Return to Advice Letter Index

2014 ADVICE FILING INDEX - ELECTRIC

Advice No.Date FiledTariff Sheet No.SubjectEffective DateDecision No.
4484-E
PDF
8/29/2014N/AAnnual Electric True-Up Filing - Change PG&E Electric Rates on January 1, 2015PendingE-4620
4482-E
PDF
8/29/2014N/ANotice of Federal Energy Regulatory Commission Rate Increase Filing (TO16)PendingN/A
4479-E
PDF
8/22/2014N/ANotice of Federal Energy Regulatory Commission Filing of Uncontested Settlement (TO15) and Approval of Interim RatesPendingN/A
4477-E
PDF
8/21/201434340 - 34344Revise Electric Preliminary Statement Part CZ - Distribution Revenue Adjustment Mechanism, in Compliance with Decision 14-08-012 Approving the Settlement Agreement between PG&E and TURN in Phase 2 of PG&E's Acquisition of the Hercules Municipal UtilityEffective
8/21/2014
Pending Final Disposition
14-08-012
4481-E
PDF
8/20/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Cooley Landing - Stanford 60kV Power Line Reconductor Project, in the Cities of Atherton and Menlo ParkPendingN/A
4480-E
PDF
8/20/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Kingsburg-Lemoore 70 kV Power Line Pole Replacement Project - (City of Hanford, County of Kings)PendingN/A
4451-E-A / 3492-G-A
PDF
8/20/2014N/ASupplemental: Revisions to Request of Pacific Gas and Electric Company for 2012 and 2013 Energy Efficiency Incentive AwardPending12-12-032 and 13-09-023
4478-E
PDF
8/15/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Contra Costa-Brentwood 230 kV Transmission Line Tower Relocations (City of Brentwood)PendingN/A
4476-E
PDF
8/14/2014N/AGrant of Easement to the City of Auburn - Request for Approval under Section 851PendingN/A
4378-E-A
PDF
8/14/201434333 - 34339Supplement: Establishment of the Customer Data Access Program for Release of Customer Interval Usage Data to Third Parties and the Associated Electric Rule 25, Release of Customer Data to Third PartiesEffective
8/14/2014
Pending Final Disposition
13-09-025
4352-E-B
PDF
8/11/2014N/ASupplemental: Procurement Transaction Quarterly Compliance Filing (Q4, 2013)Pending03-12-062 and 12-01-033
4473-E
PDF
8/8/2014N/AAmended and Restated Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between CalRENEW-1 LLC and PG&EPendingN/A
4409-E-A
PDF
8/8/2014N/ASupplemental: Procurement Transaction Quarterly Compliance Filing (Q1, 2014)Pending03-12-062
4475-E
PDF
8/5/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Kings River-Sanger-Reedley 115 kV Switch Replacement in the County of FresnoPendingN/A
4474-E
PDF
8/5/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Contra Costa-Moraga 230 Kilovolt Reconductoring Project in the County of Contra CostaPendingN/A
4472-E
PDF
8/5/2014N/AImplement Portions of Decision 14-06-037 (PG&E's 2012 Rate Design Window Proceeding) Related to PG&E's SmartRate and Peak Day Pricing ProgramsPending14-06-037
4471-E
PDF
8/5/2014N/AImplement Portions of Decision 14-06-037 (PG&E's 2012 Rate Design Window Proceeding) Related to Closing Non-Time-of-Use Rate Schedules to New Small and Medium Business and Agricultural CustomersPending14-06-037
4470-E
PDF
8/1/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Wilson-Merced #2 115 kV Power Line Pole Replacements Project in the County of MercedPendingN/A
4469-E
PDF
7/30/2014N/AProcurement Transaction Quarterly Compliance Filing (Q2, 2014)Pending12-01-033 and 03-12-062
4468-E / 3501-G
PDF
7/30/201434311 - 34320Establishment of the Data Request and Release Process for Providing Data to Entities Eligible to Request Access to Energy Data Pursuant to Decision 14-05-016Pending14-05-016
4466-E / 3500-G
PDF
7/30/201434321 - 34332Establishment of the Mobilehome Park Conversion Program in Compliance with Decision 14-03-021Pending14-03-021
4464-E / 3499-G
PDF
7/28/2014N/AImplementation of Energy Efficiency (EE) Finance Program Pilots in Compliance with Resolution E-4663PendingN/A
4328-E-A / 3441-G-A
PDF
7/28/201434300 - 34310Supplement: Revisions to Energy Efficiency Finance Program Energy Financing Line Item Charge (EFLIC) Pilot in Compliance with Decision 13-09-044 and Resolution E-4663PendingE-4663
4467-E
PDF
7/24/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Old River One Solar Interconnection Project (Kern County)PendingN/A
4465-E
PDF
7/18/2014N/AJoint Utilities Compliance Advice Filing Addressing Reporting Template for Demand Response Dispatch Exceptions Pursuant to Decision 14-05-025 Pending14-05-025
4463-E
PDF
7/18/2014N/AReporting Template and Timeline to Provide Feedback on PG&E's Experience with Bidding Demand Response Resources into CAISO's Wholesale Energy Market Pursuant to Decision 14-05-025Pending14-05-025
4456-E-A
PDF
7/18/201434279 - 34299Supplemental: Revisions to Electric Schedules E-BIP (Base Interruptiple Program) and E-DBP (Demand Bidding Program) in Compliance with Decision 14-05-025Pending14-05-025
4462-E
PDF
7/17/2014N/AHeadroom Account Closure and Other Headroom-Related Balancing Account ClosuresPendingE-4647
4461-E
PDF
7/17/2014N/AHeadroom Refund Reallocations8/16/2014E-4647
4460-E
PDF
7/16/201434257 - 34278Electric Rate Changes to Update Greenhouse Gas (GHG) Allowance Revenues for Eligible Small Business Customers8/1/201413-12-002
4458-E
PDF
7/10/201434247 - 34256Establish Electric Schedule PEVSP, Plug-In Electric Vehicle Submetering Pilot - Phase 1, and Associated Agreement Forms, in Compliance with Resolution E-46517/10/2014E-4651
4450-E-A
PDF
7/9/201434229 - 34246Supplemental: Electric Rate Changes for Summer 2014 Residential Rate Design Reform, Phase 2 of R.12-06-013, per D.14-06-0298/1/201414-06-029
4457-E
PDF
7/3/2014N/ARevision to Demand Response Aggregator Managed Portfolio Agreements in Compliance With Decision 14-05-025Effective
7/3/2014
Pending Final Disposition
14-05-025
4456-E
PDF
7/3/201434208 - 34228Revisions to Electric Schedules E-BIP (Base Interrutiple Program) and E-DBP (Demand Bidding Program) in Compliance With Decision 14-05-025Superceded14-05-025
4455-E
PDF
7/2/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Herdlyn-Balflour 60 kV Power Line Relocation Project in the City of Brentwood, Contra Costa County8/14/2014N/A
4454-E
PDF
7/2/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Centennial Corridor Power Line Relocation Project in the City of Bakersfield, County of KernPendingN/A
4453-E
PDF
7/2/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Sutter Home Winery Switching Station in the County of San Joaquin8/14/2014N/A
4452-E / 3493-G
PDF
7/2/201434199 - 34207Revisions to Gas and Electric Rules Consistent with Decision 14-06-0367/2/201414-06-036
4424-E-B / 3475-G-B
PDF
7/1/2014N/ASupplemental: Request to Increase Incentive Amount for SDG&E, SCG, SCE, and PG&E for Their California Advanced Home Program7/31/2014N/A
4451-E / 3492-G
PDF
6/30/2014N/ARequest of Pacific Gas and Electric Company for 2012 and 2013 Energy Efficiency Incentive AwardPending12-12-032 and D.13-09-023
4449-E / 3491-G
PDF
6/30/2014N/AAffiliate Transaction Rules Compliance PlanEffective
6/30/2014
Pending Final Disposition
06-12-029
4450-E
PDF
6/26/201434150 - 34198Electric Rate Changes for Summer 2014 Residential Rate Design Reform, Phase 2 of R.12-06-013, per D.14-06-0298/1/201414-06-029
4448-E / 3489-G
PDF
6/26/2014N/AAdd Eight New Sites to Hazardous Substance Mechanism7/26/201494-05-020
4445-E
PDF
6/25/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Le Grand-Chowchilla 115kV Reliability Project (Madera County, Merced County, and City of Chowchilla)7/25/2014N/A
4424-E-A / 3475-G-A
PDF
6/24/2014N/ASupplemental Data and Justification on the Incentive Structure Changes for the California Advanced Home Program Proposed for SDG&E, SCG, SCE and PG&ESupercededN/A
4447-E
PDF
6/23/2014N/AProposed Modifications to CSI Program Handbook to include more detailed and comprehensive low-income eligibility documentation standards for the MASH Program and remove language discussing MASH Track 2 incentives and process7/23/2014N/A
4446-E
PDF
6/23/2014N/AJoint Advice Filing of SCE, PG&E, and SDG&E Regarding NEM Interconnection Cost Categories Being Tracked Pursuant to Resolution E-4610 and D.14-05-0337/23/201414-05-033
4444-E
PDF
6/20/2014N/AJoint IOU Compliance Filing Pursuant to Decision 12-04-045 Addressing Whether There is a Need to Change the Current Baseline7/20/201412-04-045
4443-E / 3484-G
PDF
6/13/201434147 - 34149Agreement With California High-Speed Rail Authority for Future Relocation of PG&E's Facilities, in Accordance With General Order 96-B, Section 8.2.3PendingN/A
4442-E / 3483-G
PDF
6/11/2014N/ARequest to Remove Incentive Cap to Drive Deeper Savings for the Energy Upgrade California Advanced Home Upgrade Program of SDG&E, SoCalGas, SCE and PG&E7/11/201405-09-043
4441-E
PDF
6/10/2014N/APower Purchase and Sale Agreement for Bundled Energy Sales Between Tenaska Power Services Co. and Pacific Gas and Electric Company8/14/2014N/A
4093-E-A
PDF
6/10/2014N/ASupplemental: PeakChoice Transition Plan in Compliance with Decision 12-04-045Pending12-04-045
4439-E
PDF
6/9/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Vega Solar Switching Station Project in the County of Merced7/9/2014N/A
4437-E
PDF
6/9/201433943 - 34146Revisions to Incorporate a Distribution Group Study Process into Electric Rule 21 in Compliance with Decision 14-04-0037/9/201414-04-003
4440-E
PDF
6/6/2014N/ACentral Valley Ag Power, LLC Sole Customer Facility Sale - Request for Approval Under Section 8517/6/2014N/A
4438-E
PDF
6/6/2014N/AInformation-Only Filing Regarding Procurement Transaction Quarterly Compliance Reports for Quarter 4 of 2012 (Advice 4184-E), Quarter 1 of 2013 (4220-E) and Quarter 2 of 2013 (4266-E) – Revision of Confidentiality Periods Related to GHG InformationEffective
6/6/2014
Pending Final Disposition
N/A
4352-E-A
PDF
6/6/2014N/AProcurement Transaction Quarterly Compliance Filing (Q4 2013) - Supplemental FilingPendingN/A
4309-E-A
PDF
6/6/2014N/AProcurement Transaction Quarterly Compliance Filing (Q3 2013) - Supplemental Filing7/7/2014N/A
4436-E / 3482-G
PDF
6/5/201433940 - 33942Establish Gas Preliminary Statement Part DC, Energy Data Center Memorandum Account - Gas, and Electric Preliminary Statement Part GI, Energy Data Center Memorandum Account - Electric, Pursuant to Decision 14-05-0165/5/201414-05-016
4435-E / 3478-G
PDF
6/4/2014N/ARequest Authority to Use PG&E's Energy Efficiency 2013-2014 Program Funds to Increase Funds Available to the San Francisco Bay Area Regional Energy Network's Multifamily Program in 20146/13/2014N/A
4434-E / 3480-G
PDF
6/4/2014N/APost-Retirement Benefits Other Than Pensions (PBOPs) for the Period From 2011 to 20137/4/201411-05-018
4428-E-A
PDF
6/4/2014N/ASupplemental: Modifications to PG&E's Renewable Auction Mechanism Program Protocol and Appendices as Required by Resolution E-46555/29/2014E-4655
4433-E
PDF
6/2/2014N/ATaylor Fresh Vegetables, Inc. Sole Customer Facility Sale - Request for Approval Under Section 8517/2/2014N/A
4432-E
PDF
6/2/2014N/ASubmission of the Eighteenth Gas Supply Plan (GSP-18) for the California Department of Water Resources (CDWR) Tolling Agreements (November 1, 2014, Through September 18, 2015)11/1/201402-12-069 and 03-04-029
4431-E
PDF
6/2/2014N/AGrant of Easement for Elvee Drive Improvements in the City of Salinas - Request for Approval under Section 8518/14/2014N/A
4430-E / 3479-G
PDF
5/30/201433937 - 33939Revision to Electric and Gas Tariffs Associated with the California Energy Systems for the 21st Century Program Pursuant to Decision 14-03-029Effective
5/30/2014
Pending Final Disposition
14-03-029
4429-E
PDF
5/30/2014N/ASmart Grid Short Term Demand Forecasting Pilot Project - Phase 1 Status Report, Pursuant to Decision 13-03-0326/29/201413-03-032
4428-E
PDF
5/29/2014N/AModifications to PG&E's Renewable Auction Mechanism Program Protocol and Appendices as Required by Resolution E-46555/29/2014E-4655
4427-E
PDF
5/28/2014N/ARequest Authority to Use PG&E's Energy Efficiency 2013-2014 Program Funds to Increase Funds Available to the San Francisco Bay Area Regional Energy Network's Multifamily Program in 2014WithdrawnN/A
4423-E
PDF
5/27/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Pumpjack Solar Project Power Line Interconnection in County of KernPendingN/A
4422-E
PDF
5/27/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Wildwood Solar Project Power Line Interconnection in County of KernPendingN/A
4426-E
PDF
5/22/2014N/ADoyle Springs Conservation Easement Donation - Request for Approval under Decision (D.) 08-11-043, D.10-08-004 and Public Utilities Code Section 851PendingN/A
4425-E
PDF
5/21/2014N/ASale and Conveyance of a Certain Parcel of Land in Santa Barbara County – Request for Approval Under Section 8516/20/2014N/A
4424-E / 3475-G
PDF
5/21/2014N/AIncrease Incentive Amount for San Diego Gas & Electric Company, Southern California Gas Company, Southern California Edison Company and Pacific Gas and Electric Company for their California Advanced Home ProgramSupercededN/A
4421-E
PDF
5/20/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Maricopa West Solar Project Power Line Interconnection in the County of KernPendingN/A
4420-E
PDF
5/20/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of South Kern Solar Project Power Line Interconnection - (Kern County, P.No. 07185)PendingN/A
4419-E
PDF
5/19/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Adams East Solar Project Power Line Interconnection in the County of Fresno6/18/2014N/A
4418-E
PDF
5/19/201433897 - 33936Modification of Schedules NEM, NEMV, NEMVMASH pursuant to Decision (D.) 14-03-041 and Assembly Bill 3276/18/201414-03-041
4417-E / 3474-G
PDF
5/14/2014N/AProposed Modifications to Self-Generation Incentive Program Handbook to include revised capacity rating methodology for Pressure Reduction Turbines and Waste Heat to Power Technologies, and the inclusion of conventional topping cycle Steam Turbines.Pending11-09-015
4416-E
PDF
5/12/2014N/ASubmittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance With D.13-01-021, D.13-02-017, and D.13-04-0016/11/201413-01-021, 13-02-017 and 13-04-001
4415-E / 3473-G
PDF
5/9/201433894 - 33896Establish the Gas Preliminary Statement Part DB, Mobile Home Park Balancing Account - Gas and the Electric Preliminary Statement Part GH, Mobile Home Park Balancing Account - Electric, Pursuant to Decision 14-03-021 6/8/201414-03-021
4412-E
PDF
5/8/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION 115 KV POWER LINE in County of San Joaquin County, the City of Stockton6/7/2014N/A
4413-E
PDF
5/7/201433890 - 33893Revision to Electric Preliminary Statement Part EL - Renewables Portfolio Standard Cost Memorandum Account (RPSCMA)5/7/201414-05-002
4414-E
PDF
5/6/2014N/ARequest Approval of the Disbursement of Funds from the Humboldt Bay Power Plant Unit 3 Nuclear Decommissioning Trusts6/5/201414-02-024 and 11-07-003
4411-E
PDF
5/5/201433883 - 33889Revisions to Electric Rate Schedule LS-2, Customer-Owned Street and Highway Lighting, for Comparable Street Light TechnologiesPendingN/A
4408-E
PDF
5/5/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Kent South Solar Project Power Line Interconnection in the County of Kings6/4/2014N/A
4407-E
PDF
5/5/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of RE Kansas LLC Solar Project Interconnection to the Henrietta-GWF 115kV Power Line, Kings County6/4/2014N/A
4410-E
PDF
5/2/201433880 - 33882Revisions to Vegetation Management Balancing Account (VMBA) - Electric Preliminary Statement Part BU6/1/2014N/A
4406-E / 3471-G
PDF
5/1/201433842 - 33879Revised Household Income Requirements and Categorical Programs for California Alternate Rates for Energy (CARE) and Family Electric Rate Assistance (FERA) Programs6/1/2014N/A
4409-E
PDF
4/30/2014N/AProcurement Transaction Quarterly Compliance Filing (Q1 2014)PendingN/A
4405-E
PDF
4/30/201433730 - 33841May 1, 2014 Electric Rates and Tariffs Changes5/1/2014N/A
4404-E
PDF
4/30/2014N/A2013 Vegetation Management Balancing Account5/30/2014N/A
4403-E
PDF
4/25/2014N/AElectric Rate Changes to Introduce GHG Allowance Costs and GHG Allowance Revenues5/1/201412-12-033, 13-12-002, 13-12-003, 13-12-041
4402-E
PDF
4/25/2014N/ACalifornia Energy Systems for the 21st Century Proposed Research and Development Projects and Cooperative Research and Development AgreementPending12-12-031 and 14-03-029
4399-E
PDF
4/22/2014N/AUpdate to PG&E's 2014 Revenue Requirements for the Hercules Municipal Utility Assets4/10/2014N/A
4398-E
PDF
4/21/2014N/APacific Gas and Electric Company's 2013 Renewables Portfolio Standard Shortlist Report8/14/2014N/A
4401-E
PDF
4/18/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Arcata-Humboldt 60 kV Power Line Replacement in the City of Arcata, County of Humboldt5/18/2014N/A
4392-E
PDF
4/18/2014N/AGrant of Easement to the Sacramento and San Joaquin Drainage District, acting by and through the Central Valley Flood Protection Board, for Levee Construction in Sacramento County – Request for Approval under Section 8517/10/2014N/A
4400-E
PDF
4/15/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of McMullin-Kearney 230kV Reconductoring Project, County of Fresno6/9/2014N/A
4393-E
PDF
4/14/2014N/ATermination of Annual Advice Letter for Calculation of Non-Bypassable Charges for Mountain House Customers (Modesto Irrigation District)5/14/201404-03-036
4397-E
PDF
4/11/2014N/AUpdated Consumer Risk Tolerance ("CRT") Level in Pacific Gas and Electric Company’s Bundled Procurement Plan4/11/2014N/A
4396-E
PDF
4/11/2014N/ALimited One Time Agreement to Perform Tariff Scheduled Related Work for the University of California4/11/2014N/A
4391-E
PDF
4/8/2014N/AModification to Existing Easement Agreement for a Traffic Loop Detection System at PG&E's Eureka Service Center – Request for Approval under Section 8515/8/2014N/A
4395-E
PDF
4/3/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Lost Hills Solar Project Interconnection to the Arco-Carneras 70 kV Power Line in the County of Kern5/3/2014N/A
4394-E
PDF
4/3/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Lakeville-Petaluma C 60 kV Power Line Relocation, Sonoma County5/3/2014N/A
4361-E-A
PDF
4/2/201433694 - 33726Supplemental: Modifications to Direct Participation Demand Response Rule 24 and Related Documents in Compliance with Resolution E-46303/3/2014E-4630
4386-E
PDF
4/1/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Fulton-Molino-Cotati 60kV Power Line Relocation Project in the City of Santa Rosa, County of Sonoma5/1/2014N/A
4348-E / 3467-G
PDF
4/1/201433671 - 33693Clean-Up of Gas and Electric Tariffs5/1/2014N/A
4390-E
PDF
3/28/2014N/A2014 Energy Resource Recovery Account Trigger Amount4/1/201402-10-062, 04-01-050, and 04-12-048
4389-E
PDF
3/28/2014N/ADiablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter3/28/201488-12-083 and Resolution E-3152
4388-E / 3466-G
PDF
3/28/2014N/AAdd Nine New Sites to Hazardous Substance Mechanism4/27/201494-05-020
4387-E
PDF
3/28/2014N/AElectric Rates Adjustments5/1/2014N/A
4384-E
PDF
3/28/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the NEWARK-MILPITAS No. 1 115 kV and DIXON LANDING - MCKEE 115 kV Power Line BART INTERCONNECTION - in the City of Milpitas, County of Santa Clara4/27/2014N/A
4385-E / 3465-G
PDF
3/27/2014N/ANotification of Implementer Closure of 2013-2014 Energy Efficiency Portfolio Third Party Subprogram3/27/2014N/A
4383-E
PDF
3/26/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Kent South Switching Station and Solar Project Interconnection in the County of Kings4/25/2014N/A
4382-E
PDF
3/24/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Paramount Farms Firebaugh Substation Interconnection to the Gill Ranch 115 kV Tap, County of Madera5/23/2014N/A
4381-E / 3462-G
PDF
3/24/2014N/AIncrease in Incentive Levels for Statewide Measures Offered in PG&E's Commercial, Industrial, Agricultural and Residential Energy Efficiency Programs4/23/201405-09-043
4380-E
PDF
3/24/201433668 - 33670Modification to Agricultural Account Aggregation Study Memorandum Account, Electric Preliminary Statement Part FV, in Compliance with Decision 14-03-0023/13/201414-03-002
4379-E
PDF
3/21/2014N/ASubmittal of Humboldt Bay Power Plant Unit 3 Nuclear Decommissioning Trust Fund Disbursement Spreadsheet in Compliance with Decision (D.) 14-02-0243/21/201414-02-024
4375-E
PDF
3/19/2014N/ANarrows Land Donation - Request for Approval under Decision (D.) 08-11-043, D.10-08-004 and Public Utilities Code Section 851PendingN/A
4378-E
PDF
3/18/201433661 - 33667Establishment of the Customer Data Access Program for Release of Customer Interval Usage Data to Third Parties and the Associated Electric Rule 25, Release of Customer Data to Third PartiesPending13-09-025
4377-E
PDF
3/18/2014N/AApproval of Pacific Gas and Electric Company's Power Purchase Agreement with Midway Sunset Cogeneration Company for Procurement of Combined Heat and Power Energy and CapacityPendingN/A
4376-E
PDF
3/14/2014N/AApproval of Pacific Gas and Electric Company's Power Purchase Agreements with Badger Creek Limited, Bear Mountain Limited, Chalk Cliff Limited, Live Oak Limited and McKittrick Limited for Procurement of Combined Heat and Power Energy and CapacityPendingN/A
4373-E
PDF
3/12/2014N/AReappointment of DeWitt F. Bowman to PG&E’s Nuclear Decommissioning Trust Fund Committee4/11/201487-05-062, E-3048, 13-01-039
4374-E
PDF
3/7/201433658 - 33660Request to Establish the Hercules Safety and Service Enhancements Memorandum Account4/6/2014N/A
4372-E
PDF
3/7/201433655 - 33657Revisions To Electric Schedule DA-CRS, Direct Access Cost Responsibility Surcharge, In Compliance With Decision (D.) 12-04-0124/1/201412-04-012
4312-E-A
PDF
3/6/2014N/ASupplemental Filing: Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance With D.13-01-021, D.13-02-017, and D.13-04-0014/5/201413-01-021, 13-02-017, 13-04-001
4369-E
PDF
3/4/201433650 - 33654Modification of Schedule NEM Interconnection Forms3/4/2014N/A
4318-E-B
PDF
3/4/2014N/ASecond Supplement: Additional Information to Update Sample Customer Bills to Reflect GHG Revenue Return in Compliance With Resolution E-4611 and Administrative Law Judge's Ruling Providing Clarification on Customer Education and Outreach ActivitiesPendingN/A
4371-E
PDF
2/28/2014N/AElectric Rate Changes to Introduce GHG Allowance Costs and GHG Allowance RevenuesRejected13-12-041
4370-E
PDF
2/28/201433540 - 33649March 1, 2014 Electric Rate Changes3/1/2014N/A
4368-E
PDF
2/28/2014N/AModifications to the Photovoltaic (PV) Program Solicitation Protocol and Power Purchase AgreementsPendingN/A
4366-E / 3461-G
PDF
2/28/2014N/ARequest for Approval to Close 2013-2014 Energy Efficiency Portfolio Third Party Subprograms7/8/2014N/A
4365-E
PDF
2/27/2014N/AModifications to PG&E's Renewable Auction Mechanism Program Protocol and Appendices Pursuant to Decision 10-12-0485/15/2014N/A
4367-E
PDF
2/25/2014N/APower Purchase Agreement for Procurement of an Eligible Renewable Energy Resource between CA Flats Solar 150, LLC and Pacific Gas and Electric CompanyPendingN/A
4364-E
PDF
2/20/2014N/APower Purchase Agreements for Procurement of Eligible Renewable Energy Resources between Sand Hill Wind II, LLC and Pacific Gas and Electric CompanyPendingN/A
4360-E
PDF
2/20/2014N/AGrant of Easement to Contra Costa Water District in the City of Concord - Request for Approval Under Section 851WithdrawnN/A
4229-E-A
PDF
2/20/201433491 - 33505Supplemental Filing: Revisions to Electric Rule 22 - Direct Access and Electric Rule 22.1 - Direct Access Switching Exemption Rules, and the Submittal of ESP Financial Security Requirements in Compliance With D.13-01-021, D.13-02-017, and D.13-04-0013/22/201413-01-021, 13-03-017, 13-04-001
4363-E
PDF
2/19/2014N/APower Purchase Agreement for Procurement of an Eligible Renewable Energy Resource between 83WI 8ME, LLC and Pacific Gas and Electric Company8/28/2014N/A
4362-E
PDF
2/18/2014N/APower Purchase Agreement for Procurement of an Eligible Renewable Energy Resource between Diablo Winds, LLC and Pacific Gas and Electric CompanyPendingN/A
4361-E
PDF
2/18/201433506 - 33539Modifications to Direct Participation Demand Response Rule 24 and Related Documents in Compliance with Resolution E-46303/3/2014E-4630
4359-E
PDF
2/13/2014N/AModifications to Exhibit A of the Existing Agreement with the San Francisco Bay Area Rapid Transit District ("BART")3/15/2014N/A
4358-E
PDF
2/10/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of West Fresno-California Ave 115 kV Power Line Pole Replacement Project in the City of Fresno, County of Fresno3/12/2014N/A
4357-E
PDF
2/7/2014N/ACalifornia State Route 299 Road Easement Agreement (Shasta County) – Request for Approval under Section 8513/9/2014N/A
4355-E
PDF
2/7/2014N/APower Purchase Agreement for Procurement of an Eligible Renewable Energy Resource between RE Astoria, LLC and Pacific Gas and Electric CompanyPendingN/A
4125-E-A
PDF
2/7/2014N/ASupplemental: Customer Online Price, Usage and Cost Information and Providing Wholesale Prices Per Resolution E-453010/15/2012N/A
4356-E
PDF
2/6/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of RIO OSO-LINCOLN 115 KV POWER LINE RELOCATION PROJECT in the City of Lincoln, Placer County 5/19/2014N/A
4351-E
PDF
2/5/2014N/APacific Gas and Electric Company's Power Purchase Agreement with Chevron Products Company for Procurement of As-Available Energy and Capacity6/26/2014N/A
4318-E-A
PDF
2/3/2014N/ASupplemental: Additional Information to Update Sample Customer Bills to Reflect Greenhouse Gas Revenue Return in Compliance With Resolution E-4611 and Administrative Law Judge's Ruling Providing Clarification on Customer Education and Outreach ActivitiesPendingN/A
4354-E / 3452-G
PDF
1/31/2014N/AAnnual Joint Tier 2 Advice Letter Submitting Updated List of Proposed Categorical Eligible Low Income Programs for the Upcoming Year in Compliance with Decision 12-08-0443/3/2014N/A
4353-E
PDF
1/31/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Radum-Vallecitos 60 kV Power Line Relocation Project in the City of Livermore, County of Alameda3/2/2014N/A
4352-E
PDF
1/30/2014N/AProcurement Transaction Quarterly Compliance Filng (Q4 2013)Pending12-01-033 and 03-12-062
4347-E
PDF
1/29/2014N/ARequest Funding to Implement Line Item Billing for Marin Clean Energy's Energy Efficiency Financing Pilots Approved in Decision 12-11-0152/27/201412-11-015
4346-E
PDF
1/29/201433486 - 33490Modifications to the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from the Renewable Market Adjusting ProgramRejected13-11-024
4350-E
PDF
1/24/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Mendota Substation Expansion for the North Star Solar Project Interconnection in the County of Fresno2/23/2014N/A
4349-E
PDF
1/22/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Cortina #3 60 KV Power Line Pole Replacement Project in the City of Colusa (Colusa County)2/14/2014N/A
4313-E-B
PDF
1/22/2014N/ASecond Supplemental Filing for the Advice Letter Filing of PG&E's Fourth Renewable Auction Mechanism Power Purchase Agreement1/12/2014N/A
4343-E
PDF
1/21/2014N/ASouthern California Edison Company, San Diego Gas & Electric Company and Pacific Gas and Electric Company request to implement a Plug-In Electric Vehicle Sub-Metering Pilot in Compliance With Decision 13-11-0026/26/201413-11-002
4345-E / 3449-G
PDF
1/17/2014N/AAdd Eight New Sites to Hazardous Substance Mechanism2/16/2014N/A
4305-E-A
PDF
1/16/201433464 - 33485Supplement -- Revise Electric Rate Schedule NEM and Establish a New Electric Sample Form for NEM for Load Aggregation Pursuant to Senate Bill 594 and Resolution E-46102/20/2014SB 594 and E-4610
4344-E
PDF
1/13/2014N/ANotice of the Transmission Access Charge Balancing Account Adjustment ("TACBAA") Filing with the Federal Energy Regulatory Commission2/12/2014N/A
4342-E / 3444-G
PDF
1/6/201433447 - 33449Request for One-Year Extension to Pacific Gas and Electric Company's Bill Relief Program for Customers Affected by the San Bruno Accident2/1/2014N/A
4341-E
PDF
1/3/2014N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Gates-Tulare Lake 70 kV Power Line Pole Replacement Project in the County of Fresno2/2/2014N/A

Go to top 

For further tariff information, or Web Tariff Book suggestions please send an email to Tariffs.

  • Climate Smart
  • Employee Volunteers
  • Environmental Leadership