| Advice No. | Date Filed | Tariff Sheet No. | Subject | Effective Date | Decision No. |
|---|---|---|---|---|---|
| 3392-E / 2984-G | 12/30/2008 | 28016 - 28018 | Customer Access To Meter Data in Compliance with Decision 06-07-027 | Superceded | N/A |
| 3391-E | 12/30/2008 | 28008 - 28010 | Agreement between Pacific Gas and Electric Company and East Bay Municipal Utilities District Pursuant to PUC Code 2829 | Superceded | N/A |
| 3389-E | 12/30/2008 | N/A | Natural Gas Storage Services Contract for PG&E Electric Fuels | 1/30/2009 | N/A |
| 3361-E-A | 12/30/2008 | 28011 - 28015 | Supplement: Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-016 | 1/1/2009 | N/A |
| 3349-E-A | 12/30/2008 | 27884 - 28007 | Supplement: Annual Electric True-Up Filing -- Change PG&E Electric Rates on January 1, 2009 | 1/1/2009 | E-4217 |
| 3390-E | 12/29/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Palermo-Colgate-Rio Oso 230kV Transmission Line Reconductoring Project - Counties of Butte, Sutter, and Yuba | 4/7/2009 | N/A |
| 3388-E | 12/22/2008 | 27867 - 27880 | Revisions to Electric Tariffs in Compliance with Decision 08-12-038 - Bridge Funding for 2009 Demand Response Programs | 1/1/2009 | N/A |
| 3387-E | 12/22/2008 | 27881 - 27883 | Request Approval to Establish the Land Conservation Plan Environmental Remediation Memorandum Account (LCPERMA), Per Commission Decision 08-11-043 | 2/1/2009 | 08-11-043 |
| 3386-E | 12/22/2008 | N/A | Contract between PG&E and El Dorado Energy, LLC for Procurement of Renewable Energy Resources Resulting from PG&E's 2008 Renewables Portfolio Standard (RPS) Solicitation | 5/21/2009 | N/A |
| 3385-E | 12/22/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Carbona #1 60kV Tap Reconductoring Project - City of Tracy and County of San Joaquin | 12/12/2012 | N/A |
| 3384-E | 12/22/2008 | N/A | Calculation Of Indifference Payments In Compliance With Decision 08-11-056 | 1/12/2009 | N/A |
| 3383-E | 12/19/2008 | N/A | Electric Rule 15/16 Exceptional Case Line Extension Agreement for Nevada County | 12/19/2008 | N/A |
| 3382-E | 12/19/2008 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook to Revise Metering Requirements and Performance Based Incentive Payment Terms and to Incorporate Performance Data Provider Requirements (Joint AL with CCSE) | Pending | N/A |
| 3381-E / 2981-G | 12/18/2008 | 27862 - 27866 | Revise Section K -- Summary Billing in Gas and Electric Rule 9 to Reflect New Billing Requirements, and Eliminate Standard Form M62-1491 Summary Billing Agreement (See also 2981-G) | 1/20/2009 | N/A |
| 3380-E / 2980-G | 12/18/2008 | N/A | 1% Franchise Surcharge For Gas And Electric Customers Within The City of Bakersfield (see also 2980-G) | 1/20/2009 | N/A |
| 3376-E | 12/16/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Table Mountain-Pease 60kV Power Line Relocation, County of Butte | 1/15/2009 | N/A |
| 3379-E | 12/15/2008 | N/A | 2009 Department of Water Resources (DWR) Revenue Requirement Determination | 1/1/2009 | N/A |
| 3378-E | 12/15/2008 | N/A | Proposed Amendments to the California Solar Initiative Program Handbook to Incorporate the Multifamily Affordable Solar Housing Program and to Implement Track 1 Incentives | Pending | N/A |
| 3377-E | 12/15/2008 | N/A | Notice of the Transmission Access Charge Balancing Account Adjustment (TACBAA) filing with the Federal Energy Regulatory Commission | 3/1/2009 | N/A |
| 3375-E / 2979-G | 12/12/2008 | N/A | Request for Approval to Adjust the Year (PY) 2009-2011 Gas and Electric Low Income Energy Efficiency (LIEE) Expense Ratio and Budget Allocation Factors | 2/6/2009 | N/A |
| 3197-E-B | 12/10/2008 | N/A | Second Supplement - Standard Contract For Certain Qualifying Facilities Pursuant to Decision 07-09-040 | Withdrawn | N/A |
| 3374-E / 2977-G | 12/8/2008 | N/A | ClimateSmart Program Purchase of Verified Emission Reductions Under the Urban Forestry Project Reporting Protocol in Compliance With Decision 06-12-032 | 2/11/2009 | N/A |
| 3299-E-A / 2939-G-A | 12/8/2008 | N/A | Supplement: ClimateSmart Purchase of Verified Emission Reductions Under the Landfill Project Reporting Protocol in Compliance With Decision 06-12-032 | 12/8/2008 | N/A |
| 3373-E | 12/5/2008 | 27854 - 27858 | Routine Annual Advice Filing for Dedicated Rate Component Series 1 and Series 2 Charge True-up Mechanism | 1/1/2009 | 04-11-015 |
| 3372-E / 2975-G | 12/2/2008 | 27851 - 27853 | Tariff Revisions to Reflect an Increase in Income Tax Component of Contribution Tax Factor | 1/1/2009 | N/A |
| 3371-E | 12/1/2008 | N/A | St. Joseph Hospital of Eureka Sole Customer Facility Sale -- Request for Approval Under Section 851 | 6/18/2009 | N/A |
| 3370-E / 2974-G | 12/1/2008 | N/A | Add Two New Sites to Hazardous Substance Mechanism | 12/31/2008 | N/A |
| 3356-E-A / 2967-G-A | 11/25/2008 | N/A | Energy Efficiency, Decision 10-08-027 Bridge Funding for 2009 Energy Efficiency Programs Compliance Advice Letter, Update | 1/1/2009 | N/A |
| 3369-E | 11/24/2008 | N/A | Electric Rule 15/16 Exceptional Case Agreement for the East Bay Municipal Utilities District Camanche Pumping Plant | 11/24/2008 | N/A |
| 3368-E | 11/24/2008 | N/A | Third Extension of Three Biomass Generation Power Purchase Agreements Resulting from PG&E's Interim Renewable Energy Solicitation | 2/20/2009 | N/A |
| 3365-E | 11/24/2008 | N/A | Methodology for Calculation of Non-Bypassable Charges for Mountain House Customers (Modesto Irrigation District) | 12/24/2008 | N/A |
| 3364-E | 11/24/2008 | 27838 - 27850 | Revisions to Schedule S (Standby Service) Pursuant to D.07-09-004 | Effective 1/1/2009 Pending Final Disposition | 07-09-004 |
| 3367-E | 11/21/2008 | N/A | Contract between PG&E and Hatchet Ridge Wind, LLC for Procurement of Renewable Energy Resources Resulting from PG&E's 2005 Renewables Portfolio Standard (RPS) Solicitation | 2/20/2009 | N/A |
| 3366-E | 11/20/2008 | N/A | Drum-Rio Oso 115kV Power Line Tower 38/275 Relocation Project, County of Placer | 12/20/2008 | N/A |
| 3234-E-A | 11/20/2008 | N/A | Supplement Advice Letter for 3234-E, Updated Schedules 1 and 3 of the Operating Agreement Between the CDWR and PG&E as adopted by the CPUC D.03-04-029, and modified by the CPUC D.04-10-035 | Pending | N/A |
| 3363-E | 11/17/2008 | 27832 - 27837 | Establishment of Schedule NEMCCSF- Net Energy Metering Service For City and County of San Francisco Municipal Load Served by Hetch Hetchy and a Solar Generator | Superceded | PUC Section 2828 (f) |
| 3362-E | 11/14/2008 | N/A | Request for Approval of Gateway Generating Station Updated Revenue Requirement | 12/15/2008 | N/A |
| 3361-E | 11/14/2008 | N/A | Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-016 | 1/1/2009 | N/A |
| 3360-E | 11/12/2008 | 27828 - 27831 | Revision to Demand Response Base Interruptible Program Rate Schedule E-BIP | 12/12/2008 | N/A |
| 3110-E-A | 11/12/2008 | N/A | Supplement Advice Letter for Advice 3110-E, Notice of Federal Energy Regulatory Commission Rate Increase Filing (TO10) | Pending | N/A |
| 3359-E | 11/4/2008 | N/A | Anniversary True-up Mechanism Advice Filing for Dedicated Rate Component (DRC) Series 2005-1 and 2005-2 Charges | 11/6/2008 | N/A |
| 3357-E | 10/31/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month December 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 12/1/2008 | N/A |
| 3358-E | 10/30/2008 | N/A | Procurement Transaction Quarterly Compliance Filing (Q3, 2008) | 5/14/2009 | N/A |
| 3356-E / 2967-G | 10/27/2008 | 27825 - 27827 | Energy Efficiency - Decision 10-08-027 Bridge Funding for 2009 Energy Efficiency Programs Compliance Advice Letter | 1/1/2009 | 10-08-027 |
| 3355-E | 10/17/2008 | N/A | Notice of Federal Energy Regulatory Commission Rate Increase Filing (TO11) | 3/1/2009 | N/A |
| 3354-E / 2963-G | 10/17/2008 | 27777 - 27824 | Clean-Up of Gas and Electric Tariffs (see also 2963-G) | 11/16/2008 | N/A |
| 3353-E | 10/16/2008 | 27763 - 27776 | Revisions to Electric Rule 2 | 11/15/2008 | N/A |
| 3350-E | 10/14/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Soledad #1 60 kV Pole Replacement, County of Monterey | 11/13/2008 | N/A |
| 3352-E | 10/7/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 53 Wood Poles on the Caruthers-Kingsburg 70kV Power Line, County of Fresno | 11/6/2009 | N/A |
| 3351-E | 10/7/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 3 Poles in the McCall-Reedley 115 Kilovolt Power Line, County of Fresno | 11/6/2008 | N/A |
| 3298-E-A / 2938-G-A | 10/3/2008 | N/A | Supplemental for Pacific Gas and Electric Company's Advice 2938-G/3298-E | 11/6/2008 | N/A |
| 3349-E | 10/1/2008 | N/A | Annual Electric True-Up Filing -- Change PG&E Electric Rates on January 1, 2009 | 1/1/2009 | N/A |
| 3348-E | 10/1/2008 | 27760 - 27762 | Extend Experimental Status of Schedule E-AMDS - Experimental Access To Meter Data Services | 10/31/2008 | N/A |
| 3347-E | 9/30/2008 | 27676 - 27759 | June 2008 ERRA Trigger - Update to Reflect Acutal Recorded ERRA Balance Through August 31, 2008 for October 1, 2008 Rate Change | 10/1/2008 | 08-08-011 |
| 3345-E | 9/30/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month November 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 11/1/2008 | D.05-10-042 |
| 3346-E | 9/29/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 4 Replacement Poles in the Henrietta-Kingsburg 115 Kilovolt Power Line, County of Kings | 10/29/2008 | N/A |
| 3193-E-B | 9/29/2008 | N/A | Second Supplement - Amendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company | 11/20/2008 | N/A |
| 3344-E / 2958-G | 9/24/2008 | 27672 - 27675 | ClimateSmart Charity Servicing Agreement and Revisions to Gas and Electric ClimateSmart Balancing Accounts | Superceded | N/A |
| 3343-E | 9/23/2008 | N/A | City and County of Fresno Pedestrian Walkway Easement - Request for Approval Under Section 851 | 12/4/2008 | N/A |
| 3341-E | 9/12/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Vacaville-Suisun-Jameson 115kV Wood Pole Replacement Project in the City of Fairfield and County of Solano | Pending | N/A |
| 3342-E | 9/9/2008 | N/A | Diablo Canyon Unit 2 Steam Generator Replacement(Utility Generation Balancing Account Revenue Requirement) | 1/1/2009 | N/A |
| 3340-E / 2954-G | 9/9/2008 | N/A | 2009 Gas and Electric Attrition Adjustments (2007 General Rate Case Decision 07-03-044) | 1/1/2009 | N/A |
| 3339-E | 9/8/2008 | N/A | Request to Consolidate Accounts Under a Single General Service Rate Schedule at 5935 Red Hill Road, Petaluma, CA | 10/8/2008 | N/A |
| 3338-E | 9/8/2008 | N/A | Sale of Certain Electric Facilities to McEvoy Power, L.L.C. | 12/18/2008 | N/A |
| 3328-E | 9/8/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Glass-Biola-Madera 70kV Reconductor Project, County of Madera | 10/8/2008 | N/A |
| 3337-E | 9/4/2008 | N/A | Reliability Performance Incentive Mechanism Results For Performance Year 2007 | 1/26/2009 | N/A |
| 3336-E | 9/4/2008 | N/A | Sale of PG&E's Kern Power Plant Property to World Oil Corp. - Request for Approval Under Section 851 | 1/29/2009 | N/A |
| 3334-E | 9/4/2008 | N/A | Summary of Hedge Transactions in Compliance with Resolution E-4164 Approving Contract for Procurement of Renewable Energy Resources Between Geysers Power Company, LLC and PG&E and an Associated Hedging Plan | 10/6/2008 | N/A |
| 3335-E | 9/3/2008 | 27667 - 27671 | Dynamic Pricing Decision 08-07-045 Dynamic Pricing Memorandum Account to Track Incremental Dynamic Pricing Rates Implementation Expenditures | 9/3/2008 | D.08-07-045 |
| 3327-E | 9/3/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Pit #1-Hat Creek #2-Burney 60kV Power Line Reconductor Project, County of Shasta | 10/15/2008 | N/A |
| 3333-E | 8/29/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month October 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 10/1/2008 | D.05-10-042 |
| 3332-E | 8/29/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Stockton A #1 60kV Reconductoring Project in the City of Stockton | 10/23/2008 | N/A |
| 3331-E | 8/29/2008 | N/A | Notice of Proposed Construction, Pursuant to General Order 131-D, for the Santa Maria-Sisquoc 115kV Reconductor Project, County of Santa Barbara | 12/12/2012 | N/A |
| 3330-E | 8/29/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Glenn #2 60kV Power Line Reconductoring Project, Counties of Glenn and Colusa | 10/28/2008 | N/A |
| 3329-E | 8/29/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Nicolaus-Marysville 60kV Conductor Replacement Project, County of Yuba | 9/28/2008 | N/A |
| 3326-E | 8/27/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Mountain Quarries 60kV Clearance Increase Project, Counties of Placer and El Dorado | 9/26/2008 | N/A |
| 3325-E | 8/25/2008 | N/A | Notification of Executed Easement Agreement Between Pacific Gas and Electric Company and the City of Shasta Lake | 8/25/2008 | D.08-06-038 |
| 3324-E | 8/25/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 4 Replacement Poles in the Las Palmas Tap 115 Kilovolt Power Line, City of Fresno, County of Fresno | 9/24/2008 | N/A |
| 3323-E | 8/22/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Stroud Switch Station-Schindler 70 Kilovolt Power Line Project, County of Fresno | 9/21/2008 | N/A |
| 3322-E | 8/21/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with Klondike Wind Power III LLC and a Firming and Shaping Agreement with Bonneville Power Administration | 12/18/2008 | N/A |
| 3320-E / 2950-G | 8/20/2008 | 27664 - 27666 | Credit/Debit Card Payment Option | 9/19/2008 | N/A |
| 3315-E-A | 8/20/2008 | N/A | Supplemental Advice Filing for Advice 3315-E, Proposed Revisions to the California Solar Initiative Program Handbook (2) | 11/19/2008 | N/A |
| 3321-E | 8/19/2008 | 27659 - 27663 | Addition of Lamp Sizes to Street and Outdoor Lighting Schedules OL-1, LS-1, LS-2 | 10/1/2008 | N/A |
| 3319-E | 8/15/2008 | 27655 - 27658 | Revision of Electric Schedule E-9 Experimental Residential Time-of-Use Service for Low Emission Vehicle Customers to add Plug-in Hybrid Electric Vehicles | 9/15/2008 | N/A |
| 3318-E | 8/14/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with High Plains Ranch II, LLC | 2/20/2009 | N/A |
| 3317-E | 8/14/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Potrero-Bayshore-Martin 115 kV Recabling Project (City of San Francisco, County of San Francisco) | 9/13/2008 | N/A |
| 3313-E | 8/14/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with Topaz Solar Farms LLC. | 1/29/2009 | N/A |
| 3193-E-A | 8/12/2008 | N/A | Supplemental Filing for Amendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company | 11/20/2008 | N/A |
| 3316-E / 2949-G | 8/11/2008 | N/A | Add Fourteen New Sites to Hazardous Substance Mechanism | 9/10/2008 | N/A |
| 3315-E | 8/8/2008 | N/A | Proposed Revisions to the California Solar Initiative Program Handbook (2) | 11/19/2008 | N/A |
| 3311-E | 8/8/2008 | N/A | Proposed Revisions to the California Solar Initiative Program Handbook | 12/18/2008 | N/A |
| 3292-E-A | 8/8/2008 | N/A | Supplemental Filing for Contract for Procurement of Renewable Energy Resources Resulting from PG&E's 2006 Renewables Portfolio Standard Solicitation | 11/21/2008 | N/A |
| 3314-E | 8/7/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for Pole Replacement Along the Fulton #1 60kV Line in the City of Healdsburg (County of Sonoma) | 9/6/2008 | N/A |
| 3310-E | 8/5/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for Pole Relocations Along the Santa Rosa-Corona 115kV Line in the City of Rohnert Park (County of Sonoma) | 9/4/2008 | N/A |
| 3312-E / 2946-G | 8/1/2008 | N/A | Request for Approval to Transfer Program Year(PY) 2008 Electric Low Income Energy Efficiency (LIEE) Funds | 8/31/2008 | N/A |
| 3309-E | 8/1/2008 | N/A | Submission of the Twelfth Gas Supply Plan (GSP-12) for the California Department of Water Resources (CDWR) Tolling Agreements (October 1, 2008, Through October 31, 2009) | 10/1/2008 | D.02-12-069 and D.03-04-029 |
| 3308-E | 7/31/2008 | N/A | Modifications to Existing Agreement with San Francisco Bay Area Rapid Transit District | 7/31/2008 | N/A |
| 3306-E | 7/31/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month September 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 9/1/2008 | 05-10-042 |
| 3305-E | 7/31/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Plainfield Tap 60kV Power Line Relocation in the County of Yolo | 8/30/2008 | N/A |
| 3307-E / 2944-G | 7/30/2008 | 27650 - 27652 | Minor Revisions to PG&E Form 62-0980 - Distribution Service and Extension Agreement, Declarations - to Add Information and to Update Naming of Exhibits. | 8/29/2008 | N/A |
| 3304-E | 7/30/2008 | N/A | Procurement Transaction Quarterly Compliance Filing (Q2, 2008) | 1/9/2009 | N/A |
| 3303-E / 2943-G | 7/28/2008 | 27646 - 27649 | PG&E's Compliance Advice Letter for the California Institute for Climate Solutions, Decision 08-04-039 | Rejected | 08-04-039, 08-04-054 |
| 3302-E / 2942-G | 7/24/2008 | N/A | Add Two New Sites to Hazardous Substance Mechanism | 8/25/2008 | N/A |
| 3301-E | 7/24/2008 | 27643 - 27645 | Revisions to Preliminary Statement EL - Renewables Portfolio Standard Cost Memorandum Account | 7/24/2008 | N/A |
| 3300-E | 7/23/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Granite Construction Company 115kV Interconnection Project (County of San Joaquin) | 8/22/2008 | N/A |
| 3299-E / 2939-G | 7/22/2008 | N/A | ClimateSmart Purchase of Verified Emission Reductions under the Landfill Project Reporting Protocol in Compliance with Decision 06-12-032 | 12/8/2008 | N/A |
| 3297-E-A | 7/17/2008 | 27640 - 27642 | Supplemental Advice Filing for Advice 3297-E, New Simplified Distribution and Service Line Extension Agreement for Expedited Electric Connection of Agricultural Water Pumps (Form 79-1108) | 7/17/2008 | N/A |
| 3246-E-A / 2919-G-A | 7/17/2008 | 27636 - 27639 | Supplement: Eliminate Form 79-865 - Electric and Gas Monitoring Meter Pulse Agreement and Incorporate Minor Revisions to Form 79-1049 - Agreement to Install Applicant Requested Common Facilities | 8/1/2008 | N/A |
| 3298-E / 2938-G | 7/16/2008 | N/A | Request Authorization to Shift Prior Years' Unspent, Uncommitted Gas and Electric Energy Efficiency Funds to Ensure Adequate Funding of Current 2006-2008 Programs | 11/6/2008 | N/A |
| 3296-E | 7/16/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 6 Poles on the Kearney-Biola 70 Kilovolt Power Line in the City of Fresno, County of Fresno | 8/15/2008 | N/A |
| 3295-E | 7/15/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Lockheed #1 115kV Tap Underbuild Project, City of Sunnyvale, County of Santa Clara | 8/14/2008 | N/A |
| 3297-E | 7/14/2008 | 27633 - 27635 | New Simplified Line Extension Letter Agreement For Agricultural Line Extensions for Water Pumps in Response to Declaration of Emergency (Form 79-1108) | Superceded | N/A |
| 3294-E / 2937-G | 7/11/2008 | N/A | Request for Authorization to Offer the Home Services Program on a Non-Tariffed Basis | Rejected | N/A |
| 3197-E-A | 7/11/2008 | N/A | Supplement - Standard Contract For Certain Qualifying Facilities Pursuant To Decision 07-09-040 | Withdrawn | N/A |
| 3293-E | 7/8/2008 | 27630 - 27632 | Request to File New Streetlight Application for Service | 8/7/2008 | N/A |
| 3292-E | 7/1/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from PG&E's 2006 Renewables Portfolio Standard Solicitation | 11/21/2008 | N/A |
| 3256-E-A | 7/1/2008 | 27627 - 27629 | Supplement - Customer Access To Meter Data in Compliance with Decision 06-07-027 | 5/23/2008 | N/A |
| 3291-E | 6/30/2008 | 27605 - 27622 | Elimination of Voluntary Time-of-Use Meter Charges Under SmartMeter Billing | 7/30/2008 | 07-09-004 |
| 3290-E / 2934-G | 6/30/2008 | N/A | Affiliate Transaction Rules Compliance Plan | 6/30/2008 | N/A |
| 3289-E | 6/30/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month August 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 8/1/2008 | 05-10-042 |
| 3288-E | 6/30/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Wilson-Oro Loma 115 Kilovolt Power Line, County of Merced | 7/30/2008 | N/A |
| 3287-E | 6/30/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Wilson-Gregg 230 Kilovolt Tranmission Line, County of Madera | 7/30/2008 | N/A |
| 3281-E-A | 6/30/2008 | 27623 - 27626 | Supplement to PG&E's Request for Modification of the Market Redesign and Technology Upgrade Memorandum Account for Clarification | 7/30/2008 | N/A |
| 3286-E | 6/27/2008 | N/A | Power Partners Southwest, LLC, Easements - Request for Approval Under Section 851 | 8/21/2008 | N/A |
| 3285-E | 6/26/2008 | 27584 - 27604 | Revise the Applicability of Electric Rate Schedules E-7 and EL-7 in Compliance with Decision 08-06-011 | 6/26/2008 | 06-08-011 |
| 3284-E / 2931-G | 6/17/2008 | 27578 - 27583 | Revisions to Applications for Service, Forms 62-0683, 62-0684, 62-0685, and 62-0686 | 7/17/2008 | N/A |
| 3283-E | 6/17/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Cogeneration National 60kV Interconnection Project in the City of Stockton | 7/17/2008 | N/A |
| 3282-E | 6/17/2008 | N/A | SGIP Equipment Transfer/Removal Request for Approval Under Section 851 | 8/21/2008 | N/A |
| 3281-E | 6/16/2008 | 27568 - 27570 | PG&E's Request for Modification of the Market Redesign and Technology Upgrade Memorandum Account for Clarification | 7/16/2008 | N/A |
| 3280-E | 6/12/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreements with San Joaquin Solar 1, LLC and San Joaquin Solar 2, LLC | 12/18/2008 | N/A |
| 3279-E | 6/12/2008 | 27574 - 27577 | Cleanup to Electric Public Goods Charge Preliminary Statements for Renewables and Research, Development and Demonstration | 6/19/2008 | N/A |
| 3264-E-A | 6/11/2008 | 27571 - 27573 | Supplemental Filing of New Form 79-1105 -- Agreement for Unmetered Electric Service to Seasonal Lighting Loads Connected to Festoon Outlets on Pacific Gas and Electric Company's Street Light Facilities | 7/11/2008 | N/A |
| 3272-E-A / 2925-G-A | 6/9/2008 | 27565 - 27567 | Supplement: Revision of Form 62-0687- Application for Service, Existing Service - Relocation/Change Service, To Streamline and Expedite Application Process (see also 2925-G-A) | 6/19/2008 | N/A |
| 3277-E / 2929-G | 6/4/2008 | 27560 - 27564 | Cleanup of Electric and Gas Preliminary Statements for Customer Energy Efficiency Adjustment Balancing Account [See also: 2929-G] | 7/4/2008 | N/A |
| 3278-E | 6/3/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the West Sacramento-Brighton 115kV and Rio Oso-West Sacramento 115kV Reconductoring Projects (Cities of Sacramento and West Sacramento) | 7/3/2008 | N/A |
| 3276-E | 5/30/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month July 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 7/1/2008 | N/A |
| 3275-E / 2927-G | 5/29/2008 | 27557 - 27559 | Close PG&E's Current Pilot Credit Card Program | 9/18/2008 | N/A |
| 3274-E / 2926-G | 5/23/2008 | 27554 - 27556 | June 1, 2008 Gas Core Procurement Rate Changes and Ministerial Revision to Electric Rate Schedule E-CS [SEE ALSO 2926-G] | 6/1/2008 | 06-12-032 |
| 3273-E | 5/21/2008 | 27551 - 27553 | Revision to Public Purpose Program Revenue Adjustment Mechanism (PPPRAM) | 5/21/2008 | E-4160 |
| 3272-E / 2925-G | 5/20/2008 | 27548 - 27550 | Revision of Form 62-0687- Application for Service, Existing Service - Relocation/Change Service, To Streamline and Expedite Application Process (see also 2925-G) | Superceded | N/A |
| 3257-E-A | 5/20/2008 | N/A | Supplemental Information: Modification of Existing Mass Market Program to Offer Limited Marketing Campaign of Fluorescent Lamp Recycling | 5/27/2008 | N/A |
| 3271-E | 5/16/2008 | 27543 - 27544 | Recovery of Outstanding Balance in the Interruptible Load Program Memorandum Account | 6/15/2008 | 07-02-028 |
| 3270-E | 5/16/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Gold Hill-Clarksville 115kV and Gold Hill #1 60kV Reconductoring Project in the Cities of Folsom and El Dorado Hills | 6/15/2008 | N/A |
| 3165-E-A | 5/16/2008 | 27545 - 27547 | Supplement - Revisions to the Cost Recovery of Incentives Paid to Third Party Demand Response Aggregators Participating in PG&E's Base Interruptible Program (Schedule E-BIP) Resulting from Decision (D.) 07-09-004 | 6/15/2008 | N/A |
| 3213-E-A | 5/15/2008 | 27536 - 27542 | Supplement: Proposed Modifications to the Business Energy Coalition (BEC) Program, Rate Schedule E-BEC, in Compliance with Resolution E-4163 | 5/15/2008 | E-4163 |
| 3269-E | 5/14/2008 | N/A | Notification of Revised Utility Gas Supply Plan Reporting Requirements for the California Department of Water Resources (CDWR) tollling Agreements in Compliance With D.07-12-052 | 5/14/2008 | N/A |
| 3268-E / 2924-G | 5/14/2008 | 27505 - 27654 | Revised Household Income Requirements for California Alternate Rates for Energy Program (CARE) and Revised Income Limits for Family Electric Rate Assistance (FERA) Program [SEE ALSO 2924-G] | 6/1/2008 | E-3524 |
| 3233-E-A | 5/12/2008 | N/A | Supplemental Filing for Pacific Gas and Electric Company's Conformed 2006 Long-Term Procurement Plan | 6/26/2008 | N/A |
| 3267-E | 5/9/2008 | 27502 - 27504 | Revisions to PG&E's Tariff for the Purchase of Eligible Renewable Generation from Small Renewable Generators (E-SRG) | 5/9/2008 | N/A |
| 3266-E | 5/2/2008 | 27499 - 27501 | Revisions to PG&E's Community Choice Aggregator (CCA) Service Agreement (Form Number 79-1029) | 6/2/2008 | 08-04-056 |
| 3265-E | 5/2/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Moss Landing-Crazy Horse 115kV Reconductoring Project, Monterey County | 6/1/2008 | N/A |
| 3264-E | 5/2/2008 | 27496 - 27498 | New Form 79-1105 -- Agreement for Unmetered Electric Service to Seasonal Lighting Loads Connected to Festoon Outlets on Pacific Gas and Electric Company's Street Light Facilities | Superceded | N/A |
| 3263-E | 4/30/2008 | N/A | 2008 Supplemental Revenue Requirement Determination of the Department of Water Resources (DWR) | 5/1/2008 | N/A |
| 3262-E | 4/30/2008 | N/A | Procurement Transaction Quarterly Compliance Filing (Q1, 2008) | 10/26/2008 | D.02-10-062, D.03-06-076, D.03-12-062 |
| 3261-E | 4/30/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month June 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 6/1/2008 | D.05-10-042 |
| 3260-E | 4/30/2008 | N/A | Third Amendment to the Power Purchase and Sale Agreement for Procurement of Eligible Renewable Energy Resources Between CalRENEW-1 LLC and PG&E | 11/6/2008 | N/A |
| 3238-E-B | 4/29/2008 | 27331 - 27495 | Supplement - Electric Rate Changes for Revisions to, and Approvals of, PG&E's 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, CEMA, and Residential Electric Baseline Quantities | 5/1/2008 | 08-04-025,08-04-026, 08-02-018,08-04-008,07-09-004 |
| 3259-E | 4/25/2008 | N/A | Diablo Canyon Unit 2 Steam Generator Replacement (Utility Generation Balancing Account Revenue Requirement) | 4/25/2008 | N/A |
| 3258-E | 4/25/2008 | 27318 - 27330 | Change Name of Cafeteria Style Menu Program to PeakChoice | 4/25/2008 | N/A |
| 3257-E | 4/22/2008 | N/A | Modification of Existing Mass Market Program to Offer Limited Marketing Campaign of Fluorescent Lamp Recycling | 5/27/2008 | N/A |
| 3256-E | 4/22/2008 | 27315 - 27317 | Customer Access To Meter Data in Compliance with Decision 06-07-027 and Revisions to Meter Read Presentation on Customer Bills | 5/23/2008 | N/A |
| 3255-E / 2920-G | 4/22/2008 | N/A | Request for Approval to Transfer Program Year (PY) 2007 Unspent Electric Low Income Energy Efficiency (LIEE) Carryover Funds (see also 2990-G) | 5/22/2008 | N/A |
| 3254-E | 4/21/2008 | N/A | Contract Amendment and Modification Related to the Implementation of MRTU | 5/21/2008 | N/A |
| 3253-E | 4/21/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Bogue 115kV Loop Tower Replacement Project, County of Yuba | 5/21/2008 | N/A |
| 3252-E | 4/18/2008 | N/A | Confirmation of PG&E's Nominee to the Committee of its Nuclear Decommissioning Trust Funds | 7/31/2008 | N/A |
| 3251-E | 4/18/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Hammer-Country Club 60kV Power Line Relocation in the City of Stockton | 5/18/2008 | N/A |
| 3250-E | 4/18/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Gold Hill #1 60kV distribution Installation Project in the County of El Dorado | 5/18/2008 | N/A |
| 3249-E | 4/18/2008 | N/A | 2007 Vegetation Management Balancing Account | 5/18/2008 | N/A |
| 3248-E | 4/14/2008 | N/A | Submits Notice of Construction, Pursuant to General order 131-D, for the Construction of Marysville-Nicolaus 60kV Electric Distribution Underbuild Installation in the County of Yuba | 5/14/2008 | N/A |
| 3247-E | 4/14/2008 | 27309 - 27314 | Establish the Long-Term Procurement Plan Technical Assistance Memorandum Account (LTMA) in Compliance with Decision 07-12-052, Opinion Adopting Pacific Gas and Electric Company's, and San Diego Gas & Electric Company's Long Term Procurement Plans | 5/14/2008 | 07-12-052 |
| 3246-E / 2919-G | 4/7/2008 | 27307 - DELETE | Eliminate Form 79-865 - Electric and Gas Monitoring Meter Pulse Agreement (see also 2919-G) | Superceded | N/A |
| 3244-E | 4/4/2008 | N/A | Clear Lake-Eagle Rock 60kV Pole Replacement Project, Lake County (GO 131-D) | 5/2/2008 | N/A |
| 3238-E-A | 4/4/2008 | DRAFT | Supplemental Filing for Electric Rate Changes for Revisions to, and Approvals of, PG&E s 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, and Residential Electric Baseline Quantities | 5/1/2008 | N/A |
| 3245-E | 4/1/2008 | N/A | Annual Adjustments to the Electric Public Goods Charge Funding Obligations in Compliance with Resolution E-3792 | 5/1/2008 | N/A |
| 3243-E | 4/1/2008 | N/A | Contracts for Procurement of Renewable Energy Resources Resulting from Power Purchase Agreements between Affiliates of BrightSource Energy, Inc. and PG&E | Withdrawn | N/A |
| 3242-E | 4/1/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance - May 2008 Submitted Pursuant to D.05-10-042, Opinion on RA Requirements | 5/1/2008 | N/A |
| 3241-E | 4/1/2008 | N/A | Diablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter | 5/1/2008 | N/A |
| 3240-E | 4/1/2008 | N/A | Proposed Amendments to Demand Response Aggregator Contracts | 6/12/2008 | N/A |
| 3239-E | 3/28/2008 | N/A | Proposed Plan for 5% Accuracy Certification Requirements and Testing Procedures for Inverter-Integrated Meters | 4/28/2008 | N/A |
| 3238-E | 3/28/2008 | N/A | Electric Rate Changes for Revisions to, and Approvals of, PG&E's 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, and Residential Electric Baseline Quantities. | 5/1/2008 | N/A |
| 3237-E | 3/28/2008 | N/A | 2008 Energy Resource Recovery Account (ERRA) Trigger Amount Compliance with Decision 04-12-048 | 4/28/2008 | N/A |
| 3236-E | 3/28/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 9 Poles in Kern-Old River #2 70 Kilovolt Power Line, County of Kern, City of Bakersfield | 4/27/2008 | N/A |
| 3235-E | 3/26/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the construction of Table Mountain-Pease 60kV Power Line Disconnect Switch Installation at Live Oak Substation Project, County of Sutter | 5/25/2008 | N/A |
| 3234-E | 3/26/2008 | N/A | Updated Schedules 1 and 3 of the Operating Agreement Between the CDWR and PG&E as Adopted in D.03-04-029 and D.04-10-035 | Pending | N/A |
| 3220-E-A | 3/25/2008 | N/A | Supplement - PG&E's 2007 Cooling Center Pilot Program Report and 2008 Program Proposal | 4/15/2008 | N/A |
| 3100-E-B | 3/24/2008 | N/A | Supplemental Filing for PG&E's Standard Contract for the Purchase of Eligible Renewable Generation from Small Renewable Generators | 2/14/2008 | N/A |
| 3098-E-B | 3/24/2008 | N/A | Supplemental Filing for PG&E's Standard Contract for the Purchase of Eligible Renewable Generation from Public Water and Wastewater Facilities | 2/14/2008 | N/A |
| 3211-E-A | 3/21/2008 | N/A | Supplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Geysers Power Company, LLC and PG&E | 2/16/2008 | N/A |
| 3233-E | 3/19/2008 | N/A | Pacific Gas and Electric Company's 2006 Long-Term Procurement Plan Proceeding Compliance Filing | 6/26/2008 | N/A |
| 3214-E-A | 3/19/2008 | 27296 - 27306 | Supplement - Implementation of the Cost Recovery Provisions Supporting the Settlement Agreement Adopted for PG&E's Large Scale Air Conditioning Direct Load Control Program (AC Program) Approved by Decision (D.) 08-02-009 | 3/1/2008 | N/A |
| 3232-E | 3/18/2008 | N/A | Correction to the Gas and Electric Allocation of the Self Generation Incentive Program (SGIP) Funding (see also 2913-G) | 4/17/2008 | N/A |
| 3231-E | 3/17/2008 | 27293 - 27295 | Consolidation of Approved Changes to Electric Rate Schedules E-SDL | 4/16/2008 | N/A |
| 3230-E | 3/14/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Wadham Energy L.P. and PG&E | 7/31/2008 | N/A |
| 3229-E | 3/12/2008 | 27274 - 27292 | Revisions to Demand Response Program Electric Tariffs to Implement Demand Response On-line Enrollment | 4/18/2008 | N/A |
| 3228-E | 3/11/2008 | N/A | Sanger-California #1 70kV - Distribution Reconductor (County of Fresno). | 4/10/2008 | N/A |
| 3227-E | 3/10/2008 | 27268 - 27273 | Community Choice Aggregation Service (CCA Service) Tariff Revisions in Compliance with Decision 08-02-013. | 4/9/2008 | N/A |
| 3225-E / 2910-G | 3/10/2008 | N/A | Notification of the Creation of Two New Affiliates (see also 2910-G) | 3/10/2008 | N/A |
| 3226-E | 3/7/2008 | N/A | Table Mountain-Palermo 230kV Reconductoring, County of Butte | 4/6/2008 | N/A |
| 3224-E | 3/5/2008 | 27236 - 27267 | Implementation of CPUC Decision (D.) 08-02-002 Order Addressing Pacific Gas and Electric Company's Community Choice Aggregation Net Energy Metering Service Option | 4/4/2008 | N/A |
| 3222-E | 3/4/2008 | N/A | Metcalf-Moss Landing 230kV Reconductoring Project, Counties of Santa Clara, Monterey and Santa Cruz | 4/3/2008 | N/A |
| 3223-E | 3/3/2008 | 27233 - 27235 | Revisions to Applicability Statement for Street Light Schedule LS-2 Customer-Owned Street and Highway Lighting | 4/2/2008 | N/A |
| 3221-E | 3/3/2008 | 27204 - 27232 | Electric Demand Response Tariffs Clean-Up | 4/2/2008 | N/A |
| 3218-E | 3/3/2008 | 27224 - 27228 | Modification of Energy Resource Recovery Account (ERRA) Preliminary Statement to Include Independent Evaluator Costs | 5/1/2008 | N/A |
| 3220-E | 2/29/2008 | 27199 - 27203 | PG&E's 2007 Cooling Centers Pilot Program Report and 2008 Program Proposal | 4/15/2008 | N/A |
| 3219-E | 2/29/2008 | N/A | Resource Adequacy (RA) Monthly Compliance Filing for April 2008 | 4/1/2008 | N/A |
| 3037-E-A | 2/29/2008 | N/A | 2007 General Rate Case, Restoration of Service Fee Update | 3/31/2008 | N/A |
| 3216-E | 2/27/2008 | N/A | Gold Hill-Eight Mile 230kV Tower Relocation in the City of Elk Grove | 3/28/2008 | N/A |
| 3214-E | 2/27/2008 | 27186 - 27196 | Implementation of the Cost Recovery Provisions Supporting the Settlement Agreement Adopted for PG&E s Large Scale Air Conditioning Direct Load Control Program ( AC Program ) by Decision (D.) 08-02-009 | Superceded | N/A |
| 3202-E-A | 2/27/2008 | 27079 - 27185 | Supplement - Electric Rate Changes for Transmission (TO10), PacifiCorp Settlement, Transmission Access Charge Balancing Account Adjustment, and Air Conditioning Direct Load Control Program | 3/1/2008 | N/A |
| 3215-E | 2/26/2008 | N/A | Relocation of Rose Tap 70 Kilovolt Power Line, County of Kern | 3/27/2008 | N/A |
| 3217-E | 2/25/2008 | 27177 - 27179 | Tariff Revision for Rate Schedule LS-1 | 1/1/2008 | N/A |
| 3213-E | 2/22/2008 | 27161 - 27167 | Proposed Modifications to the Business Energy Coalition (BEC) Program, Rate Schedule E-BEC | Superceded | N/A |
| 3212-E | 2/22/2008 | 27174 - 27176 | Revision of PG&E's Tariffs to Reflect Temporarily Lower ITCC Rates Due to Tax Law Changes. | 3/1/2008 | N/A |
| 3153-E-A / 2885-G-A | 2/20/2008 | 27070 - 27078 | Supplemental Filing-Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Compliance with Decision 07-07-019 [see also 2885-G-A] | 5/12/2008 | N/A |
| 3100-E-A | 2/20/2008 | 26845 - 26850 | Implementation of Resolution E-4137 Approving the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from Small Renewable Generators | 2/14/2008 | N/A |
| 3098-E-A | 2/20/2008 | 26839 - 26844 | Implementation of Resolution E-4137 Approving the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from Public Water and Wastewater Facilities | 2/14/2008 | E-4137 |
| 3211-E | 2/15/2008 | N/A | Contract for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Geysers Power Company, LLC and PG&E | 2/16/2008 | N/A |
| 3210-E | 2/15/2008 | N/A | Notice of Construction Carneras-Taft 70 Kilovolt Power Line Pole Replacement Project, County of Kern | 3/16/2008 | N/A |
| 3209-E | 2/14/2008 | N/A | Qualifying Facility Contract Amendments | 3/15/2008 | N/A |
| 3208-E / 2903-G | 2/11/2008 | N/A | Transfer Unspent 2007 PG&E ClimateSmart Program Administrative and Marketing Funds to 2008 (see also 2903-G) | 9/18/2008 | G-3414 |
| 3143-E-A | 2/8/2008 | N/A | Supplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Shiloh Wind Partners, LLC and PG&E. | 4/10/2008 | N/A |
| 3207-E | 2/7/2008 | 27061 - 27067 | Proposed Revisions to Electric Preliminary Statement Part M California Alternate Rates for Energy Account (CAREA), and Electric Preliminary Statement Part CZ Distribution Revenue Adjustment Mechanism (DRAM) to Clarify Ratemaking for CARE and FERA | 3/8/2008 | N/A |
| 3206-E / 2901-G | 2/5/2008 | N/A | Limited One Time Agreement to Perform Tariff Scheduled Related Work for the County of Placer (see also 2901-G). | 2/5/2008 | N/A |
| 3150-E-A | 2/5/2008 | N/A | Supplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Ausra and PG&E. | Withdrawn | N/A |
| 3205-E | 2/1/2008 | N/A | Demand Response Contract Amendments | 3/2/2008 | N/A |
| 3204-E | 2/1/2008 | N/A | Submission of the Eleventh Gas Supply Plan (GSP-11) for the California Department of Water Resources (CDWR) Tolling Agreements (April 1, 2008, through September 30, 2008) | 4/1/2008 | N/A |
| 3203-E | 1/31/2008 | N/A | Monthly Resource Adequacy (RA) Filing for Compliance-Month March 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements | 2/1/2008 | N/A |
| 3202-E | 1/30/2008 | N/A | Electric Rate Changes for Transmission (TO10), PacifiCorp Settlement, Transmission Access Charge Balancing Account Adjustment, and Air Conditioning Direct Load Control Program | 3/1/2008 | N/A |
| 3201-E | 1/30/2008 | N/A | Notice of Construction, Pursuant to General Order 131-D, for the Lammers-Kasson and Vierra-Tracy-Kasson 115kV Reconductoring Projects | 2/29/2008 | N/A |
| 3200-E | 1/30/2008 | 27058 - 27060 | Revisions to LS2 Customer Owned Street and Highway Lighting Tariff for Testing of Energy Efficient Street Light Technologies | 2/29/2008 | N/A |
| 3199-E | 1/30/2008 | N/A | Procurement Transaction Quarterly Compliance Filing (Q4, 2007) | 8/1/2008 | N/A |
| 3198-E | 1/15/2008 | N/A | Notification of Completed Transfer of Non-exclusive Easement for the Extension of the Lake Almanor Recreational Trail Located in Plumas County in Accordance with D.07-11-031 | 2/26/2008 | N/A |
| 3197-E | 1/14/2008 | N/A | Standard Contract For Certain Qualifying Facilities Pursuant To Decision 07-09-040 | Withdrawn | N/A |
| 3196-E / 2898-G | 1/11/2008 | N/A | Second Deviation from PG&E Tariffs for Special Service Request | 1/11/2008 | N/A |
| 3195-E | 1/11/2008 | N/A | Notice of the PacifiCorp Settlement (PacifiCorp) and the Transmission Access Charge Balancing Account Adjustment (TACBAA) filings with the Federal Energy Regulatory Commission | 11/16/2012 | N/A |
| 3193-E | 1/11/2008 | N/A | Amendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company | 11/20/2008 | N/A |
| 3194-E | 1/9/2008 | 27054 - 27057 | Revision of Electric Rate Schedule E-DCG Departing Customer Generation, CG | 5/3/2007 | N/A |
| 3192-E | 1/7/2008 | N/A | Contract Amendments and Modifications Related to the Implementation of MRTU | 2/6/2008 | N/A |
| 3191-E | 1/7/2008 | N/A | Herndon-Bullard 115 kilovolt #1 and #2 Reconductoring Project, Counties of Fresno and Madera | 2/7/2008 | N/A |
| 3190-E | 1/7/2008 | N/A | Submits Notice of Construction, Pursuant to General Order 131-D, for the construction of the US Wind Power Tap 60kV Pole Line Relocation Project | 2/7/2008 | N/A |
| 3189-E | 1/3/2008 | N/A | Transfer of Annual Performance Test Monitoring From the California Department of Water Resources (DWR) to Pacific Gas and Electric Company (PG&E) Consistent With the Operating Agreement Between DWR and PG&E | 2/2/2008 | N/A |
For further tariff information, or Web Tariff Book suggestions please send an email to Tariffs.