2008 ADVICE FILING INDEX - ELECTRIC

Advice No.Date FiledTariff Sheet No.SubjectEffective DateDecision No.
3392-E / 2984-G
PDF
12/30/200828016 - 28018Customer Access To Meter Data in Compliance with Decision 06-07-027SupercededN/A
3391-E
PDF
12/30/200828008 - 28010Agreement between Pacific Gas and Electric Company and East Bay Municipal Utilities District Pursuant to PUC Code 2829SupercededN/A
3389-E
PDF
12/30/2008N/ANatural Gas Storage Services Contract for PG&E Electric Fuels1/30/2009N/A
3361-E-A
PDF
12/30/200828011 - 28015Supplement: Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-0161/1/2009N/A
3349-E-A
PDF
12/30/200827884 - 28007Supplement: Annual Electric True-Up Filing -- Change PG&E Electric Rates on January 1, 20091/1/2009E-4217
3390-E
PDF
12/29/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Palermo-Colgate-Rio Oso 230kV Transmission Line Reconductoring Project - Counties of Butte, Sutter, and Yuba 4/7/2009N/A
3388-E
PDF
12/22/200827867 - 27880Revisions to Electric Tariffs in Compliance with Decision 08-12-038 - Bridge Funding for 2009 Demand Response Programs 1/1/2009N/A
3387-E
PDF
12/22/200827881 - 27883Request Approval to Establish the Land Conservation Plan Environmental Remediation Memorandum Account (LCPERMA), Per Commission Decision 08-11-0432/1/200908-11-043
3386-E
PDF
12/22/2008N/AContract between PG&E and El Dorado Energy, LLC for Procurement of Renewable Energy Resources Resulting from PG&E's 2008 Renewables Portfolio Standard (RPS) Solicitation5/21/2009N/A
3385-E
PDF
12/22/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Carbona #1 60kV Tap Reconductoring Project - City of Tracy and County of San Joaquin 12/12/2012N/A
3384-E
PDF
12/22/2008N/ACalculation Of Indifference Payments In Compliance With Decision 08-11-0561/12/2009N/A
3383-E
PDF
12/19/2008N/AElectric Rule 15/16 Exceptional Case Line Extension Agreement for Nevada County 12/19/2008N/A
3382-E
PDF
12/19/2008N/AProposed Amendments to the California Solar Initiative Program Handbook to Revise Metering Requirements and Performance Based Incentive Payment Terms and to Incorporate Performance Data Provider Requirements (Joint AL with CCSE)PendingN/A
3381-E / 2981-G
PDF
12/18/200827862 - 27866Revise Section K -- Summary Billing in Gas and Electric Rule 9 to Reflect New Billing Requirements, and Eliminate Standard Form M62-1491 Summary Billing Agreement (See also 2981-G)1/20/2009N/A
3380-E / 2980-G
PDF
12/18/2008N/A1% Franchise Surcharge For Gas And Electric Customers Within The City of Bakersfield (see also 2980-G)1/20/2009N/A
3376-E
PDF
12/16/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Table Mountain-Pease 60kV Power Line Relocation, County of Butte1/15/2009N/A
3379-E
PDF
12/15/2008N/A2009 Department of Water Resources (DWR) Revenue Requirement Determination 1/1/2009N/A
3378-E
PDF
12/15/2008N/AProposed Amendments to the California Solar Initiative Program Handbook to Incorporate the Multifamily Affordable Solar Housing Program and to Implement Track 1 IncentivesPendingN/A
3377-E
PDF
12/15/2008N/ANotice of the Transmission Access Charge Balancing Account Adjustment (TACBAA) filing with the Federal Energy Regulatory Commission 3/1/2009N/A
3375-E / 2979-G
PDF
12/12/2008N/ARequest for Approval to Adjust the Year (PY) 2009-2011 Gas and Electric Low Income Energy Efficiency (LIEE) Expense Ratio and Budget Allocation Factors2/6/2009N/A
3197-E-B
PDF
12/10/2008N/ASecond Supplement - Standard Contract For Certain Qualifying Facilities Pursuant to Decision 07-09-040WithdrawnN/A
3374-E / 2977-G
PDF
12/8/2008N/AClimateSmart Program Purchase of Verified Emission Reductions Under the Urban Forestry Project Reporting Protocol in Compliance With Decision 06-12-0322/11/2009N/A
3299-E-A / 2939-G-A
PDF
12/8/2008N/ASupplement: ClimateSmart Purchase of Verified Emission Reductions Under the Landfill Project Reporting Protocol in Compliance With Decision 06-12-03212/8/2008N/A
3373-E
PDF
12/5/200827854 - 27858Routine Annual Advice Filing for Dedicated Rate Component Series 1 and Series 2 Charge True-up Mechanism1/1/200904-11-015
3372-E / 2975-G
PDF
12/2/200827851 - 27853Tariff Revisions to Reflect an Increase in Income Tax Component of Contribution Tax Factor1/1/2009N/A
3371-E
PDF
12/1/2008N/ASt. Joseph Hospital of Eureka Sole Customer Facility Sale -- Request for Approval Under Section 8516/18/2009N/A
3370-E / 2974-G
PDF
12/1/2008N/AAdd Two New Sites to Hazardous Substance Mechanism12/31/2008N/A
3356-E-A / 2967-G-A
PDF
11/25/2008N/AEnergy Efficiency, Decision 10-08-027 Bridge Funding for 2009 Energy Efficiency Programs Compliance Advice Letter, Update1/1/2009N/A
3369-E
PDF
11/24/2008N/AElectric Rule 15/16 Exceptional Case Agreement for the East Bay Municipal Utilities District Camanche Pumping Plant 11/24/2008N/A
3368-E
PDF
11/24/2008N/AThird Extension of Three Biomass Generation Power Purchase Agreements Resulting from PG&E's Interim Renewable Energy Solicitation2/20/2009N/A
3365-E
PDF
11/24/2008N/AMethodology for Calculation of Non-Bypassable Charges for Mountain House Customers (Modesto Irrigation District) 12/24/2008N/A
3364-E
PDF
11/24/200827838 - 27850Revisions to Schedule S (Standby Service) Pursuant to D.07-09-0041/1/200907-09-004
3367-E
PDF
11/21/2008N/AContract between PG&E and Hatchet Ridge Wind, LLC for Procurement of Renewable Energy Resources Resulting from PG&E's 2005 Renewables Portfolio Standard (RPS) Solicitation2/20/2009N/A
3366-E
PDF
11/20/2008N/ADrum-Rio Oso 115kV Power Line Tower 38/275 Relocation Project, County of Placer12/20/2008N/A
3234-E-A
PDF
11/20/2008N/ASupplement Advice Letter for 3234-E, Updated Schedules 1 and 3 of the Operating Agreement Between the CDWR and PG&E as adopted by the CPUC D.03-04-029, and modified by the CPUC D.04-10-035 12/20/2008N/A
3363-E
PDF
11/17/200827832 - 27837Establishment of Schedule NEMCCSF- Net Energy Metering Service For City and County of San Francisco Municipal Load Served by Hetch Hetchy and a Solar Generator SupercededPUC Section 2828 (f)
3362-E
PDF
11/14/2008N/ARequest for Approval of Gateway Generating Station Updated Revenue Requirement 12/15/2008N/A
3361-E
PDF
11/14/2008N/ASchedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-0161/1/2009N/A
3360-E
PDF
11/12/200827828 - 27831Revision to Demand Response Base Interruptible Program Rate Schedule E-BIP12/12/2008N/A
3110-E-A
PDF
11/12/2008N/ASupplement Advice Letter for Advice 3110-E, Notice of Federal Energy Regulatory Commission Rate Increase Filing (TO10) PendingN/A
3359-E
PDF
11/4/2008N/AAnniversary True-up Mechanism Advice Filing for Dedicated Rate Component (DRC) Series 2005-1 and 2005-2 Charges11/6/2008N/A
3357-E
PDF
10/31/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month December 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements12/1/2008N/A
3358-E
PDF
10/30/2008N/AProcurement Transaction Quarterly Compliance Filing (Q3, 2008)5/14/2009N/A
3356-E / 2967-G
PDF
10/27/200827825 - 27827Energy Efficiency - Decision 10-08-027 Bridge Funding for 2009 Energy Efficiency Programs Compliance Advice Letter1/1/200910-08-027
3355-E
PDF
10/17/2008N/ANotice of Federal Energy Regulatory Commission Rate Increase Filing (TO11)3/1/2009N/A
3354-E / 2963-G
PDF
10/17/200827777 - 27824Clean-Up of Gas and Electric Tariffs (see also 2963-G)11/16/2008N/A
3353-E
PDF
10/16/200827763 - 27776Revisions to Electric Rule 211/15/2008N/A
3350-E
PDF
10/14/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Soledad #1 60 kV Pole Replacement, County of Monterey 11/13/2008N/A
3352-E
PDF
10/7/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 53 Wood Poles on the Caruthers-Kingsburg 70kV Power Line, County of Fresno 11/6/2009N/A
3351-E
PDF
10/7/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 3 Poles in the McCall-Reedley 115 Kilovolt Power Line, County of Fresno11/6/2008N/A
3298-E-A / 2938-G-A
PDF
10/3/2008N/ASupplemental for Pacific Gas and Electric Company's Advice 2938-G/3298-E 11/6/2008N/A
3349-E
PDF
10/1/2008N/AAnnual Electric True-Up Filing -- Change PG&E Electric Rates on January 1, 20091/1/2009N/A
3348-E
PDF
10/1/200827760 - 27762Extend Experimental Status of Schedule E-AMDS - Experimental Access To Meter Data Services10/31/2008N/A
3347-E
PDF
9/30/200827676 - 27759June 2008 ERRA Trigger - Update to Reflect Acutal Recorded ERRA Balance Through August 31, 2008 for October 1, 2008 Rate Change10/1/200808-08-011
3345-E
PDF
9/30/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month November 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements11/1/2008D.05-10-042
3346-E
PDF
9/29/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 4 Replacement Poles in the Henrietta-Kingsburg 115 Kilovolt Power Line, County of Kings10/29/2008N/A
3193-E-B
PDF
9/29/2008N/ASecond Supplement - Amendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company11/20/2008N/A
3344-E / 2958-G
PDF
9/24/200827672 - 27675ClimateSmart Charity Servicing Agreement and Revisions to Gas and Electric ClimateSmart Balancing AccountsSupercededN/A
3343-E
PDF
9/23/2008N/ACity and County of Fresno Pedestrian Walkway Easement - Request for Approval Under Section 85112/4/2008N/A
3341-E
PDF
9/12/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Vacaville-Suisun-Jameson 115kV Wood Pole Replacement Project in the City of Fairfield and County of SolanoPendingN/A
3342-E
PDF
9/9/2008N/ADiablo Canyon Unit 2 Steam Generator Replacement(Utility Generation Balancing Account Revenue Requirement) 1/1/2009N/A
3340-E / 2954-G
PDF
9/9/2008N/A2009 Gas and Electric Attrition Adjustments (2007 General Rate Case Decision 07-03-044) 1/1/2009N/A
3339-E
PDF
9/8/2008N/ARequest to Consolidate Accounts Under a Single General Service Rate Schedule at 5935 Red Hill Road, Petaluma, CA10/8/2008N/A
3338-E
PDF
9/8/2008N/ASale of Certain Electric Facilities to McEvoy Power, L.L.C.12/18/2008N/A
3328-E
PDF
9/8/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Glass-Biola-Madera 70kV Reconductor Project, County of Madera 10/8/2008N/A
3337-E
PDF
9/4/2008N/AReliability Performance Incentive Mechanism Results For Performance Year 2007 1/26/2009N/A
3336-E
PDF
9/4/2008N/ASale of PG&E's Kern Power Plant Property to World Oil Corp. - Request for Approval Under Section 8511/29/2009N/A
3334-E
PDF
9/4/2008N/ASummary of Hedge Transactions in Compliance with Resolution E-4164 Approving Contract for Procurement of Renewable Energy Resources Between Geysers Power Company, LLC and PG&E and an Associated Hedging Plan10/6/2008N/A
3335-E
PDF
9/3/200827667 - 27671Dynamic Pricing Decision 08-07-045 Dynamic Pricing Memorandum Account to Track Incremental Dynamic Pricing Rates Implementation Expenditures 9/3/2008D.08-07-045
3327-E
PDF
9/3/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Pit #1-Hat Creek #2-Burney 60kV Power Line Reconductor Project, County of Shasta10/15/2008N/A
3333-E
PDF
8/29/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month October 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements10/1/2008D.05-10-042
3332-E
PDF
8/29/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Stockton A #1 60kV Reconductoring Project in the City of Stockton10/23/2008N/A
3331-E
PDF
8/29/2008N/ANotice of Proposed Construction, Pursuant to General Order 131-D, for the Santa Maria-Sisquoc 115kV Reconductor Project, County of Santa Barbara12/12/2012N/A
3330-E
PDF
8/29/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Glenn #2 60kV Power Line Reconductoring Project, Counties of Glenn and Colusa10/28/2008N/A
3329-E
PDF
8/29/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Nicolaus-Marysville 60kV Conductor Replacement Project, County of Yuba9/28/2008N/A
3326-E
PDF
8/27/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Mountain Quarries 60kV Clearance Increase Project, Counties of Placer and El Dorado9/26/2008N/A
3325-E
PDF
8/25/2008N/ANotification of Executed Easement Agreement Between Pacific Gas and Electric Company and the City of Shasta Lake8/25/2008D.08-06-038
3324-E
PDF
8/25/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of 4 Replacement Poles in the Las Palmas Tap 115 Kilovolt Power Line, City of Fresno, County of Fresno9/24/2008N/A
3323-E
PDF
8/22/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Stroud Switch Station-Schindler 70 Kilovolt Power Line Project, County of Fresno9/21/2008N/A
3322-E
PDF
8/21/2008N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with Klondike Wind Power III LLC and a Firming and Shaping Agreement with Bonneville Power Administration 12/18/2008N/A
3320-E / 2950-G
PDF
8/20/200827664 - 27666Credit/Debit Card Payment Option 9/19/2008N/A
3315-E-A
PDF
8/20/2008N/ASupplemental Advice Filing for Advice 3315-E, Proposed Revisions to the California Solar Initiative Program Handbook (2)11/19/2008N/A
3321-E
PDF
8/19/200827659 - 27663Addition of Lamp Sizes to Street and Outdoor Lighting Schedules OL-1, LS-1, LS-210/1/2008N/A
3319-E
PDF
8/15/200827655 - 27658Revision of Electric Schedule E-9 Experimental Residential Time-of-Use Service for Low Emission Vehicle Customers to add Plug-in Hybrid Electric Vehicles9/15/2008N/A
3318-E
PDF
8/14/2008N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with High Plains Ranch II, LLC2/20/2009N/A
3317-E
PDF
8/14/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Potrero-Bayshore-Martin 115 kV Recabling Project (City of San Francisco, County of San Francisco)9/13/2008N/A
3313-E
PDF
8/14/2008N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreement with Topaz Solar Farms LLC.1/29/2009N/A
3193-E-A
PDF
8/12/2008N/ASupplemental Filing for Amendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company11/20/2008N/A
3316-E / 2949-G
PDF
8/11/2008N/AAdd Fourteen New Sites to Hazardous Substance Mechanism9/10/2008N/A
3315-E
PDF
8/8/2008N/AProposed Revisions to the California Solar Initiative Program Handbook (2)11/19/2008N/A
3311-E
PDF
8/8/2008N/AProposed Revisions to the California Solar Initiative Program Handbook12/18/2008N/A
3292-E-A
PDF
8/8/2008N/ASupplemental Filing for Contract for Procurement of Renewable Energy Resources Resulting from PG&E's 2006 Renewables Portfolio Standard Solicitation11/21/2008N/A
3314-E
PDF
8/7/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for Pole Replacement Along the Fulton #1 60kV Line in the City of Healdsburg (County of Sonoma)9/6/2008N/A
3310-E
PDF
8/5/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for Pole Relocations Along the Santa Rosa-Corona 115kV Line in the City of Rohnert Park (County of Sonoma)9/4/2008N/A
3312-E / 2946-G
PDF
8/1/2008N/ARequest for Approval to Transfer Program Year(PY) 2008 Electric Low Income Energy Efficiency (LIEE) Funds8/31/2008N/A
3309-E
PDF
8/1/2008N/ASubmission of the Twelfth Gas Supply Plan (GSP-12) for the California Department of Water Resources (CDWR) Tolling Agreements (October 1, 2008, Through October 31, 2009)10/1/2008D.02-12-069 and D.03-04-029
3308-E
PDF
7/31/2008N/AModifications to Existing Agreement with San Francisco Bay Area Rapid Transit District7/31/2008N/A
3306-E
PDF
7/31/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month September 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements9/1/200805-10-042
3305-E
PDF
7/31/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Plainfield Tap 60kV Power Line Relocation in the County of Yolo 8/30/2008N/A
3307-E / 2944-G
PDF
7/30/200827650 - 27652Minor Revisions to PG&E Form 62-0980 - Distribution Service and Extension Agreement, Declarations - to Add Information and to Update Naming of Exhibits.8/29/2008N/A
3304-E
PDF
7/30/2008N/AProcurement Transaction Quarterly Compliance Filing (Q2, 2008)1/9/2009N/A
3303-E / 2943-G
PDF
7/28/200827646 - 27649PG&E's Compliance Advice Letter for the California Institute for Climate Solutions, Decision 08-04-039Rejected08-04-039, 08-04-054
3302-E / 2942-G
PDF
7/24/2008N/AAdd Two New Sites to Hazardous Substance Mechanism8/25/2008N/A
3301-E
PDF
7/24/200827643 - 27645Revisions to Preliminary Statement EL - Renewables Portfolio Standard Cost Memorandum Account7/24/2008N/A
3300-E
PDF
7/23/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Granite Construction Company 115kV Interconnection Project (County of San Joaquin)8/22/2008N/A
3299-E / 2939-G
PDF
7/22/2008N/AClimateSmart Purchase of Verified Emission Reductions under the Landfill Project Reporting Protocol in Compliance with Decision 06-12-03212/8/2008N/A
3297-E-A
PDF
7/17/200827640 - 27642Supplemental Advice Filing for Advice 3297-E, New Simplified Distribution and Service Line Extension Agreement for Expedited Electric Connection of Agricultural Water Pumps (Form 79-1108)7/17/2008N/A
3246-E-A / 2919-G-A
PDF
7/17/200827636 - 27639Supplement: Eliminate Form 79-865 - Electric and Gas Monitoring Meter Pulse Agreement and Incorporate Minor Revisions to Form 79-1049 - Agreement to Install Applicant Requested Common Facilities8/1/2008N/A
3298-E / 2938-G
PDF
7/16/2008N/ARequest Authorization to Shift Prior Years' Unspent, Uncommitted Gas and Electric Energy Efficiency Funds to Ensure Adequate Funding of Current 2006-2008 Programs11/6/2008N/A
3296-E
PDF
7/16/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 6 Poles on the Kearney-Biola 70 Kilovolt Power Line in the City of Fresno, County of Fresno8/15/2008N/A
3295-E
PDF
7/15/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Lockheed #1 115kV Tap Underbuild Project, City of Sunnyvale, County of Santa Clara8/14/2008N/A
3297-E
PDF
7/14/200827633 - 27635New Simplified Line Extension Letter Agreement For Agricultural Line Extensions for Water Pumps in Response to Declaration of Emergency (Form 79-1108) SupercededN/A
3294-E / 2937-G
PDF
7/11/2008N/ARequest for Authorization to Offer the Home Services Program on a Non-Tariffed Basis RejectedN/A
3197-E-A
PDF
7/11/2008N/ASupplement - Standard Contract For Certain Qualifying Facilities Pursuant To Decision 07-09-040WithdrawnN/A
3293-E
PDF
7/8/200827630 - 27632Request to File New Streetlight Application for Service 8/7/2008N/A
3292-E
PDF
7/1/2008N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's 2006 Renewables Portfolio Standard Solicitation11/21/2008N/A
3256-E-A
PDF
7/1/200827627 - 27629Supplement - Customer Access To Meter Data in Compliance with Decision 06-07-027 5/23/2008N/A
3291-E
PDF
6/30/200827605 - 27622Elimination of Voluntary Time-of-Use Meter Charges Under SmartMeter Billing7/30/200807-09-004
3290-E / 2934-G
PDF
6/30/2008N/AAffiliate Transaction Rules Compliance Plan6/30/2008N/A
3289-E
PDF
6/30/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month August 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements8/1/200805-10-042
3288-E
PDF
6/30/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Wilson-Oro Loma 115 Kilovolt Power Line, County of Merced7/30/2008N/A
3287-E
PDF
6/30/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Reconductoring of the Wilson-Gregg 230 Kilovolt Tranmission Line, County of Madera7/30/2008N/A
3281-E-A
PDF
6/30/200827623 - 27626Supplement to PG&E's Request for Modification of the Market Redesign and Technology Upgrade Memorandum Account for Clarification7/30/2008N/A
3286-E
PDF
6/27/2008N/APower Partners Southwest, LLC, Easements - Request for Approval Under Section 8518/21/2008N/A
3285-E
PDF
6/26/200827584 - 27604Revise the Applicability of Electric Rate Schedules E-7 and EL-7 in Compliance with Decision 08-06-0116/26/200806-08-011
3284-E / 2931-G
PDF
6/17/200827578 - 27583Revisions to Applications for Service, Forms 62-0683, 62-0684, 62-0685, and 62-06867/17/2008N/A
3283-E
PDF
6/17/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Cogeneration National 60kV Interconnection Project in the City of Stockton 7/17/2008N/A
3282-E
PDF
6/17/2008N/ASGIP Equipment Transfer/Removal Request for Approval Under Section 8518/21/2008N/A
3281-E
PDF
6/16/200827568 - 27570PG&E's Request for Modification of the Market Redesign and Technology Upgrade Memorandum Account for Clarification7/16/2008N/A
3280-E
PDF
6/12/2008N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's Power Purchase Agreements with San Joaquin Solar 1, LLC and San Joaquin Solar 2, LLC 12/18/2008N/A
3279-E
PDF
6/12/200827574 - 27577Cleanup to Electric Public Goods Charge Preliminary Statements for Renewables and Research, Development and Demonstration6/19/2008N/A
3264-E-A
PDF
6/11/200827571 - 27573Supplemental Filing of New Form 79-1105 -- Agreement for Unmetered Electric Service to Seasonal Lighting Loads Connected to Festoon Outlets on Pacific Gas and Electric Company's Street Light Facilities7/11/2008N/A
3272-E-A / 2925-G-A
PDF
6/9/200827565 - 27567Supplement: Revision of Form 62-0687- Application for Service, Existing Service - Relocation/Change Service, To Streamline and Expedite Application Process (see also 2925-G-A)6/19/2008N/A
3277-E / 2929-G
PDF
6/4/200827560 - 27564Cleanup of Electric and Gas Preliminary Statements for Customer Energy Efficiency Adjustment Balancing Account [See also: 2929-G]7/4/2008N/A
3278-E
PDF
6/3/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the West Sacramento-Brighton 115kV and Rio Oso-West Sacramento 115kV Reconductoring Projects (Cities of Sacramento and West Sacramento)7/3/2008N/A
3276-E
PDF
5/30/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month July 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements7/1/2008N/A
3275-E / 2927-G
PDF
5/29/200827557 - 27559Close PG&E's Current Pilot Credit Card Program 9/18/2008N/A
3274-E / 2926-G
PDF
5/23/200827554 - 27556June 1, 2008 Gas Core Procurement Rate Changes and Ministerial Revision to Electric Rate Schedule E-CS [SEE ALSO 2926-G]6/1/200806-12-032
3273-E
PDF
5/21/200827551 - 27553Revision to Public Purpose Program Revenue Adjustment Mechanism (PPPRAM)5/21/2008E-4160
3272-E / 2925-G
PDF
5/20/200827548 - 27550Revision of Form 62-0687- Application for Service, Existing Service - Relocation/Change Service, To Streamline and Expedite Application Process (see also 2925-G)SupercededN/A
3257-E-A
PDF
5/20/2008N/ASupplemental Information: Modification of Existing Mass Market Program to Offer Limited Marketing Campaign of Fluorescent Lamp Recycling5/27/2008N/A
3271-E
PDF
5/16/200827543 - 27544Recovery of Outstanding Balance in the Interruptible Load Program Memorandum Account6/15/200807-02-028
3270-E
PDF
5/16/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Gold Hill-Clarksville 115kV and Gold Hill #1 60kV Reconductoring Project in the Cities of Folsom and El Dorado Hills6/15/2008N/A
3165-E-A
PDF
5/16/200827545 - 27547Supplement - Revisions to the Cost Recovery of Incentives Paid to Third Party Demand Response Aggregators Participating in PG&E's Base Interruptible Program (Schedule E-BIP) Resulting from Decision (D.) 07-09-004 6/15/2008N/A
3213-E-A
PDF
5/15/200827536 - 27542Supplement: Proposed Modifications to the Business Energy Coalition (BEC) Program, Rate Schedule E-BEC, in Compliance with Resolution E-41635/15/2008E-4163
3269-E
PDF
5/14/2008N/ANotification of Revised Utility Gas Supply Plan Reporting Requirements for the California Department of Water Resources (CDWR) tollling Agreements in Compliance With D.07-12-0525/14/2008N/A
3268-E / 2924-G
PDF
5/14/200827505 - 27654Revised Household Income Requirements for California Alternate Rates for Energy Program (CARE) and Revised Income Limits for Family Electric Rate Assistance (FERA) Program [SEE ALSO 2924-G]6/1/2008E-3524
3233-E-A
PDF
5/12/2008N/ASupplemental Filing for Pacific Gas and Electric Company's Conformed 2006 Long-Term Procurement Plan 6/26/2008N/A
3267-E
PDF
5/9/200827502 - 27504Revisions to PG&E's Tariff for the Purchase of Eligible Renewable Generation from Small Renewable Generators (E-SRG)5/9/2008N/A
3266-E
PDF
5/2/200827499 - 27501Revisions to PG&E's Community Choice Aggregator (CCA) Service Agreement (Form Number 79-1029)6/2/200808-04-056
3265-E
PDF
5/2/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of the Moss Landing-Crazy Horse 115kV Reconductoring Project, Monterey County6/1/2008N/A
3264-E
PDF
5/2/200827496 - 27498New Form 79-1105 -- Agreement for Unmetered Electric Service to Seasonal Lighting Loads Connected to Festoon Outlets on Pacific Gas and Electric Company's Street Light FacilitiesSupercededN/A
3263-E
PDF
4/30/2008N/A2008 Supplemental Revenue Requirement Determination of the Department of Water Resources (DWR)5/1/2008N/A
3262-E
PDF
4/30/2008N/AProcurement Transaction Quarterly Compliance Filing (Q1, 2008)10/26/2008D.02-10-062, D.03-06-076, D.03-12-062
3261-E
PDF
4/30/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month June 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements6/1/2008D.05-10-042
3260-E
PDF
4/30/2008N/AThird Amendment to the Power Purchase and Sale Agreement for Procurement of Eligible Renewable Energy Resources Between CalRENEW-1 LLC and PG&E11/6/2008N/A
3238-E-B
PDF
4/29/200827331 - 27495Supplement - Electric Rate Changes for Revisions to, and Approvals of, PG&E's 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, CEMA, and Residential Electric Baseline Quantities 5/1/200808-04-025,08-04-026, 08-02-018,08-04-008,07-09-004
3259-E
PDF
4/25/2008N/ADiablo Canyon Unit 2 Steam Generator Replacement (Utility Generation Balancing Account Revenue Requirement) 4/25/2008N/A
3258-E
PDF
4/25/200827318 - 27330Change Name of Cafeteria Style Menu Program to PeakChoice4/25/2008N/A
3257-E
PDF
4/22/2008N/AModification of Existing Mass Market Program to Offer Limited Marketing Campaign of Fluorescent Lamp Recycling5/27/2008N/A
3256-E
PDF
4/22/200827315 - 27317Customer Access To Meter Data in Compliance with Decision 06-07-027 and Revisions to Meter Read Presentation on Customer Bills5/23/2008N/A
3255-E / 2920-G
PDF
4/22/2008N/ARequest for Approval to Transfer Program Year (PY) 2007 Unspent Electric Low Income Energy Efficiency (LIEE) Carryover Funds (see also 2990-G)5/22/2008N/A
3254-E
PDF
4/21/2008N/AContract Amendment and Modification Related to the Implementation of MRTU5/21/2008N/A
3253-E
PDF
4/21/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Bogue 115kV Loop Tower Replacement Project, County of Yuba5/21/2008N/A
3252-E
PDF
4/18/2008N/AConfirmation of PG&E's Nominee to the Committee of its Nuclear Decommissioning Trust Funds7/31/2008N/A
3251-E
PDF
4/18/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Hammer-Country Club 60kV Power Line Relocation in the City of Stockton5/18/2008N/A
3250-E
PDF
4/18/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Gold Hill #1 60kV distribution Installation Project in the County of El Dorado5/18/2008N/A
3249-E
PDF
4/18/2008N/A2007 Vegetation Management Balancing Account 5/18/2008N/A
3248-E
PDF
4/14/2008N/ASubmits Notice of Construction, Pursuant to General order 131-D, for the Construction of Marysville-Nicolaus 60kV Electric Distribution Underbuild Installation in the County of Yuba5/14/2008N/A
3247-E
PDF
4/14/200827309 - 27314Establish the Long-Term Procurement Plan Technical Assistance Memorandum Account (LTMA) in Compliance with Decision 07-12-052, Opinion Adopting Pacific Gas and Electric Company's, and San Diego Gas & Electric Company's Long Term Procurement Plans5/14/200807-12-052
3246-E / 2919-G
PDF
4/7/200827307 - DELETEEliminate Form 79-865 - Electric and Gas Monitoring Meter Pulse Agreement (see also 2919-G)SupercededN/A
3244-E
PDF
4/4/2008N/AClear Lake-Eagle Rock 60kV Pole Replacement Project, Lake County (GO 131-D)5/2/2008N/A
3238-E-A
PDF
4/4/2008DRAFTSupplemental Filing for Electric Rate Changes for Revisions to, and Approvals of, PG&E s 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, and Residential Electric Baseline Quantities5/1/2008N/A
3245-E
PDF
4/1/2008N/AAnnual Adjustments to the Electric Public Goods Charge Funding Obligations in Compliance with Resolution E-37925/1/2008N/A
3243-E
PDF
4/1/2008N/AContracts for Procurement of Renewable Energy Resources Resulting from Power Purchase Agreements between Affiliates of BrightSource Energy, Inc. and PG&EWithdrawnN/A
3242-E
PDF
4/1/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance - May 2008 Submitted Pursuant to D.05-10-042, Opinion on RA Requirements5/1/2008N/A
3241-E
PDF
4/1/2008N/ADiablo Canyon Independent Safety Committee (DCISC) Yearly Compensation Letter5/1/2008N/A
3240-E
PDF
4/1/2008N/AProposed Amendments to Demand Response Aggregator Contracts6/12/2008N/A
3239-E
PDF
3/28/2008N/AProposed Plan for 5% Accuracy Certification Requirements and Testing Procedures for Inverter-Integrated Meters4/28/2008N/A
3238-E
PDF
3/28/2008N/AElectric Rate Changes for Revisions to, and Approvals of, PG&E's 2008 Revenue Requirements Related to DWR, ERRA, MTCBA, and Residential Electric Baseline Quantities.5/1/2008N/A
3237-E
PDF
3/28/2008N/A2008 Energy Resource Recovery Account (ERRA) Trigger Amount Compliance with Decision 04-12-0484/28/2008N/A
3236-E
PDF
3/28/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the Replacement of 9 Poles in Kern-Old River #2 70 Kilovolt Power Line, County of Kern, City of Bakersfield4/27/2008N/A
3235-E
PDF
3/26/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the construction of Table Mountain-Pease 60kV Power Line Disconnect Switch Installation at Live Oak Substation Project, County of Sutter5/25/2008N/A
3234-E
PDF
3/26/2008N/AUpdated Schedules 1 and 3 of the Operating Agreement Between the CDWR and PG&E as Adopted in D.03-04-029 and D.04-10-03512/20/2008N/A
3220-E-A
PDF
3/25/2008N/ASupplement - PG&E's 2007 Cooling Center Pilot Program Report and 2008 Program Proposal4/15/2008N/A
3100-E-B
PDF
3/24/2008N/ASupplemental Filing for PG&E's Standard Contract for the Purchase of Eligible Renewable Generation from Small Renewable Generators2/14/2008N/A
3098-E-B
PDF
3/24/2008N/ASupplemental Filing for PG&E's Standard Contract for the Purchase of Eligible Renewable Generation from Public Water and Wastewater Facilities2/14/2008N/A
3211-E-A
PDF
3/21/2008N/ASupplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Geysers Power Company, LLC and PG&E2/16/2008N/A
3233-E
PDF
3/19/2008N/APacific Gas and Electric Company's 2006 Long-Term Procurement Plan Proceeding Compliance Filing6/26/2008N/A
3214-E-A
PDF
3/19/200827296 - 27306Supplement - Implementation of the Cost Recovery Provisions Supporting the Settlement Agreement Adopted for PG&E's Large Scale Air Conditioning Direct Load Control Program (AC Program) Approved by Decision (D.) 08-02-0093/1/2008N/A
3232-E
PDF
3/18/2008N/ACorrection to the Gas and Electric Allocation of the Self Generation Incentive Program (SGIP) Funding (see also 2913-G)4/17/2008N/A
3231-E
PDF
3/17/200827293 - 27295Consolidation of Approved Changes to Electric Rate Schedules E-SDL4/16/2008N/A
3230-E
PDF
3/14/2008N/AContract for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Wadham Energy L.P. and PG&E7/31/2008N/A
3229-E
PDF
3/12/200827274 - 27292Revisions to Demand Response Program Electric Tariffs to Implement Demand Response On-line Enrollment4/18/2008N/A
3228-E
PDF
3/11/2008N/ASanger-California #1 70kV - Distribution Reconductor (County of Fresno).4/10/2008N/A
3227-E
PDF
3/10/200827268 - 27273Community Choice Aggregation Service (CCA Service) Tariff Revisions in Compliance with Decision 08-02-013.4/9/2008N/A
3225-E / 2910-G
PDF
3/10/2008N/ANotification of the Creation of Two New Affiliates (see also 2910-G)3/10/2008N/A
3226-E
PDF
3/7/2008N/ATable Mountain-Palermo 230kV Reconductoring, County of Butte4/6/2008N/A
3224-E
PDF
3/5/200827236 - 27267Implementation of CPUC Decision (D.) 08-02-002 Order Addressing Pacific Gas and Electric Company's Community Choice Aggregation Net Energy Metering Service Option4/4/2008N/A
3222-E
PDF
3/4/2008N/AMetcalf-Moss Landing 230kV Reconductoring Project, Counties of Santa Clara, Monterey and Santa Cruz4/3/2008N/A
3223-E
PDF
3/3/200827233 - 27235Revisions to Applicability Statement for Street Light Schedule LS-2 Customer-Owned Street and Highway Lighting4/2/2008N/A
3221-E
PDF
3/3/200827204 - 27232Electric Demand Response Tariffs Clean-Up4/2/2008N/A
3218-E
PDF
3/3/200827224 - 27228Modification of Energy Resource Recovery Account (ERRA) Preliminary Statement to Include Independent Evaluator Costs5/1/2008N/A
3220-E
PDF
2/29/200827199 - 27203PG&E's 2007 Cooling Centers Pilot Program Report and 2008 Program Proposal4/15/2008N/A
3219-E
PDF
2/29/2008N/AResource Adequacy (RA) Monthly Compliance Filing for April 20084/1/2008N/A
3037-E-A
PDF
2/29/2008N/A2007 General Rate Case, Restoration of Service Fee Update3/31/2008N/A
3216-E
PDF
2/27/2008N/AGold Hill-Eight Mile 230kV Tower Relocation in the City of Elk Grove3/28/2008N/A
3214-E
PDF
2/27/200827186 - 27196Implementation of the Cost Recovery Provisions Supporting the Settlement Agreement Adopted for PG&E s Large Scale Air Conditioning Direct Load Control Program ( AC Program ) by Decision (D.) 08-02-009SupercededN/A
3202-E-A
PDF
2/27/200827079 - 27185Supplement - Electric Rate Changes for Transmission (TO10), PacifiCorp Settlement, Transmission Access Charge Balancing Account Adjustment, and Air Conditioning Direct Load Control Program3/1/2008N/A
3215-E
PDF
2/26/2008N/ARelocation of Rose Tap 70 Kilovolt Power Line, County of Kern3/27/2008N/A
3217-E
PDF
2/25/200827177 - 27179Tariff Revision for Rate Schedule LS-11/1/2008N/A
3213-E
PDF
2/22/200827161 - 27167Proposed Modifications to the Business Energy Coalition (BEC) Program, Rate Schedule E-BECSupercededN/A
3212-E
PDF
2/22/200827174 - 27176Revision of PG&E's Tariffs to Reflect Temporarily Lower ITCC Rates Due to Tax Law Changes.3/1/2008N/A
3153-E-A / 2885-G-A
PDF
2/20/200827070 - 27078Supplemental Filing-Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Compliance with Decision 07-07-019 [see also 2885-G-A]5/12/2008N/A
3100-E-A
PDF
2/20/200826845 - 26850Implementation of Resolution E-4137 Approving the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from Small Renewable Generators2/14/2008N/A
3098-E-A
PDF
2/20/200826839 - 26844Implementation of Resolution E-4137 Approving the Tariff and Standard Contract for the Purchase of Eligible Renewable Generation from Public Water and Wastewater Facilities2/14/2008E-4137
3211-E
PDF
2/15/2008N/AContract for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Geysers Power Company, LLC and PG&E2/16/2008N/A
3210-E
PDF
2/15/2008N/ANotice of Construction Carneras-Taft 70 Kilovolt Power Line Pole Replacement Project, County of Kern3/16/2008N/A
3209-E
PDF
2/14/2008N/AQualifying Facility Contract Amendments3/15/2008N/A
3208-E / 2903-G
PDF
2/11/2008N/ATransfer Unspent 2007 PG&E ClimateSmart Program Administrative and Marketing Funds to 2008 (see also 2903-G)9/18/2008G-3414
3143-E-A
PDF
2/8/2008N/ASupplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Shiloh Wind Partners, LLC and PG&E.4/10/2008N/A
3207-E
PDF
2/7/200827061 - 27067Proposed Revisions to Electric Preliminary Statement Part M California Alternate Rates for Energy Account (CAREA), and Electric Preliminary Statement Part CZ Distribution Revenue Adjustment Mechanism (DRAM) to Clarify Ratemaking for CARE and FERA3/8/2008N/A
3206-E / 2901-G
PDF
2/5/2008N/ALimited One Time Agreement to Perform Tariff Scheduled Related Work for the County of Placer (see also 2901-G).2/5/2008N/A
3150-E-A
PDF
2/5/2008N/ASupplemental Filing for Procurement of Renewable Energy Resources Resulting from a Power Purchase Agreement between Ausra and PG&E.WithdrawnN/A
3205-E
PDF
2/1/2008N/ADemand Response Contract Amendments3/2/2008N/A
3204-E
PDF
2/1/2008N/ASubmission of the Eleventh Gas Supply Plan (GSP-11) for the California Department of Water Resources (CDWR) Tolling Agreements (April 1, 2008, through September 30, 2008)4/1/2008N/A
3203-E
PDF
1/31/2008N/AMonthly Resource Adequacy (RA) Filing for Compliance-Month March 2008 Submitted Pursuant to Decision 05-10-042, Opinion on RA Requirements2/1/2008N/A
3202-E
PDF
1/30/2008N/AElectric Rate Changes for Transmission (TO10), PacifiCorp Settlement, Transmission Access Charge Balancing Account Adjustment, and Air Conditioning Direct Load Control Program3/1/2008N/A
3201-E
PDF
1/30/2008N/ANotice of Construction, Pursuant to General Order 131-D, for the Lammers-Kasson and Vierra-Tracy-Kasson 115kV Reconductoring Projects2/29/2008N/A
3200-E
PDF
1/30/200827058 - 27060Revisions to LS2 Customer Owned Street and Highway Lighting Tariff for Testing of Energy Efficient Street Light Technologies2/29/2008N/A
3199-E
PDF
1/30/2008N/AProcurement Transaction Quarterly Compliance Filing (Q4, 2007)8/1/2008N/A
3198-E
PDF
1/15/2008N/ANotification of Completed Transfer of Non-exclusive Easement for the Extension of the Lake Almanor Recreational Trail Located in Plumas County in Accordance with D.07-11-0312/26/2008N/A
3197-E
PDF
1/14/2008N/AStandard Contract For Certain Qualifying Facilities Pursuant To Decision 07-09-040WithdrawnN/A
3196-E / 2898-G
PDF
1/11/2008N/ASecond Deviation from PG&E Tariffs for Special Service Request1/11/2008N/A
3195-E
PDF
1/11/2008N/ANotice of the PacifiCorp Settlement (PacifiCorp) and the Transmission Access Charge Balancing Account Adjustment (TACBAA) filings with the Federal Energy Regulatory Commission11/16/2012N/A
3193-E
PDF
1/11/2008N/AAmendment to Standard Offer No. 1 Power Purchase Agreement between Pacific Gas and Electric Company and The Pacific Lumber Company11/20/2008N/A
3194-E
PDF
1/9/200827054 - 27057Revision of Electric Rate Schedule E-DCG Departing Customer Generation, CG5/3/2007N/A
3192-E
PDF
1/7/2008N/AContract Amendments and Modifications Related to the Implementation of MRTU2/6/2008N/A
3191-E
PDF
1/7/2008N/AHerndon-Bullard 115 kilovolt #1 and #2 Reconductoring Project, Counties of Fresno and Madera2/7/2008N/A
3190-E
PDF
1/7/2008N/ASubmits Notice of Construction, Pursuant to General Order 131-D, for the construction of the US Wind Power Tap 60kV Pole Line Relocation Project2/7/2008N/A
3189-E
PDF
1/3/2008N/ATransfer of Annual Performance Test Monitoring From the California Department of Water Resources (DWR) to Pacific Gas and Electric Company (PG&E) Consistent With the Operating Agreement Between DWR and PG&E2/2/2008N/A