at 12:29 p.m. CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Contract Extension Letters June 10, 2002 at 12:22 p.m. CGT mailed each customer a complete list of their extendable contracts...
Customer Bookmarks May 30, 2002 at 5:12 a.m. CGT encourages customers to re-bookmark the Pipeline Status page...
Expansion Capacity Now For Sale May 30, 2002 at 5:09 a.m. In just over one month the first phase of CGT's Redwood path expansion will be placed in service...
Operational Date for Questar Interconnect May 28, 2002 at 5:07 a.m. The targeted operational date for the Questar interconnect is currently estimated to be mid-June...
El Paso Technical Problems May 28, 2002 at 5:05 a.m. El Paso is experiencing technical difficulties that prevented them from providing scheduled allocation volumes for the Intraday 1 cycle...
Gas Accord II Settlement Signed May 22, 2002 at 4:54 a.m. Pacific Gas and Electric Company and numerous parties submitted the Gas Accord II Settlement Agreement...
INSIDEtracc Maintenance March 7, 2002 at 3:31 a.m. INSIDEtracc will be down for maintenance Saturday evening...
Kern River Flow Restriction at Daggett March 6, 2002 at 3:27 a.m. Kern River will not be shutting in flow to PG&E Daggett during their scheduled maintenance on March 13 and 14 as CGT previously stated...
INSIDEtracc Training Coming to Houston March 6, 2002 at 3:24 a.m. California Gas Transmission will have a representative in Houston in May, 2002, to conduct training sessions on INSIDEtracc...
February 22 SW-OFO Febuary 21, 2002 at 2:34 a.m. For gas day February 21, 2002, CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
System Injection Returns Febuary 21, 2002 at 2:31 a.m. Total system injection capacity returns to 240 MMcf/d effective February 23...
Shrinkage Reminder Febuary 21, 2002 at 2:29 a.m. CGT reminds shippers that new shrinkage factors will become effective on gas day March 1...
Response to Protests Febuary 20, 2002 at 2:25 a.m. Pacific Gas and Electric Company responded to protests to its Section 7 filing...
INSIDEtracc Deadlines Extended Febuary 17, 2002 at 2:23 a.m. INSIDEtracc system has been restored, and deadlines have been extended as follows...
INSIDEtracc Technical Difficulties Febuary 17, 2002 at 2:19 a.m. INSIDEtracc system is unavailable this morning due to technical difficulties...
New In-Kind Shrinkage Factors Febuary 14, 2002 at 12:15 p.m. New in-kind shrinkage factors will be in place effective March 1, 2002...
EDI Requirements for Off-System Deliveries Febuary 14, 2002 at 2:17 a.m. Off-system deliveries using multiple downstream contracts require the same downstream contract on both pipelines to ensure proper allocation of volumes...
You've Got Mail? Not! Febuary 12, 2002 at 12:11 p.m. E-mail notices regarding OFOs and E-Confirming or E-Accepting contracts temporarily cannot be sent from INSIDEtracc...
What's in a Cubic Foot? Febuary 7, 2002 at 12:03 p.m. Pipe Ranger now offers gas quality data...
Pipeline Balancing Inventory Update Febuary 6, 2002 at 11:58 a.m. Underdeliveries have reduced Imbalance Gas in Storage to less than 0.5 Bcf...
Seventh OFO Report Available January 31, 2002 at 1:33 a.m. Pacific Gas and Electric Company recently distributed its seventh OFO Report...
Two Revised Standard Forms January 30, 2002 at 1:24 a.m. Two revised standard forms are now available online...
Approaching Cold Winter Day January 29, 2002 at 1:20 a.m. CGT expects temperatures to approach the Cold Winter Day criteria today and tomorrow...
System Injection Limited January 29, 2002 at 1:17 a.m. Total system injection capacity will be limited to 140 MMcf/d from February 1 until February 22...
POR Documents Made Easy January 23, 2002 at 1:11 a.m. Pacific Gas and Electric Company will make POR documents available online...
Intraday 1 Deadline Extension January 22, 2002 at 1:08 a.m. CGT has extended the Intraday 1 nomination deadline until 9:00 a.m....
INSIDEtracc Maintenance January 17, 2002 at 1:01 a.m. On Tuesday evening, CGT will upgrade the INSIDEtracc database and server...
Usage Data Used for January 11 SW-OFO January 11, 2002 at 12:46 p.m. The SW-OFO called for January 11 was developed by retrieving the gas usage data for January 4...
New Year Reminders January 10, 2002 at 12:53 p.m. Pipe Ranger reminds you of a few New Year happenings...
Usage Data Used for 1/11/2002 OFO January 10, 2002 at 10:45 a.m. The SW-OFO called for January 11 was developed by retrieving the gas usage data for January 4...
Pipeline Balancing Injections Return January 8, 2002 at 10:51 a.m. Imbalance gas in storage recently returned to levels near and below 2.2 BCF...
New Gas Rates and Shrinkage Factors January 2, 2002 at 10:25 a.m. New gas rates and shrinkage factors went into place effective January 1, 2002...
December 29 SW-OFO December 28, 2001 at 11:44 a.m. For gas day December 29, 2001, CGT called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
Further FERC Facts December 12, 2001 at 11:42 a.m. FERC set January 29 as the last day parties may intervene...
ID1 Cycle Extended December 8, 2001 at 11:33 a.m. Intraday 1 nomination deadline for 12/9/01 is being extended until 8:30 a.m. Pacific Time...
Improved Access for ECS Exhibit B Changes November 29, 2001 at 11:20 a.m. ECS user access changes are now easier than ever. Simply fill out Exhibit B online and fax it in...
ID1 Cycle Extended November 23, 2001 at 11:18 a.m. Intraday 1 nomination deadline for 11/24/01 is being extended until 9 a.m. Pacific Time...
Injection Limited November 21 November 19, 2001 at 11:14 a.m. Total system injection capacity will be reduced to 190 MMcf...
Fire at Gerber Compressor Station November 14, 2001 at 11:12 a.m. A fire has destroyed the Gerber Compressor Station building. Pipeline capacity will be reduced for approximately six months...
Notice to Shippers November 8, 2001 at 9:50 a.m. Nominations for incremental supplies placed in the Intraday 1 cycle today will be cut to zero for gas day 11/08/2001...
Sixth OFO Report Available November 5, 2001 at 9:47 a.m. Pacific Gas and Electric Company recently distributed its sixth OFO Report...
Late AMR Usage Data October 19, 2001 at 3:32 a.m. AMR Usage data for October 19 will be available Saturday evening, October 20...
Gas Accord II Proposal Filed October 18, 2001 at 3:28 a.m. The application proposes a simple two-year extension...
Open Season Terminated October 18, 2001 at 3:27 a.m. The California Gas Transmission Open Season is terminated...
McDonald Island Maintenance Rescheduled October 11, 2001 at 3:24 a.m. Maintenance at the McDonald Island storage field has been rescheduled for one day only, October 25...
Pilot Auction Begins Next Week October 11, 2001 at 3:20 a.m. The trial auction utilizing the Pantellos Marketplace will make its debut next week...
October 7 SW-OFO October 6, 2001 at 3:18 a.m. For gas day October 7, 2001, Pacific Gas and Electric Company's California Gas Transmission called a System-Wide OFO even though the requirements for a Customer-Specific OFO were met...
ECS Agreement Reminder September 27, 2001 at 1:19 a.m. Don't forget! Each customer needs to return a signed ECS Agreement to CGT by the end of September...
Additional POR Info Online September 21, 2001 at 1:04 a.m. Pacific Gas and Electric Company now offers extensive information regarding the Plan of Reorganization...
August Imbalance Statements Delayed September 17, 2001 at 12:50 p.m. August Imbalance Statements will be re-faxed to customers this evening...
Scheduled Maintenance Postponed September 17, 2001 at 12:42 p.m. McDonald Island maintenance is rescheduled for September 20. Total system injection capacity for September 20 will be 210 MMcf/day...
A Time To Remember September 14, 2001 at 12:48 p.m. We have all been affected immeasurably by the horrible events of this week...
Los Medanos Compressor Outage September 13, 2001 at 10:47 a.m. Estimated return to service date: October 20, 2001...
Pipeline Balancing Injection Unavailable September 10, 2001 at 12:45 p.m. Pipeline balancing injections will be temporarily suspended beginning this Thursday...
Transwestern Capacity at Interconnect Reduced August 31, 2001 at 5:18 a.m. For gas day September 19, capacity at the Topock interconnect between Transwestern Pipeline and Pacific Gas and Electric Company's California Gas Transmission will be reduced...
INSIDEtracc Enhancements Coming Soon August 30, 2001 at 5:14 a.m. Coming this October, we will offer some exciting new INSIDEtracc enhancements to simplify your lives...
Timely Cycle EPNG Volumes for Gas Day August 30 August 29, 2001 at 5:11 a.m. El Paso Natural Gas Pipeline is experiencing technical difficulties that prevented them from providing Timely cycle, scheduled allocation volumes...
Intraday1 Deadline Extended August 29, 2001 at 5:07 a.m. The Intraday1 deadline for gas day August 29 has been extended to 09:35 a.m. Timely deadline for gas day August 30 has been extended to 10:00 a.m....
Injection Limited September 12 August 24, 2001 at 4:43 a.m. Scheduled maintenance will reduce total system injection capacity to 240 MMcf...
INSIDEtracc Web a Hit! August 16, 2001 at 4:41 a.m. The reviews of CGT's latest release are in...
Open Season Suspended August 13, 2001 at 4:01 a.m. Pacific Gas and Electric Company is suspending its open season...
INSIDEtracc Technical Difficulties August 7, 2001 at 3:58 a.m. CGT experienced technical difficulties during the Intraday 2 cycle for gas day August 6...
Fifth OFO Report Available August 1, 2001 at 3:54 a.m. Pacific Gas and Electric Company recently distributed its fifth OFO Report...
ID1 Deadline Extended for July 30 July 30, 2001 at 12:29 p.m. The intraday 1 cycle nomination deadline for today's gas day, July 30, 2001, has been extended to 8:30 a.m. Pacific Time...
July 21 System-Wide OFO July 21, 2001 at 12:25 p.m. For gas day July 21, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
2001 Cal Gas Report Available July 18, 2001 at 12:23 p.m. The 2001 California Gas Report Supplement is now available online...
Open Season Extended July 17, 2001 at 12:20 p.m. The close of the CGT Open Season is extended to August 31...
Gas Market Update July 16, 2001 at 12:18 p.m. Last week, CGT Vice President Mike Katz delivered a Gas Market Update to PANC...
July 14 SW-OFO July 13, 2001 at 11:54 a.m. CGT issued the SW-OFO although the conditions for a CS-OFO were met...
Baja Path Pipeline Capacity Constraint July 12, 2001 at 11:49 a.m. Pressure losses on Baja path pipeline during construction will constrain capacity to 970 MMcf...
INSIDEtracc Dial-In Problems July 11, 2001 at 11:42 a.m. If you are experiencing technical problems dialing in to INSIDEtracc through a modem...
INSIDEtracc Web Available Wednesday July 9, 2001 at 11:37 a.m. INSIDEtracc Web is coming this Wednesday. California Gas Transmission offers these tips...
July 7 System-Wide OFO July 7, 2001 at 11:35 a.m. For gas day July 7, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
June 30 System-Wide OFO June 30, 2001 at 10:30 a.m. For gas day June 30, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
Transwestern Technical Difficulties June 19, 2001 at 10:03 a.m. The technical difficulties Transwestern Pipeline experienced on 6/18/2001 for Intraday 2 have been resolved...
June 14 System-Wide OFO June 14, 2001 at 10:16 a.m. For gas day June 14, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
Your Paths to the Future June 12, 2001 at 9:44 a.m. Complete California Gas Transmission Open Season materials are now available...
Displacement Agreement Finalized June 8, 2001 at 9:37 a.m. Arrangements have been finalized that will allow some or all of the gas volumes nominated at the Daggett interconnect to flow via displacement during maintenance currently scheduled on the Baja path for June 10 through June 30...
June 9 System-Wide OFO June 8, 2001 at 9:35 a.m. For gas day June 9, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
Update on Daggett Constraint June 7, 2001 at 9:20 a.m. Kern River Gas Transmission has been working with SoCal Gas Company on arrangements that would allow some or all of the gas volumes nominated to Pacific Gas and Electric Company at the Daggett interconnect to flow during maintenance...
Daggett Constraint June 6, 2001 at 9:17 a.m. Due to maintenance on the Baja path, the Daggett interconnect point for Kern River Gas Transmission (KRGT) Pipeline will be shut in...
June 7 System-Wide OFO June 6, 2001 at 9:16 a.m. For gas day June 7, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
June 2 System-Wide OFO June 1, 2001 at 8:57 a.m. For gas day June 2, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
SoCal Gas Technical Difficulties May 31, 2001 at 8:53 a.m. Southern California Gas Company (SoCal) is experiencing technical difficulties for gas day June 1, 2001...
May 30 System-Wide OFO May 31, 2001 at 8:51 a.m. For gas day May 30, 2001, PG&E called a System-Wide OFO even though requirements were met for a Customer-Specific OFO...
OFO Revised to Stage 4 May 27, 2001 at 8:38 a.m. CGT revised the OFO for tomorrow, gas day May 28, to stage 4 with a $25.00 per Dth noncompliance charge...
System Difficulties May 24, 2001 at 8:35 a.m. CGT experienced system difficulties while confirming timely cycle volumes...
High Inventory for Intraday 1 May 17, 2001 at 8:33 a.m. New nominations placed in the Intraday 1 cycle will be cut to zero...
Extremely High System Inventory May 17, 2001 at 8:29 a.m. Due to extremely high inventory...some nominations for gas day May 17, 2001 will be cut...
High Inventory for Intraday 1 May 17, 2001 at 8:25 a.m. New nominations placed in the Intraday 1 cycle will be cut to zero...
High Inventory for Intraday 1 May 11, 2001 at 8:23 a.m. New nominations placed in the Intraday 1 cycle will be cut to zero...
Technical Difficulties for Intraday 1 May 10, 2001 at 8:19 a.m. Interconnecting pipelines will use CGT's May 10 evening scheduled volumes for intraday 1...
Nominations Held to Timely Cycle May 5, 2001 at 8:17 a.m. Any nominations placed in the evening cycle for gas day May 6 will be cut to zero...
ESD Testing at Tionesta Delayed April 25, 2001 at 1:54 a.m. ESD testing at the Tionesta compressor station has been postponed...
Redwood Capacity Reduced April 23, 2001 at 1:46 a.m. Redwood path capacity for today's gas day will be reduced...
Infrastructure Workshop April 19, 2001 at 1:42 a.m. This week CGT and several market participants made presentations at a CPUC workshop...
Discussions With End-Use Customers April 18, 2001 at 1:03 a.m. Pacific Gas and Electric Company is now reminding its noncore end-use customers to plan ahead...
INSIDEtracc Is Back March 12, 2001 at 12:39 p.m. INSIDEtracc is back up and running...
Nomination Deadlines Extended March 12, 2001 at 12:09 p.m. Pacific Gas and Electric Company has extended the timely and intraday 1 nomination deadlines...
McDonald Island Maintenance In March March 9, 2001 at 12:00 p.m. McDonald Island storage field maintenance results in lower injection and withdrawal capabilities...
Repeat Blast Page Sent Febuary 5, 2001 at 8:50 a.m. Due to technical difficulties, a Blast Page with repeat information for the System-Wide OFO called for 2/5/2001 was sent this morning...
OFO Tolerance Band for 2/5/2001 Febuary 4, 2001 at 8:47 a.m. The System-Wide OFO called for Gas Day 2/5/2001 will have a tolerance band of 0%...
Business Calendar Updated January 16, 2001 at 4:05 a.m. The CGT Business Calendar for 2001 has been updated...
Balancing Gas in Storage at Critical Levels January 11, 2001 at 3:59 a.m. When Imbalance Gas in Storage is less than or equal to zero, balancing withdrawals are unavailable...
Transwestern Capacity Increase November 29, 2000 at 12:08 p.m. Effective Friday, interconnection capacity between Transwestern Pipeline and Pacific Gas and Electric Company will increase...
Winter Wednesday November 29, 2000 at 12:05 p.m. CGT kicks off Winter Wednesdays...
Therm Factor Table Revised November 3, 2000 at 12:02 p.m. The Therm Factor table has been revised for the weeks of 10/22 through 11/5/00...
Second OFO Report Available November 2, 2000 at 11:30 a.m. Pacific Gas and Electric Company recently distributed its second OFO Report...
INSIDEtracc is Back October 24, 2000 at 11:12 a.m. INSIDEtracc is back and customers can logon...
Nomination Deadlines Extended October 24, 2000 at 10:54 a.m. Due to continuing difficulties with INSIDEtracc this morning, nomination deadlines are extended...
Saved Reports Back on Main Server October 24, 2000 at 10:48 a.m. INSIDEtracc reports are back on our main server and the Volume field must be reset...
INSIDEtracc Difficulties Solved September 25, 2000 at 2:20 a.m. Problems corrected...the ID1 cycle deadline for gas day 09/25/2000 will be extended to 9:30 a.m. (PST)...
INSIDEtracc Technical Difficulties September 25, 2000 at 2:17 a.m. As a result, the ID1 cycle deadline for gas day 09/25/2000 will be extended to 9:00 a.m. (PST)...
INSIDEtracc is Off-line September 25, 2000 at 2:15 a.m. INSIDEtracc is still off-line. ETA is 30 minutes at the earliest...
Shrinkage Shrinks September 21, 2000 at 2:10 a.m. Effective October 1, 2000, PG&E's shrinkage rates will be reduced...
The Search Begins Tomorrow August 16, 2000 at 11:46 a.m. Our search index needs a bit of time to catch up with our site changes...
New Pipe Ranger Launches Tomorrow August 15, 2000 at 11:42 a.m. Please remember that tomorrow, August 16, you will see an improved, more efficient Pipe Ranger...
Pipe Ranger Reborn! August 14, 2000 at 11:38 a.m. On August 16, 2000, Pacific Gas and Electric Company's California Gas Transmission will release the newest incarnation of its Pipe Ranger Web site...
INSIDEtracc Training August 10, 2000 at 11:34 a.m. INSIDEtracc training is coming soon...
2000 Cal Gas Report Available Online July 31, 2000 at 10:59 a.m. The 2000 California Gas Report is now available online in Pipe Ranger's Library section...
OII Implementation Update July 28, 2000 at 10:50 a.m. The Pacific Gas and Electric Company Gas OII Settlement Agreement will offer Pacific Gas and Electric Company's customers ten new service options...
Why e-Billing? July 20, 2000 at 9:45 a.m. With e-Billing, you receive an electronic image of your Detail of Bill (DOB). This image is sent via a secure, password protected e-mail.
...
Notice to Customers on the PG&E System: Kern River Problems July 11, 2000 at 10:46 a.m. Kern River Gas Transmission is experiencing system problems that prevented them from providing scheduled volumes to Pacific Gas and Electric Company for the ID1 cycle...
Scheduled Volumes for 7/6/00 and 7/7/00 July 7, 2000 at 10:38 a.m. Due to system problems, Intraday 2 volumes for 7/6/2000 were scheduled using Intraday 1 scheduled volumes. Evening Cycle volumes for 7/7/2000 were scheduled...
Continued Technical Difficulties - Timely Cycle Processing July 6, 2000 at 10:30 a.m. In order to meet GISB deadlines, Pacific Gas and Electric Company will confirm volumes for the Timely Cycle, 7/7/2000, using Timely Cycle confirmed volumes from gas day 7/6/2000...
Technical Difficulties - Timely Cycle 7/7/2000 July 6, 2000 at 10:28 a.m. Pacific Gas and Electric Company is experiencing technical difficulties which is preventing the confirmed process for flow day 7/7/2000 from being completed...
Notice to Shippers July 5, 2000 at 10:24 a.m. Due to extremely high inventory on the Pacific Gas and Electric Company system, any new nominations placed in the Intraday 2 cycle will be cut to zero...
Check Boxes Check Out June 29, 2000 at 10:09 a.m. To provide easier access to more information, California Gas Transmission (CGT) has improved Pipe Ranger's System Inventory Status page...
TW Capacity Increase June 26-28, 2000 June 23, 2000 at 9:53 a.m. Transwestern interconnect at Topock will increase from Monday, June 26 through Wednesday, June 28...
Comprehensive Gas OII Settlement Agreement June 15, 2000 at 2:34 a.m. On May 18, 2000, the California Public Utilities Commission (CPUC) approved the Comprehensive Gas OII Settlement Agreement...
Free Gift With e-Billing! June 8, 2000 at 1:10 a.m. The CPUC just gave Pacific Gas and Electric Company's CGT the green light to provide e-Billing services...
Energy Statement Update June 6, 2000 at 12:05 p.m. On June 1, 2000, Pacific Gas and Electric Company changed the way Energy Statements for noncore end-use customers are distributed...
OFO Moved to Stage 2 May 26, 2000 at 10:51 a.m. In accordance with Rule 14, Pacific Gas and Electric Company increased the OFO for gas day 5/27/00 from Stage 1 to Stage 2...
Technical Difficulties Updating Pipe Ranger May 11, 2000 at 10:46 a.m. Pacific Gas and Electric Company is experiencing technical difficulties updating the Pipe Ranger's OFO Outlook Web Page...
Delayed Blast Page Notification April 17, 2000 at 3:28 a.m. Some customers received delayed Blast Page notification of a Customer-Specific OFO this morning...
Pipeline Status Data Available April 11, 2000 at 3:21 a.m. Pacific Gas and Electric Company's CGT Pipeline Status data is now available on Pipe Ranger...
EDI Implementation with Kern River Pipeline April 6, 2000 at 2:54 a.m. On April 13, 2000, Pacific Gas and Electric Company will implement Electronic Data Interchange (EDI) with Kern River Pipeline (KRP)...
Blast Page Test March 31, 2000 at 2:41 a.m. At 1:52 p.m. P.T. CGT sent registered Blast Page customers the following message...
Scheduled INSIDEtracc Enhancements March 21, 2000 at 2:18 a.m. Tonight, Monday, March 20, Pacific Gas and Electric Company will perform a scheduled maintenance/enhancement on INSIDEtracc...
Blast Paging Bugs March 21, 2000 at 2:13 a.m. Over the last few weeks, CGT has encountered some problems with OFO blast pages...
Pacific Gas and Electric Company Evaluates Shrinkage Rates March 10, 2000 at 12:07 p.m. Pacific Gas and Electric Company recently concluded an evaluation of its gas accounting for the period of March 1, 1998 through October 1, 1999...
Deals Direct March 2, 2000 at 11:30 a.m. California Gas Transmission announces a new service to bring the hottest deals in California straight to your e-mail box...
Transmission Customer Imbalances Febuary 15, 2000 at 10:57 a.m. The new market structure has come with a lot of new terminology, and customers have asked for more information...
INSIDEtracc Changes Febuary 9, 2000 at 1:17 a.m. CGT is pleased to announce changes to INSIDEtracc effective Wednesday, February 9...
Pipeline Inventory Limits Now In Place December 27, 1999 at 9:56 a.m. As a result of the Operational Flow Order Settlement Agreement, CGT is implementing changes to operating guidelines and gas tariffs applicable to gas transmission customers...
OFO Settlement Agreement Implementation December 17, 1999 at 9:52 a.m. CGT has started implementation of the OFO Settlement Agreement that was filed on October 22...
Shop Now for Best Selection December 1, 1999 at 4:31 a.m. PG&E's Golden Gate Market Center has space to park gas during December...
Four Nomination Cycles November 1, 1999 at 2:01 a.m. The Federal Energy Regulatory Commission (FERC) mandated four nomination cycles as of November 1...
Improvements to INSIDEtracc Nominations April 27, 1999 at 1:31 p.m. Good news! Placing nominations through PG&E's electronic nomination system is easier than ever...