| Advice No. | Date Filed | Tariff Sheet No. | Subject | Effective Date | Decision No. |
|---|---|---|---|---|---|
| 3986-E | 12/30/2011 | 31145 - 31154 | Revisions to PG&E's Direct Access Rule 22.1 - Direct Access Service Switching Rules, Form 79-1117, 6-Month Notice to Transfer to Direct Access Service, and Form 79-1011, Notice to Return to PG&E Bundled Service, in Compliance With Decision 11-12-018 | 1/1/2012 | 11-12-018 |
| 3945-E-A | 12/30/2011 | 31140 - 31144 | Supplement - Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance With D.05-06-016 | 1/1/2012 | 05-06-016 |
| 3896-E-B | 12/30/2011 | 30965 - 31139 | Supplemental Filing - Annual Electric True-Up Filing - Change PG&E Electric Rates on January 1, 2012 | 1/1/2012 | E-4432 |
| 3985-E / 3269-G | 12/29/2011 | N/A | Pacific Gas and Electric Company (PG&E) submits this advice letter to request recovery of $37.5 million in rates associated with previously authorized Self-Generation Incentive Program (SGIP) funding not yet included in rates for recovery. | 1/28/2012 | 09-12-047 |
| 3984-E | 12/29/2011 | 30933 - 30964 | Revisions to Electric Rule 23 - Community Choice Aggregation Service | 5/11/2012 | N/A |
| 3983-E | 12/29/2011 | 30871 - 30932 | Revisions to Electric Rule 22 - Direct Access and the Submittal of Electric Service Provider (ESP) Financial Security Requirements in Compliance With Decision (D.) 11-12-018 | Pending | 11-12-018 |
| 3981-E | 12/29/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Waukena Switching Station and Solar Project Interconnection in the City of Corcoran, County of Kings | 1/28/2012 | N/A |
| 3980-E | 12/28/2011 | 30868 - 30870 | Agricultural Account Aggregation Study Memorandum Account Preliminary Statement Part FV in Compliance with Decision 11-12-053 in PG&E's 2011 General Rate Case, Phase 2 | 1/1/2012 | 11-12-053 |
| 3979-E | 12/28/2011 | N/A | Notice of the Transmission Access Charge Balancing Account Adjustment ("TACBAA") Filing With the Federal Energy Regulatory Commission | 1/30/2012 | N/A |
| 3978-E | 12/27/2011 | N/A | Revisions to the Amendment to an Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between DG Fairhaven Power LLC and Pacific Gas and Electric Company | 3/19/2012 | N/A |
| 3977-E | 12/22/2011 | N/A | Installation of a Traffic Loop Detection System at PG&E's Eureka Service Center - Request for Approval Under Section 851 | 2/23/2012 | N/A |
| 3976-E | 12/22/2011 | 30834 - 30847 | Creating New Electric Program Investment Charge (EPIC) Balancing Account (Preliminary Statement Part FU) and Revisions to Public Purpose Program Balancing Accounts in Compliance With Decision 11-12-035 and Decision 11-12-038 | 1/1/2012 | 11-12-035,11-12-038 |
| 3972-E / 3268-G | 12/22/2011 | N/A | Southern California Edison, Southern California Gas, San Diego Gas & Electric and Pacific Gas & Electric Request to implement a Multifamily Energy Upgrade California Pilot Program within the 2010-2012 Energy Efficiency Portfolio | Superceded | 09-09-047, D.10-12-054 |
| 3975-E | 12/21/2011 | 30805 - 30807 | Change to Electric Schedule LS-1, PG&E-Owned Street and Highway Lighting | 2/28/2013 | E-4547, 83-12-068 |
| 3951-E-A | 12/20/2011 | 30712 - 30720 | Supplemental: Modifications to Advice Letter 3951-E: Revised Schedule S, "Standby Service," Special Condition 15 for Customers Under California Independent System Operator (CAISO) Station Power Protocol in Compliance With FERC Order on Remand | Pending | N/A |
| 3902-E-B | 12/20/2011 | 30848 - 30867 | Supplemental Filing for Schedule NEMV Pursuant to Decision (D.) 11-07-031, Ordering Paragraph 2 | Superceded | N/A |
| 3974-E | 12/19/2011 | N/A | Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Burney Forest Products and Pacific Gas and Electric Company | 5/24/2012 | N/A |
| 3973-E | 12/19/2011 | N/A | Revise Rates and Tariffs in Compliance With Decision 11-12-053 in PG&E's 2011 General Rate Case, Phase 2, Non-Residential Rate Design Revisions | 1/1/2012 | 11-12-053 |
| 3971-E | 12/16/2011 | 30824 - 30833 | Pacific Gas and Electric Company's Contract and Tariff for the Purchase of Excess Electricity From Eligible Combined Heat and Power Systems Under 500 kW | 5/24/2012 | 09-12-042 |
| 3970-E | 12/15/2011 | 30808 - 30823 | Pacific Gas and Electric Company's Standard and Simplified Contracts and Tariffs for Purchase of Excess Electricity From Eligible Combined Heat and Power Systems in Compliance With Resolution E-4424 and Decision 10-12-055 | 12/15/2011 | E-4424, 10-12-055 |
| 3969-E | 12/13/2011 | 30771 - 30804 | Modification of PG&E Rate Schedules NEM, NEMV, NEMFC and NEMBIO and Associated Forms Pursuant to Senate Bill 489 | 1/1/2012 | N/A |
| 3968-E / 3264-G | 12/9/2011 | N/A | Proposed Amendments to the California Solar Initiative Thermal Program Handbook | 1/8/2012 | N/A |
| 3964-E | 12/8/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Contra Costa-Shell 60 kV Power Line Tower Replacement Project, Phase III, in the City of Antioch | 1/7/2012 | N/A |
| 3967-E / 3263-G | 12/7/2011 | 30766 - 30770 | Consolidation of Gas and Electric Tariffs | 12/7/2011 | N/A |
| 3965-E | 12/7/2011 | 30759 - 30765 | Modifications to the Tariffs and Standard Contracts for the Purchase of Eligible Renewable Generation From Public Water and Wastewater Facilities and Small Renewable Generators | 1/3/2012 | E-4442 |
| 3966-E | 12/2/2011 | N/A | Routine Annual Advice Filing for Dedicated Rate Component Series 1 and Series 2 Charge True-Up Mechanism | 1/1/2012 | 04-11-015 |
| 3963-E | 12/1/2011 | 30752 - 30758 | Modification of Schedule RES-BCT Pursuant to Assembly Bill 512 | 1/1/2012 | N/A |
| 3961-E | 12/1/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Solar Project Solutions Alpaugh and Atwell Interconnection Facilities (Tulare County) | 1/3/2012 | N/A |
| 3960-E | 12/1/2011 | 30743 - 30748 | Revisions to PG&E's Community Choice Aggregation and Direct Access Tariffs to Facilitate the Exchange of Customer Information Between Community Choice Aggregators and Pacific Gas and Electric Company in Compliance With Resolution E-4420 | 12/1/2011 | E-4420 |
| 3962-E | 11/30/2011 | N/A | Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Collins Pine Company and Pacific Gas and Electric Company | 4/1/2012 | N/A |
| 3959-E | 11/30/2011 | 30749 - 30751 | Modification of Electric Rate Schedule Transitional Bundled Commodity Cost (TBCC) to Align With the California Independent Systems Operator's (CAISO) Changes to the Grid Management Charge (GMC) | 1/1/2012 | N/A |
| 3958-E / 3261-G | 11/29/2011 | 30741 - 30742 | Notice to Terminate ClimateSmart(TM) Gas Schedule G-CS and Electric Schedule E-CS | 1/1/2012 | N/A |
| 3957-E | 11/28/2011 | 30728 - 30740 | Modifications to Schedule NEMVMASH to Combine Revisions Approved in Advice Letters 3870-E (AB920) and Advice Letter 3890-E (MASH VNEM) | 11/28/2011 | N/A |
| 3956-E | 11/28/2011 | N/A | SmartMeter(TM) Home Area Network (HAN) Implementation Plan | Superceded | 11-07-056 |
| 3953-E | 11/23/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the High Winds and Montezuma I & II Wind Projects 230 kV Interconnecting Lines Relocation Project, County of Solano | 12/23/2011 | N/A |
| 3955-E | 11/21/2011 | 30725 - 30727 | New PG&E Interconnection Agreement For an Existing Small Generating Facility Interconnecting to the Distribution System Under Rule 21 | 3/8/2012 | E-4477 |
| 3954-E / 3258-G | 11/21/2011 | 30721 - 30724 | Request to Establish the Low Income 2012 Memorandum Account and to Update PG&E's Energy Savings Assistance Program and California Alternate Rates for Energy Budget Allocations for the 2012 Bridge Funding Period | 1/1/2012 | N/A |
| 3952-E | 11/18/2011 | N/A | Update to Pacific Gas and Electric Company's Conformed 2006 Long-Term Procurement Plan - Brokerages and Exchanges Listing | 12/19/2011 | N/A |
| 3951-E | 11/18/2011 | 30712 - 30720 | Revised Schedule S, "Standby Service," Special Condition 15 for Customers under California Independent System Operator (CAISO) Station Power Protocol in Compliance With FERC Order on Remand | Superceded | N/A |
| 3950-E | 11/18/2011 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook | 2/16/2012 | 06-08-028 |
| 3949-E | 11/16/2011 | N/A | Second Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between HL Power Company and Pacific Gas and Electric Company | 4/26/2012 | N/A |
| 3948-E | 11/16/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Exchequer-Yosemite 70kV Power Line Project, County of Mariposa | 12/16/2011 | N/A |
| 3947-E | 11/15/2011 | N/A | Aegis Retail One, LLC Floor Lease at 77 Beale Street - Request for Approval Under Section 851 | 12/30/2011 | N/A |
| 3946-E | 11/15/2011 | N/A | Implementation of Residential Rate Changes Authorized By Changes in Public Utilities Code Sections 739.1 and 739.9 | 12/14/2011 | 09-12-048 |
| 3945-E | 11/15/2011 | N/A | Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-016 | 1/1/2012 | N/A |
| 3944-E | 11/14/2011 | N/A | Fourth Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Eel River Power, Inc., and Pacific Gas and Electric Company | 4/19/2012 | N/A |
| 3934-E-A / 3251-G-A | 11/14/2011 | 30709 - 30711 | Supplemental Filing to Add Form 79-1096 to Advice Letter 3251-G/3934-E, "Revisions to PG&E's Gas and Electric Tariffs Per Decision 11-07-056" | Rejected | N/A |
| 3943-E | 11/10/2011 | N/A | Proposed Model Protective Order and Model Nondisclosure Agreement Pursuant to Decision 11-07-028 | Pending | 11-07-028 |
| 3942-E | 11/9/2011 | N/A | Methodology for Calculation of Non-Bypassable Charges for Mountain House Customers (Modesto Irrigation District) | 12/9/2011 | 04-03-036 |
| 3344-E-A / 2958-G-A | 11/9/2011 | 30705 - 30708 | Supplemental: Modifications to ClimateSmart(TM) Charity Servicing Agreement and Revisions to Gas and Electric ClimateSmart Balancing Accounts | 12/15/2011 | G-3429 |
| 3941-E | 11/7/2011 | 30701 - 30704 | Revise Schedule EL-A7 Rates in Compliance With Decision 11-05-047 in PG&E's 2011 General Rate Case, Phase 2 | 11/1/2011 | 11-05-047 |
| 3940-E / 3253-G | 11/7/2011 | N/A | Proposed Revisions to the Self-Generation Incentive Program Handbook to Implement Decision (D.) 11-09-015: Implementation of the Hybrid-Performance-Based-Incentive Payment Structure; Metering and Monitoring Protocols; Other Amendments | 3/22/2012 | 11-09-015 |
| 3938-E | 11/7/2011 | N/A | 2011 Renewables Portfolio Standard Shortlist Report | Pending | N/A |
| 3937-E | 11/4/2011 | N/A | Anniversary True-up Mechanism Advice Filing for Dedicated Rate Component Series 2005-1 and 2005-2 Charges | 11/4/2011 | 04-11-015 |
| 3939-E | 11/3/2011 | N/A | Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Revenue Balancing Account Adjustment, the Reliability Services Rates and the End-Use Customer Refund Balancing Account Adjustment | 12/14/2011 | Resolution E-3930 |
| 3936-E | 11/2/2011 | 30697 - 30700 | Clarification to Rate Schedule E-DCG Regarding Certain Non-Net Energy Metered Generating Facilities | 12/2/2011 | N/A |
| 3935-E | 10/31/2011 | N/A | Procurement Transaction Quarterly Compliance Filing (Q3, 2011) | 6/18/2012 | 03-12-062 |
| 3934-E / 3251-G | 10/27/2011 | 30690 - 30696 | Revisions to PG&E's Gas and Electric Tariffs Per Decision 11-07-056 | Rejected | 11-07-056 |
| 3896-E-A | 10/26/2011 | N/A | Supplement to Annual Electric True-Up Filing - Change PG&E Electric Rates on January 1, 2012 | 1/1/2012 | E-4432 |
| 3852-E-B / 3212-G-B | 10/24/2011 | N/A | Additional Supplemental Joint Filing: 2010-2012 Statewide Workforce Education and Training (WE&T) Program Modifications Based on Findings of WE&T Needs Assessment | 10/29/2011 | N/A |
| 3933-E | 10/21/2011 | N/A | Grant of Trail Easements to U.S. Forest Service in Tuolumne County - Request for Approval Under Section 851 | 2/23/2012 | N/A |
| 3931-E | 10/21/2011 | N/A | Agreement for Purchase and Sale of Uranium Between Pacific Gas and Electric Company and BHP Billiton Olympic Dam Corporation Pty Ltd. | 4/19/2012 | E-4480 |
| 3859-E-A / 3216-G-A | 10/21/2011 | 30686 - 30689 | Supplemental Filing to Establish Tax Act Memorandum Accounts (TAMA-E and TAMA-G) per CPUC Resolution No. L-411 | 4/14/2011 | Resolution L-411A |
| 3932-E | 10/20/2011 | N/A | Request for Approval of a Disbursement of Funds from the Humboldt Bay Power Plant Unit 3 Nuclear Decommissioning Trusts | 11/21/2011 | N/A |
| 3930-E | 10/18/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of San Mateo-Bay Meadows 115 kV Reconductoring Project in the Cities of San Mateo, Foster City, and Redwood City, County of San Mateo | 11/7/2011 | N/A |
| 3508-E-B | 10/17/2011 | 30190 - 30197 | Modifications to Electric Rule 21 Pursuant to Resolution E-4411 | 9/22/2011 | E-4411 |
| 3929-E / 3248-G | 10/14/2011 | 30655 - 30685 | Clean-Up of Gas and Electric Tariffs | 11/14/2011 | N/A |
| 3928-E | 10/14/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of GWF Tracy Interconnection Project, in the County of San Joaquin | 11/13/2011 | N/A |
| 3927-E | 10/14/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Holly Sugar Sports Park 115 KV Power Line Relocation in the City of Tracy and San Joaquin County | 11/13/2011 | N/A |
| 3926-E | 10/14/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Merced-Merced Falls 70kV Power Line Relocation - Bellevue High School (City of Merced) | 11/13/2011 | N/A |
| 3921-E-A | 10/14/2011 | N/A | Supplemental Filing - Amendments to 5 Existing QF PPA's for Procurement of Eligible Renewable Energy Resources Bet. Covanta Mendota, L.P., Rio Bravo Fresno, Rio Bravo Rocklin, Pacific Ultra-Power Chinese Sta., Wheelabrator Shasta Energy Co. Inc., and PG&E | 2/29/2012 | N/A |
| 3917-E-A | 10/14/2011 | N/A | Supplemental Filing for the Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Pacific Oroville Power, Inc. and Pacific Gas and Electric Company | 2/16/2012 | N/A |
| 3925-E / 3247-G | 10/13/2011 | N/A | Southern California Edison and Pacific Gas and Electric Request to Provide Stand-Alone Solar-Powered Water Circulators as a Measure in the 2010-2012 Energy Efficiency Portfolio | 11/12/2011 | 09-12-022 |
| 3924-E | 10/12/2011 | N/A | Proposed California Solar Initiative (CSI) Inspection Plan | 11/11/2011 | 11-07-031 |
| 3902-E-A | 10/11/2011 | 30652 - 30654 | Supplemental Filing for Schedule NEMV Pursuant to Decision (D.) 11-07-031, Ordering Paragraph 2 | Superceded | 11-07-031 |
| 3923-E / 3245-G | 10/10/2011 | N/A | Proposed Revisions to the Self-Generation Incentive Program Handbook to Implement Decision (D.) 11-09-015 | 11/9/2011 | D.11-09-015 |
| 3922-E | 10/6/2011 | 30645 - 30651 | Request for Establishment of a New System Generation Balancing Account and Modification to the ERRA Preliminary Statement | 11/23/2011 | 07-09-044,10-12-035 |
| 3921-E | 10/6/2011 | N/A | Amendments - 5 Existing QF PPAs for Procurement of Eligible Renewable Energy Resources Bet. Covanta Mendota, LP, Rio Bravo Fresno, Rio Bravo Rocklin, Pacific Ultra-Power Chinese Station, Wheelabrator Shasta Energy Company, Inc., and PG&E | 2/29/2012 | N/A |
| 3920-E | 10/5/2011 | N/A | Implementation of PG&E's Annual Revenue Requirement Adjustments for the Fuel Cell Project & Photovoltaic Program and 2011-2013 Revenue Requirement Adjustment for Incremental Income Taxes Associated With Accelerated Amortization of Electromechanical Meters | 8/17/2011 | 10-04-028, 10-04-052, 11-05-018 |
| 3919-E / 3241-G | 10/5/2011 | 30642 - 30644 | Implementation of PG&E's 2012 Revenue Requirement Adjustments for the 2011 General Rate Case Attrition, Pension, Cornerstone Improvement Project and Diablo Canyon Seismic Studies | 1/1/2012 | 11-05-018, 09-09-020,10-06-048,10-08-003 |
| 3918-E | 10/3/2011 | N/A | Road Access Easement in Santa Clara County - Request for Approval Under Section 851 | 12/30/2011 | N/A |
| 3917-E | 10/3/2011 | N/A | Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Pacific Oroville Power, Inc., and Pacific Gas and Electric Company | 2/16/2012 | N/A |
| 3916-E | 9/30/2011 | 30639 - 30641 | Revisions to Electric Form 79-1130 | 9/30/2011 | N/A |
| 3915-E | 9/30/2011 | N/A | Recovery of Long-Term Procurement Plan Technical Assistance Memorandum Account (LTAMA) Costs through PG&E's Energy Resource Recovery Account | 10/31/2011 | N/A |
| 3914-E / 3239-G | 9/29/2011 | 30636 - 30638 | Request for One-Year Extension and Clarification to Pacific Gas and Electric Company's Bill Relief Program for Customers Affected by the San Bruno Accident | 2/1/2012 | N/A |
| 3913-E | 9/28/2011 | N/A | Contract Amendments in Compliance With Resolution E-4415 Approving Two Contracts for Procurement of Renewable Energy Resources between Pacific Gas and Electric Company ("PG&E") and Potrero Hills Energy Producers, LLC, and Sunshine Gas Producers, LLC | 9/28/2011 | E-4415 |
| 3912-E | 9/26/2011 | N/A | Rule 18 Revisions in Compliance With Resolution E-4419 | Effective 9/26/2011 Pending Final Disposition | E-4419 |
| 3911-E | 9/26/2011 | 30607 - 30635 | Revisions to Electric Rules 1, 3, and 16 and Electric Schedule A-1 | Pending | |
| 3910-E | 9/26/2011 | N/A | Modifications to Electric Rate Schedule E-9 for Residential Time-of-Use Service for Low Emission Vehicle Customers | Superceded | 11-07-029 |
| 3909-E | 9/23/2011 | 30603 - 30606 | Modification of Energy Resource Recovery Account (ERRA) Preliminary Statement to Recover Net Surplus Compensation Payments to Eligible Net Energy Metering Customers Pursuant to Decision (D.)11-06-016 and Resolution E-4422 | 10/24/2011 | E-4422, 11-06-016 |
| 3908-E | 9/22/2011 | N/A | Structure Encroachment in Nevada County - Request for Approval of Encroachment Agreement Under Section 851 | Pending | N/A |
| 3907-E | 9/22/2011 | N/A | Mariposa Energy LCC Easement on PG&E's Kelso Substation Property in Alameda County - Request for Approval Under Section 851 | 12/15/2011 | N/A |
| 3905-E | 9/19/2011 | N/A | Modifications to PG&E's Renewable Auction Mechanism Program Protocol and Appendices As Required by Resolution E-4414 | 9/19/2011 | N/A |
| 3906-E | 9/16/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Wilson-Le Grand 115kV Relocation Project - Merced County | 10/17/2011 | N/A |
| 3903-E | 9/16/2011 | N/A | Third Annual Reasonableness Review of Pacific Gas and Electric Company's Schedule E-31 Contracts - Compliance Advice Letter Pursuant to Electric Schedule E-31 and D.09-06-025 and Confidential Attachments Submitted Pursuant to PUC Section 583 | Pending | 09-06-025 |
| 3904-E | 9/14/2011 | N/A | Notice of Federal Energy Regulatory Commission Approval of Uncontested Settlement of Rate Increase Filing (TO13) | 10/14/2011 | N/A |
| 3899-E-A | 9/13/2011 | N/A | Supplemental Filing to Make a Correction to CCSE Advice Letter 20 / PG&E Advice Letter 3899-E / SCE Advice Letter 2624-E Proposing Amendments to the California Solar Initiative Program Handbook to Conform to the Changes Adopted in Decision 11-07-031 | 10/7/2011 | Decision 11-07-031 |
| 3902-E | 9/12/2011 | 30583 - 30602 | Schedule NEMV Pursuant to Decision (D.)11-07-031, Ordering Paragraph 2 | Superceded | 11-07-031 |
| 3901-E / 3235-G | 9/12/2011 | N/A | Request for Authority to Shift Funds and Make Other Program Modifications Pursuant to D.09-09-047 | 2/10/2012 | 09-09-047 |
| 3900-E | 9/12/2011 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook to Update Sections in the Program and Performance Section of the CSI Program Handbook | 10/11/2011 | N/A |
| 3899-E | 9/9/2011 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook to Update the CSI Program Handbook to Conform to the Changes Adopted in Decision 11-07-031 | 10/7/2011 | N/A |
| 3852-E-A / 3212-G-A | 9/9/2011 | N/A | Supplemental Joint Filing: 2010-2012 Statewide Workforce Education and Training (WE&T) Program Modifications Based on Findings of WE&T Needs Assessment | 9/9/2011 | 09-09-047 |
| 3898-E | 9/1/2011 | 30534 - 30582 | Residential CARE Tier 3 and Certain Other Residential Electric Tariff Changes Resulting From Decision 11-05-047 in PG&E's 2011 General Rate Case Phase 2 | 11/1/2011 | 11-05-047 |
| 3896-E | 9/1/2011 | N/A | Annual Electric True-Up Filing - Change PG&E Electric Rates on January 1, 2012 | 1/1/2012 | E-4432 |
| 3895-E / 3233-G | 8/31/2011 | N/A | Statewide California Solar Initiative - Thermal Program Market Facilitation Plan and Budget in Compliance With Decision (D.) 01-01-022 | 9/30/2011 | N/A |
| 3645-E-A / 3108-G-A | 8/31/2011 | N/A | Supplement to Compliance Advice Letter to Submit the California Solar Initiative Thermal Program Budget and Market Facilitation Strategic Plan and Budget for the First Two Years per Decision 10-01-022 | 9/30/2011 | N/A |
| 3897-E | 8/30/2011 | N/A | Subdivision Encroachments in Fresno County - Request for Approval of Three Encroachment Agreements Under Section 851 | 10/1/2011 | N/A |
| 3883-E-A / 3227-G-A | 8/30/2011 | N/A | Supplemental: Proposed Amendments to the California Solar Initiative - Thermal Program Handbook | 9/16/2011 | N/A |
| 3876-E-A | 8/29/2011 | N/A | Supplemental Filing to the Power Purchase Agreement for Procurement of Renewable Energy Resources Between Mojave Solar, LLC, and Pacific Gas and Electric Company | 11/10/2011 | E-4433 |
| 3894-E / 3230-G | 8/26/2011 | N/A | Revise Recording of Energy Efficiency Expenditures Due to the Suspension of Gas EE Incentives and Rebates Resulting From Senate Bill 87 | Withdrawn | N/A |
| 3893-E | 8/18/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between Shiloh IV Wind Project, LLC, and Pacific Gas and Electric Company | 3/8/2012 | N/A |
| 3841-E-C | 8/18/2011 | 30316 - 30320 | Supplemental Filing: Revisions to PG&E's Community Choice Aggregation and Direct Access Tariffs to Facilitate the Exchange of Customer Information Between Community Choice Aggregators (CCAs) and Pacific Gas and Electric Company (PG&E) | 11/10/2011 | E-4420 |
| 3892-E | 8/16/2011 | 30531 - 30533 | Revisions to Demand Adjustment, Schedule E-20 | 9/15/2011 | N/A |
| 3891-E | 8/16/2011 | N/A | Update to Pacific Gas and Electric Company's Conformed 2006 Long-Term Procurement Plan -Brokerages and Exchanges Listing | 9/18/2011 | 07-12-052 |
| 3890-E | 8/15/2011 | 30514 - 30530 | Modifications to Schedule NEMVNMA Pursuant to Decision (D.) 11-07-031, Ordering Paragraph 1 | 9/14/2011 | 11-07-031 |
| 3888-E | 8/12/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Table Mountain-Pease 60 kV Power Line Bypass Switch Project in the County of Butte | 9/11/2011 | N/A |
| 3887-E | 8/12/2011 | N/A | Revisions to the Amendment of the Power Purchase Agreement Between Pacific Oroville Power and Pacific Gas and Electric Company | 8/12/2011 | N/A |
| 3889-E | 8/11/2011 | N/A | Road Access and Utilities Easement in Contra Costa County - Request for Approval Under Section 851 | 9/14/2011 | N/A |
| 3867-E-A | 8/11/2011 | N/A | Supplemental Filing - Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction Laytonville-Garberville 60 Kilovolt Pole Replacement Project in the County of Mendocino | 10/10/2011 | N/A |
| 3886-E | 8/8/2011 | N/A | Adjustment of the Utility Generation Account (UGBA) Annual Revenue Requirement to Reflect Colusa Power Plant Performance Incentives | 9/7/2011 | 06-11-048, 08-02-019 |
| 3885-E | 8/5/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between North Sky River Energy, LLC, and Pacific Gas and Electric Company | 2/1/2012 | N/A |
| 3884-E | 8/4/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between Copper Mountain Solar 2, LLC (a Subsidiary of Sempra Generation), and Pacific Gas and Electric Company | 12/15/2011 | E-4447 |
| 3883-E / 3227-G | 8/3/2011 | N/A | Proposed Amendments to the California Solar Initiative - Thermal Program Handbook | Superceded | N/A |
| 3882-E | 8/2/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Konocti Substation 60 kV Power Line Re-Arrangement Project in the County of Lake | 9/1/2011 | N/A |
| 3881-E | 7/29/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Nicolaus-Wilkins Slough 60 kV Pole Replacement Project in the Counties of Sutter, Yolo and Colusa | 8/28/2011 | N/A |
| 3880-E | 7/29/2011 | N/A | Procurement Transaction Quarterly Compliance Filing (Q2, 2011) | 2/13/2012 | 03-12-062 |
| 3759-E-A | 7/27/2011 | N/A | Supplemental Filing to the Contract for Procurement of Renewable Energy Resources Between Pacific Gas and Electric Company and North Star Solar, LLC | 10/20/2011 | E-4436 |
| 3879-E | 7/22/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Weber # 1 60 kV and Tesla-Stockton Cogen 115 kV Power Line Relocation Project in the City of Stockton, San Joaquin County | 8/21/2011 | N/A |
| 3878-E | 7/22/2011 | 30506 - 30513 | Revisions to Non-Residential Peak Day Pricing Rate Schedules | 8/22/2011 | N/A |
| 3877-E | 7/20/2011 | N/A | Advice Letter Filing of Photovoltaic (PV) Power Purchase Agreements in Accordance With the PG&E PV Program | 8/19/2011 | E-4368, 10-04-052 |
| 3876-E | 7/19/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between Mojave Solar, LLC, and Pacific Gas and Electric Company | 11/10/2011 | E-4433 |
| 3841-E-B | 7/19/2011 | 30316 - 30320 | Supplemental Filing: Revisions to PG&E's Community Choice Aggregation and Direct Access Tariffs to Facilitate the Exchange of Customer Information Between Community Choice Aggregators (CCAs) and Pacific Gas and Electric Company (PG&E) | Superceded | N/A |
| 3874-E | 7/15/2011 | 30503 - 30505 | New Electric Sample Form 79-1129: Special Contract for Unmetered Service - Limited Pilot Program for Network Controlled Dimmable Streetlight Systems | 9/22/2011 | E-4421 |
| 3872-E | 7/15/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Colusa JCT #1 and Pease-Harter 60 kV Power Line Project in Sutter County | 8/14/2011 | N/A |
| 3875-E | 7/14/2011 | N/A | Second Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Mt. Lassen Power and Pacific Gas and Electric Company | Withdrawn | N/A |
| 3873-E / 3224-G | 7/12/2011 | N/A | Modification to Customer Bill to Implement On-Bill Financing | 8/11/2011 | 09-09-047 |
| 3870-E | 7/11/2011 | 30484 - 30502 | Revisions to Electric Schedules NEM - Net Energy Metering and NEMVNMA - Virtual Net Energy Metering For Multifamily Affordable Housing (MASH/NSHP) With Solar Generator(s) in Compliance with Assembly Bill (AB) 920 and Decision (D) 11-06-016 | 1/1/2010 | E-4422, D.11-06-016 |
| 3871-E | 7/7/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Fort Ord Power Line Project in the City of Seaside, County of Monterey | 8/6/2011 | N/A |
| 3869-E | 7/7/2011 | N/A | Implementation of Revenue Requirements for Income Taxes Associated With the Accelerated Amortization of Electromechanical Meters Replaced By SmartMeter(TM) Devices Resulting From PG&E's 2011 General Rate Case Phase I Decision (D.11-05-018) | 1/1/2011 | 11-05-018 |
| 3868-E / 3221-G | 6/30/2011 | N/A | Affiliate Transaction Rules Compliance Plan | 6/30/2011 | 06-12-029 |
| 3867-E | 6/30/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction Laytonville-Garberville 60 Kilovolt Pole Replacement Project in the County of Mendocino | Superceded | N/A |
| 3736-E-A | 6/30/2011 | N/A | Supplemental Filing to the Power Purchase Agreement for Procurement of Renewable Energy Resources Between TGP Coyote Canyon, LLC, and Pacific Gas and Electric Company | Withdrawn | N/A |
| 3866-E / 3220-G | 6/24/2011 | N/A | Add One New Site to Hazardous Substance Mechanism | 7/25/2011 | 94-05-020 |
| 3865-E | 6/24/2011 | N/A | Sprint Subsurface Easement on PG&E's Wheatland Substation Property in Yuba County - Request for Approval Under Section 851 | 1/4/2012 | N/A |
| 3864-E | 6/17/2011 | 30481 - 30483 | Establishment of an Interim Interconnection Procedure for Rule 21 Qualifying Facilities Signing New PURPA Power Purchase Agreements With PG&E | Withdrawn | N/A |
| 3863-E | 6/17/2011 | N/A | Davi Place Encroachment in Contra Costa County - Request for Approval of Encroachment Agreement Under Section 851 | 8/24/2011 | N/A |
| 3862-E | 6/16/2011 | N/A | Purchase and Sale Agreement for Procurement of Renewable Energy Credits Between TransAlta Corporation and Pacific Gas and Electric Company | Pending | N/A |
| 3861-E / 3217-G | 6/15/2011 | N/A | Post-Retirement Benefits Other Than Pensions (PBOPs) for the Period From 2007 to 2010 | 7/15/2011 | 07-03-044 |
| 3860-E | 6/13/2011 | 30474 - 30476 | Amendment to Electric Rule No. 20 in Accordance With the Memorandum of Understanding (MOU) Between Disability Rights Advocates (DisabRA) and Pacific Gas and Electric Company (PG&E) | 7/13/2011 | N/A |
| 3859-E / 3216-G | 6/13/2011 | 30477 - 30480 | Establish Tax Act Memorandum Account (TAMA-E) and (TAMA-G) per CPUC Resolution No. L-411 | Superceded | L-411 |
| 3754-E-A | 6/10/2011 | N/A | Supplemental Filing to the Contract for Procurement of Renewable Energy Resources Between Pacific Gas and Electric Company and Kiara Solar, Inc. | 12/15/2011 | E-4444 |
| 3858-E / 3215-G | 6/9/2011 | N/A | Add One New Site to Hazardous Substance Mechanism | 7/11/2011 | N/A |
| 3857-E | 6/9/2011 | N/A | Filing in Compliance With Resolution E-4402, Approving With Conditions the Power Purchase Agreement for Procurement of Renewable Energy Resources Between Shiloh III Wind Project, LLC, and Pacific Gas and Electric Company | 8/2/2011 | N/A |
| 3856-E / 3214-G | 6/8/2011 | 30406 - 30473 | Implementation of Residential Gas and Electric Tariff Changes Resulting From Decision 11-05-047 in PG&E's 2011 General Rate Case Phase 2 | 6/20/2011 | 11-05-047 |
| 3855-E | 6/3/2011 | 30403 - 30405 | Revision to Renewables Portfolio Standard Cost Memorandum Account | 7/5/2011 | 11-04-030 |
| 3852-E / 3212-G | 6/3/2011 | N/A | 2010-2012 Statewide Workforce Education and Training (WE&T) Program Modifications Based on Findings of WE&T Needs Assessment | Superceded | 09-09-047 |
| 3854-E | 6/2/2011 | N/A | Purchase and Sale Agreement for Procurement of Renewable Energy Credits Between Sierra Pacific Industries Corporation and Pacific Gas and Electric Company | 1/10/2013 | N/A |
| 3853-E | 6/1/2011 | N/A | Submission of the Fifteenth Gas Supply Plan (GSP-15) for the California Department of Water Resources (CDWR) Tolling Agreements (November 1, 2011, Through October 31, 2012) | 11/1/2011 | 02-12-069; 03-04-029 |
| 3851-E / 3211-G | 5/31/2011 | 30384 - 30402 | Implementation of Electric and Gas Tariff Changes Resulting From Decision 11-05-018 in PG&E's 2011 General Rate Case Phase I | 6/1/2011 | 11-05-18 |
| 3850-E / 3210-G | 5/31/2011 | 30378 - 30383 | Establish Gas and Electric Meter Reading Costs Balancing Accounts, Update SmartMeter(TM) Project Revenue Requirements and Revise the SmartMeter(TM)Balancing Accounts and Benefits Realization Mechanism in Compliance With Decision 11-05-018 | 5/31/2011 | 11-05-018 |
| 3849-E | 5/31/2011 | 30373 - 30377 | Implementation of Electric Tariff Changes Resulting From Decision 11-05-018 in PG&E's 2011 General Rate Case Phase I | 5/31/2011 | 11-05-018 |
| 3848-E | 5/31/2011 | N/A | Update to the 2011-2012 Nuclear Decommissioning Trust Revenue Requirements in Compliance with Decisions 09-09-020 and 11-05-018 | 1/1/2011 | 09-09-020; 11-05-018 |
| 3847-E | 5/27/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between Montezuma Winds II, LLC, and Pacific Gas and Electric Company | 1/12/2012 | N/A |
| 3846-E | 5/26/2011 | N/A | Eastshore-Dumbarton 115 kV Power Line Reconductoring Project | 5/26/2011 | N/A |
| 3793-E-A | 5/25/2011 | 30370 - 30372 | Supplemental: Modifications to Export Addendum to Electric Rule 21 Standard Form 79-973 - Generating Facility Interconnection Agreement | 6/24/2011 | N/A |
| 3841-E-A | 5/20/2011 | 30316 - 30319 | Supplemental Filing: Revisions to PG&E's Community Choice Aggregation and Direct Access Tariffs to Facilitate the Exchange of Customer Information Between Community Choice Aggregators (CCAs) and Pacific Gas and Electric Company (PG&E) | Superceded | N/A |
| 3794-E-A | 5/19/2011 | N/A | Supplemental Filing to Advice Letter 3794-E -- Sixth Amendment to the Contract for Procurement of Renewable Resources Energy Resulting From the Power Sales Agreement Between PG&E and Monterey Regional Waste Management District | 2/24/2011 | N/A |
| 3845-E | 5/16/2011 | N/A | Filing in Compliance With Resolution E-4393, Approving With Conditions the Power Purchase Agreement for Procurement of Renewable Energy Resources Between Mesquite Solar-1, LLC (Formally SGS-1, LLC), and Pacific Gas and Electric Company | 6/7/2011 | |
| 3696-E-C | 5/16/2011 | 30355 - 30369 | Supplemental Advice Letter for the Establishment of Standard Contracts and Tariffs for Purchase of Excess Electricity From Eligible Small Combined Heat and Power Facilities | Superceded | E-4424, 11-04-033 |
| 3844-E / 3204-G | 5/13/2011 | 30321 - 30354 | Revised Household Income Requirements for California Alternate Rates for Energy (CARE) Program and Family Electric Rate Assistance (FERA) Program | 6/1/2011 | E-3524 |
| 3843-E | 5/10/2011 | N/A | Amendment to Existing Qualifying Facility Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between DG Fairhaven Power LLC and Pacific Gas and Electric Company | 12/1/2011 | E-4427 |
| 3842-E | 5/5/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Carrizo-Midway 230 kV Reconductoring Proj. (Kern and SLO Counties);Caliente Switching Station Proj. SLO County);and Solar Switching Station Proj. SLO County) | 9/14/2011 | E-4403 |
| 3840-E | 5/3/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Helm-McCall 230 kV Reconductoring Project in the County of Fresno | 7/23/2012 | N/A |
| 3839-E | 5/3/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Arco-Tulare Lake 70 kV Power Line Pole Replacement Project in the County of Kings | 6/2/2011 | N/A |
| 3838-E | 5/3/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Merced #1 70kV Power Line Pole Replacement Project in the County of Merced | 6/2/2011 | N/A |
| 3837-E | 5/3/2011 | N/A | Amendments to Two Power Purchase and Sale Agreements Between Global Ampersand, LLC, Successor in Interest to Global Common LLC, and Pacific Gas and Electric Company | 12/15/2011 | E-4430 |
| 3841-E | 5/2/2011 | 30316 - 30320 | Revisions to PG&E's Community Choice Aggregation and Direct Access Tariffs to Facilitate the Exchange of Customer Information Between Community Choice Aggregators (CCAs) and Pacific Gas and Electric Company (PG&E) | Superceded | N/A |
| 3836-E | 4/29/2011 | N/A | Procurement Transaction Quarterly Compliance Filing (Q1, 2011) | Pending | 03-12-062 |
| 3835-E | 4/27/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Del Monte #1 & #2 60 kV Power Line in the City of Seaside, County of Monterey | 5/27/2011 | N/A |
| 3834-E | 4/21/2011 | N/A | 2010 Vegetation Management Balancing Account | 5/23/2011 | 07-03-044 |
| 3833-E | 4/20/2011 | 30291 - 30315 | Revisions to Schedule S and Electric Rule 1 to End Standby Exemptions for Distributed Energy Resources | 4/20/2011 | N/A |
| 3832-E | 4/18/2011 | N/A | Cedar Creek Bridge Replacement Agreement -Request for Approval Under Section 851 | 7/25/2012 | N/A |
| 3831-E | 4/18/2011 | 30272 - 30290 | Revisions to Electric Rate Schedule LS-1, PG&E-Owned Street and Highway Lighting, to Add Light-Emitting Diode (LED) Street Lighting | 6/1/2011 | N/A |
| 3830-E | 4/15/2011 | 30263 - 30271 | Revisions to the Tariffs and Standard Contracts for the Purchase of Eligible Renewable Generation from Public Water and Wastewater Facilities and Small Renewable Generators | 6/24/2011 | N/A |
| 3829-E | 4/14/2011 | 30254 - 30262 | Renewable Energy Credits Costs and Revenues | 5/14/2011 | 11-01-025 |
| 3828-E | 4/13/2011 | 30175 - 30176 | Notice to Terminate the Bond Charge Balancing Account | 5/13/2011 | N/A |
| 3623-E-A | 4/13/2011 | N/A | Supplemental Filing for Power Sales Agreements Between PG&E and Potrero Hills Energy Producers, LLC, and Sunshine Gas Producers, LLC | 8/18/2011 | E-4415 |
| 3735-E-B | 4/6/2011 | N/A | Supplemental Filing and Second Amendment to the Contract for Procurement of Renewable Energy Resources Resulting From PG&E's Wind Energy Power Purchase Agreement for Procurement With Shiloh III Wind Project, LLC | 5/26/2011 | E-4402 |
| 3827-E | 4/1/2011 | 30172 - 30174 | Nuclear Decommissioning Adjustment Mechanism (NDAM) | 5/1/2011 | 10-07-047 |
| 3826-E | 4/1/2011 | N/A | Diablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter | 4/1/2011 | E-3152, 88-12-083 |
| 3825-E | 4/1/2011 | N/A | Proposed Amendments to the California Solar Initiative General Market Program Measurement and Evaluation Plan | 5/1/2011 | 10-09-046 |
| 3824-E | 4/1/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Valley Springs #1 60 kV Power Line Relocation Project in San Joaquin and Calaveras Counties | 4/21/2011 | N/A |
| 3823-E | 4/1/2011 | 30168 - 30171 | Revisions to Schedule E-DCG - Consolidate Changes Previously Approved in Advice Letters 3446-E, 3446-E-A and 3446-E-B | 6/1/2010 | N/A |
| 3818-E | 4/1/2011 | N/A | 2011 Energy Resource Recovery Account Trigger Amount - Compliance Filing | 4/1/2011 | 02-10-062, 04-01-050, 04-12-048 |
| 3822-E | 3/30/2011 | N/A | Power Purchase Agreement for Procurement of Renewable Energy Resources Between Vasco Winds, LLC, and Pacific Gas and Electric Company | 10/6/2011 | E-4423 |
| 3821-E | 3/30/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Panoche-Helm 230 kV Reconductoring Project in the County of Fresno | 4/29/2011 | N/A |
| 3819-E | 3/28/2011 | N/A | Annual Adjustments to the Electric Public Purpose Goods Charge Funding Obligations in Compliance With Resolution E-3792 | 1/1/2011 | E-3792 |
| 3817-E | 3/28/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Manteca #1 60 kV Relocation Project in the City of Patterson, County of Stanislaus | 7/23/2012 | N/A |
| 3508-E-A | 3/28/2011 | 30177 - 30253 | Revisions to Electric Rule 21 - Generating Facility Interconnections, Section D | 9/22/2011 | E-4411 |
| 3820-E | 3/25/2011 | N/A | Proposed Amendment to Pacific Gas and Electric Company's Permanent Load Shifting Program Contract with Cypress Ltd. | 4/25/2011 | N/A |
| 3816-E | 3/21/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for Callendar Switching Station-Mesa 115kV Line Relocation/Removal (Willow Road Interchange) Project, County of San Luis Obispo | 7/23/2012 | N/A |
| 3815-E | 3/17/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Ravenswood-Palo Alto 115kV Power Line Relocation, City of Palo Alto, Santa Clara County | 7/23/2012 | N/A |
| 3814-E | 3/17/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Panoche Substation Expansion Project, County of Fresno | 8/23/2012 | N/A |
| 3813-E | 3/8/2011 | 30079 - 30099 | Revisions to Non-Residential Peak Day Pricing Rate Schedules, Rate Schedule E-CSAC, Commercial Smart A/C Program, and Rate Schedule Selection Customer Agreement (Form No. 79-1039) | 4/7/2011 | N/A |
| 3812-E | 3/7/2011 | N/A | Notice of Intent to Change the Method of Calculating System Reliability Indices From That Specified in CPUC Decision 96-09-045, Dated September 4, 1996 | 7/25/2011 | N/A |
| 3811-E | 3/4/2011 | N/A | Pacific Gas and Electric Company's Proposed Amendments to Two Existing Qualifying Facility Power Purchase Agreements with Berry Petroleum | 7/14/2011 | E-4413 |
| 3735-E-A | 3/4/2011 | N/A | Supplemental Filing for the Contract for Procurement of Renewable Energy Resources Resulting From PG&E's Wind Energy Power Purchase Agreement for Procurement With Shiloh III Wind Project, LLC | 5/26/2011 | E-4402 |
| 3705-E-A | 3/1/2011 | N/A | Supplemental Filing for Amendment to Power Purchase Agreement Between ENXCO Wind Farm, Inc., and Pacific Gas and Electric Company | 3/10/2011 | E-4389 |
| 3810-E / 3192-G | 2/28/2011 | N/A | Add Two New Sites to Hazardous Substance Mechanism | 3/30/2011 | 94-05-020 |
| 3797-E-A | 2/28/2011 | 29973 - 30068 | Electric Rate Changes for Transmission (TO13), Transmission Access Charge Balancing Account Adjustment, and SmartAC(TM) Program | Effective 3/1/2011 Pending Final Disposition | N/A |
| 3809-E | 2/25/2011 | N/A | Request for Approval of Implementation and Administration Details for PG&E's Renewable Auction Mechanism | 8/18/2011 | E-4414, 10-12-048 |
| 3808-E | 2/24/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Midway-Renfro and Midway-Rio Bravo-Renfro 115 kV Power Line Reconductoring Project in the County of Kern | 3/26/2011 | N/A |
| 3807-E | 2/23/2011 | 30076 - 30078 | GRC Phase 3 IT Consultant Cost Reimbursement | 2/15/2011 | |
| 3696-E-B | 2/22/2011 | 30069 - 30075 | Supplemental Advice Letter for Establishment of Standard Contracts and Tariffs for Purchase of Excess Electricity from Eligible Small Combined Heat and Power Facilities | Superceded | 10-12-055 |
| 3805-E | 2/18/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Merced-Livingston 115kV Power Line Pole Replacement Project in the County of Merced | 3/30/2011 | N/A |
| 3806-E | 2/17/2011 | 29967 - 29972 | Revisions to Electric Rate Schedule E-DBP, Demand Bidding Program, and Consolidation of Revisions to Electric Schedule E-PEAKCHOICE | 3/21/2011 | 09-08-027, 10-02-032 |
| 3804-E | 2/11/2011 | 29962 - 29966 | Revision to the SmartAC(TM) - Electric Rate Schedule E-RSAC and Electric Rate Schedule E-CSAC Pursuant to Decision (D.) 11-01-036 | 2/11/2011 | D.11-01-036 |
| 3803-E / 3189-G | 2/10/2011 | 29959 - 29961 | Request to Use CARE Funds to Supplement PG&E's Relief for Energy Assistance Through Community Help (REACH) Program | 6/9/2011 | G-3455 |
| 3799-E | 2/10/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Placer-Del Mar 60 kV Power Line Pole Replacement Project in the County of Placer | 3/12/2011 | N/A |
| 3801-E-A / 3187-G-A | 2/9/2011 | 29954 - 29958 | Supplement: Revisions to Electric Rules 1 and 17 and Gas Rule 17 | 12/13/2010 | 10-10-032 |
| 3632-E-B | 2/9/2011 | N/A | Supplemental Filing for the Contracts for Procurement of Renewable Resources Energy Resulting From Power Purchase Agreements Between Barclays Bank PLC and Pacific Gas and Electric Company | Pending | N/A |
| 3600-E-B | 2/9/2011 | N/A | Supplemental Filing for the Contracts for Procurement of Renewable Resources Energy Resulting From Power Purchase Agreements Between Barclays Bank PLC and Pacific Gas and Electric Company | Pending | N/A |
| 3802-E | 2/4/2011 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the PG&E Santa Rosa-Corona 115kV Power Line Relocation, City of Santa Rosa, County of Sonoma | 3/18/2011 | N/A |
| 3801-E / 3187-G | 2/4/2011 | 29954 - 29958 | Revisions to Electric Rules 1 and 17 and Gas Rule 17 | Superceded | 10-10-032 |
| 3796-E | 2/4/2011 | 29947 - 29949 | Revision to Renewables Portfolio Standard Cost Memorandum Account | 3/7/2011 | 11-01-016 |
| 3800-E | 2/1/2011 | N/A | Approval of Price Index Change for Deliveries Under Six Existing Qualifying Facilities Power Purchase Agreements | 3/9/2011 | N/A |
| 3609-E-A | 2/1/2011 | N/A | Supplemental Filing for the Contracts for Procurement of Renewable Energy Resulting From Power Purchase Agreements Between Shell Energy North America (U.S.), L.P., and Pacific Gas and Electric Company | Withdrawn | N/A |
| 3583-E-A | 2/1/2011 | N/A | Supplemental Filing for the Contracts for Procurement of Renewable Energy Resulting From Power Purchase Agreements Between Shell Energy North America (U.S.), L.P., and Pacific Gas and Electric Company | Withdrawn | N/A |
| 3798-E | 1/31/2011 | N/A | Procurement Transaction Quarterly Compliance Filing (Q4, 2010) | 7/29/2011 | 03-12-062 |
| 3696-E-A | 1/31/2011 | 29500 - 29953 | Establishment of Standard Contracts and Tariffs for Purchase of Excess Electricity from Eligible Small Combined Heat and Power Facilities | Superceded | 10-12-055 |
| 3797-E | 1/28/2011 | N/A | Electric Rate Changes for Transmission (TO13), Transmission Access Charge Balancing Account Adjustment, and SmartAC(TM) Program | Superceded | N/A |
| 3795-E | 1/26/2011 | N/A | Third Amendment to the Power Purchase Agreement for Procurement of Eligible Renewable Energy Resources Between Arlington Wind Project, LLC, and Pacific Gas and Electric Company | Pending | N/A |
| 3794-E | 1/25/2011 | N/A | Fifth Amendment to Power Sales Agreement Between PG&E and Monterey Regional Waste Management District | 2/24/2011 | 06-12-009 |
| 3793-E | 1/20/2011 | 29944 - 29946 | Modifications to Export Addendum to Electric Rule 21 Standard Form 79-973, Generating Facility Interconnection Agreement | Superceded | N/A |
| 3620-E-B | 1/20/2011 | N/A | Supplemental Filing: Contracts for Procurement of Renewable Energy Resulting From Power Purchase Agreements Between Halkirk I Wind Project LP, Blackspring Ridge IA Wind Project LP, and Blackspring Ridge IB Wind Project LP and PG&E | 1/27/2011 | E-4390 |
| 3792-E | 1/18/2011 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook Pursuant to Decision 10-09-046 | 2/17/2011 | 10-09-046 |
| 3791-E / 3184-G | 1/14/2011 | N/A | Proposed Amendments to the California Solar Initiative Thermal Program Handbook | 2/28/2011 | 10-01-022 |
| 3790-E | 1/12/2011 | 29940 - 29943 | Modification of Energy Resource Recovery Account (ERRA) Preliminary Statement to Recover Convergence Bidding Revenues or Costs in Compliance With Decision 10-12-034 | 2/1/2011 | 10-12-034 |
| 3789-E / 3182-G | 1/6/2011 | N/A | Notification of the Creation of a New Affiliate | 2/11/2010 | 06-12-029 |