2005 ADVICE FILING INDEX - ELECTRIC

Advice No.Date FiledTariff Sheet No.SubjectEffective DateDecision No.
2738-E-A
PDF
12/30/200524287 - 24290Supplemental Filing - Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-0161/1/200605-06-016
2706-E-A
PDF
12/30/200524078 - 24286Supplemental Filing - Change PG&E Electric Rates on January 1, 20061/1/2006E-3956 , E-3956
2763-E
PDF
12/23/200524070 - 24077ERRA - CTC in Compliance with D.05-12-045 - Statutory Method Decision1/1/200605-12-045 , D.05-12-045
2762-E
PDF
12/23/2005N/AG.O. 131-D: Sanger--California Avenue #1 70kV Power Line Relocation, City of Fresno1/22/2006GO 131-D
2761-E
PDF
12/21/2005N/AInterim Agreement Between Port of Oakland and PG&E Regarding 115 kV Port of Oakland-Navy (POON) Line12/21/2005N/A
2760-E
PDF
12/21/200524065 - 24069Schedule NEMFC Legislation Compliance1/1/2006N/A
2759-E
PDF
12/21/200524060 - 24064Schedule NEMBIO Legislation Compliance1/1/2006N/A
2758-E
PDF
12/20/2005N/AAmended Affiliate Rules Compliance Plan1/1/200698-08-035
2757-E
PDF
12/20/200524058 - 24059Specification of Cost Recover Mechanism in Preliminary Statement AN Diablo Canyon Property Tax Balancing Account1/19/200604-05-055
2756-E
PDF
12/20/200524052 - 24057Revised Application for Service Forms 62-0683, 62-0684, 62-0685, and 62-06861/19/2006N/A
2755-E
PDF
12/20/200524049 - 24051New Agreement for Common Special Facilities (Form 79-1049)1/19/2006N/A
2754-E
PDF
12/20/200524046 - 24048Revised Form 62-0980 -- Distribution Service and Extension Agreement Declarations1/19/2006N/A
2753-E
PDF
12/20/200524040 - 24045Revision to Distribution Revenue Adjustment Mechanism and Utility Generation Balancing Account for Pension Contribution for 20061/1/200605-12-046
2752-E
PDF
12/19/200524037 - 24039Form 79-1048 - Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light FacilitiesSupercededN/A
2751-E
PDF
12/15/2005N/A2006 Department of Water Resources (DWR) Revenue Requirement Determination1/1/200605-12-010 , D.05-12-010
2750-E
PDF
12/13/200524031 - 24036Update Customer Energy Efficiency Adjustment Gas Preliminary Statement Part Y and Electric Preliminary Statement P12/13/200605-10-041
2748-E
PDF
12/13/200524021 - 24025Routine Annual Advice Filing for Dedicated Rate Component Series 1 Charge True-up Mechanism1/1/200604-11-015
2749-E
PDF
12/12/200524026 - 24030Revisions to Electric Rule 21-- Generating Facility Interconnections1/1/2006N/A
2746-E
PDF
12/9/200524018 - 24020Adjustment of the Fixed Transition Amount Charges for 20061/1/200697-09-055
2747-E
PDF
12/8/2005N/AAgreement with the City of Mountain View for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities12/8/2005N/A
2745-E
PDF
12/5/2005N/AAllocation of Energy Efficiency Evaluation, Measurement and Verification Budgets, and Corresponding Revisions to Attachment 4 of D. 05-09-043, Incremental Electric Revenue and Gas Funding Requirements for 2006-2008 EE Portfolios1/1/200605-11-011
2744-E
PDF
12/5/2005N/AG.O. 131-D: Fulton 230kV Transmission Line Project1/4/2006GO 131-D
2743-E
PDF
12/1/2005N/AG.O. 131-D: Nicolaus-Marysville 60kV Relocation Project, County of Yuba12/31/2005GO 131-D
2742-E
PDF
11/30/2005N/AMethodology for Calculation of Non-Bypassable Charges for Mountain House Customers (Modesto Irrigation District)12/30/200504-03-036
2741-E
PDF
11/23/2005N/ADe Young Properties Sound Wall Encroachment Agreement - Request for Confirmation of Exemption Under Section 853(b) or, In the Alternative, for Approval Under Section 8511/9/2006N/A
2740-E
PDF
11/21/200524016 - 24017Delete Standard Electric Form 79-1005--Technical Assistance Incentive Application12/21/2005N/A
2739-E / 2679-G
PDF
11/18/200524014 - 24015Residential Natural Gas Vehicle Refueling Program (see also 2679-G and the supplements)2/7/2006N/A
2738-E
PDF
11/14/200524010 - 24013Schedule AG-ICE 1.5 Percent Annual Escalation in Compliance with D.05-06-01612/15/2005d.03-05-068 , 2338 , 2339 , 05-06-016 , D.04.05.069
2737-E
PDF
11/14/2005N/ASection 851 Transaction City of Bakersfield Public Road EasementSupercededN/A
2732-E / 2673-G
PDF
11/9/200523988 - 239932005-2006 Self-Generation Program Memo AcctWithdrawn01-03-073
2736-E
PDF
11/8/200524007 - 24009Issuance Advice Filing for Energy Recovery Bonds Second Series1/1/200604-11-015
2650-E-A
PDF
11/7/200523997 - 24006Supplement - Est. Subaccts in Modified TCBA for Bundled & Direct Access, et al., Reflecting the Ongoing CTC Rev. Requirement Adopted in D.05-02-040, D-05-01-031Withdrawn05-02-040
2735-E
PDF
11/4/2005N/AAnniversary Advice Filing for Dedicated Rate Component True-up Mechanism11/4/200504-11-015
2734-E
PDF
11/4/2005N/AG.O. 131-D: Trinity-Cottonwood 115kV Line Pole Replacement Project, County of Shasta12/4/2005GO 131-D
2666-E-B
PDF
11/3/200523994 - 23996Modify PG&E Electric Preliminary Statement DZ Department of Energy Litigation Balancing Account (DOELBA)10/27/2005E-3941
2733-E
PDF
11/2/2005N/ARequest for Transfer of the Advanced Metering Infrastructure Memorandum Accounts and Disposition and Recovery of the Balances in the Advanced Metering and Demand Response Account and the Gas Advanced Metering Account7/24/2006E-3391 , 05-09-044
2729-E
PDF
11/1/2005N/AUpdate of Service Provider Lists12/1/200597-12-088
2720-E-B
PDF
11/1/200523963 - 23987Implementation of PG&E's "2005-2006 Winter Customer Care and Relief Program" in Compliance with Decision 05-10-04411/1/200505-10-044 , D.05-10-044
2731-E
PDF
10/31/2005N/AG.O. 131-D: Pease-Marysville 60kV Circuit 2 Project, County of Sutter and County of Yuba11/30/2005GO 131-D
2730-E
PDF
10/31/2005N/AG.O. 131-D: Borden-Coppermine 70kV Power Line Relocation for Pacific Ethanol, Inc.11/30/2005GO 131-D
2728-E
PDF
10/28/2005N/AQ3 2005 Quarterly Procurement Report8/7/200703-06-076 , 03-12-062 , 02-10-062
2727-E
PDF
10/24/2005N/ADaylight Saving Time Changes Contemplated Under Federal Energy Policy Act of 200512/31/2005N/A
2726-E
PDF
10/20/2005N/AG.O. 131-D: Valley-Springs - Martel #1 60kV Line #522 Pole Replacement, Calaveras and Amador County11/19/2005GO 131-D
2725-E
PDF
10/19/2005N/AG.O. 131-D: Cascade-Benton-Deschutes 60kV Line Pole Replacement Project, County of Shasta11/18/2005GO 131-D
2724-E
PDF
10/14/200523960 - DeleteDelete Inactive or Obsolete Balancing Accounts from PG&E s Gas and Electric Preliminary Statements11/14/2005N/A
2723-E
PDF
10/14/2005N/AModification of PG&E s Electric Portfolio Gas Hedging Plan as Permitted by Resolution E-395111/1/2005E-3951
2722-E
PDF
10/14/2005N/A2006 Attrition1/10/200604-05-055
2721-E / 2666-G
PDF
10/11/2005N/AExpands LIEE Program for Winter 2005-06WithdrawnN/A
2720-E-A
PDF
10/11/200523948 - 23959Supplement -- Winter ReliefSupercededN/A
2720-E
PDF
10/7/200523941 - 23968Winter ReliefSupercededN/A
2719-E
PDF
10/4/2005N/AG.O. 131-D: Pit #1-McArthur 60kV Project to Replace 18 Poles in Fall River Mills, County of Shasta11/3/2005GO 131-D
2677-E-A
PDF
10/3/200523932 - 23940Supplement - Revisions to Form 62-1198, Creation of New Form 61-0535, and Changes to Gas and Electric Rules 19.1, 19.2, 19.3 [SEE ALSO 2643-G-A]11/1/200505-04-052
2709-E-A
PDF
9/29/200523929 - 23931Supplemental Filing - Routine Quarterly Advice Filing for Dedicated Rate Component Series 1 Charge True Up Mechanism10/1/200604-11-015
2718-E
PDF
9/28/2005N/AContract for Procurement of Renewable Energy Resources Resulting from Power Purchase Agreements Between Global Common and PG&EWithdrawnN/A
2717-E
PDF
9/27/200523923 - 23928Revised Pacific Gas and Electric Company (PG&E) Electric Preliminary Statement CS -- Advanced Metering and Demand Response Account (AMDRA) and New Gas Preliminary Statement BM -- Gas Advanced Metering Account (GAMA)9/22/200505-09-044
2716-E
PDF
9/23/200523917 - 23922Revisions to Schedule ED9/23/200505-09-018
2713-E
PDF
9/23/2005N/AG..O. 131-D: Napa Flood Control 115kV Pole Line Relocation Project, City of Napa10/23/2005GO 131-D
2483-E-A
PDF
9/23/200523906 - 23916Schedule E-MDNL - Municipal Departing New Load7/10/200305-08-035 , 05-07-038 , 03-07-028 , 03-08-076
2715-E
PDF
9/22/2005N/ATIN, Inc. Power Purchase Agreement Restructuring Advice Letter Filing10/24/200598-12-066 , E-3961
2714-E
PDF
9/22/2005N/ASection 851 Filing - Shiloh Wind Project1/12/2006E-3970
2712-E
PDF
9/22/2005N/AG.O. 131-D: Wilson-Merced #1 115kV Power Line and the Wilson-Oro Loma 115kV Power Line Relocations in Merced County10/22/2005GO 131-D
2711-E
PDF
9/21/2005N/AG.O. 131-D: Atlantic-Pleasant Grove Relocation Project, Fountains Shopping Center, City of Roseville, County of Placer10/21/2005GO 131-D
2699-E-A
PDF
9/19/200523759 - 23766Supplement - Combine Electric Preliminary Statement CP Energy Resource Recovery Account Changes from Advice Nos. 2646-E and 2393-E-A9/19/2005N/A
2710-E
PDF
9/15/2005N/AG.O. 131-D: Table Mountain Substation Project, County of Butte10/15/2005GO 131-D
2709-E
PDF
9/15/200523767 - 23905Routine Quarterly Advice Filing for Dedicated Rate Component Series 1 Charge True Up Mechanism10/1/200504-11-015
2708-E
PDF
9/9/2005N/AG.O. 131-D: Sycamore-Notre Dame-Table Mountain 115kV Relocation for the City of Chico, Avenue Street Improvement Project, County of Butte10/9/2005GO 131-D
2707-E
PDF
9/7/200523757 - DeleteRecovery of Charges from Direct Access Customers in Compliance with D.04-02-062, D.04-05-055 and D.04-06-0122/24/200604-06-012 , 04-05-055 , 04-02-062
2433-E-C
PDF
9/2/200523743 - 23756Revision to Proposed Schedule E-MDL Municipal Departing LoadSuperceded03-07-028 , E-3903 , 05-07-038 , 05-08-035 , 03-08-076
2706-E
PDF
9/1/2005N/AAET - Change Electric Rates January 1, 2006SupercededE-3956 , E-3906
2664-E-B
PDF
8/26/200523441 - 23444Revised Preliminary Statements for PG&E Advanced Metering Infrastructure Memorandum Accounts (AMIMA-E and AMIMA-G) -- Gas Prelim Statement BK and Electric Prelim Statement DY [SEE ALSO 2632-G-B]6/30/2005E-3937
2705-E
PDF
8/24/2005N/AG.O. 131-D: for the Reconductoring of Arco-Twisselman 70kV Power Line, County of Kern9/23/2005GO 131-D
2704-E
PDF
8/24/200523740 - 23742Revise Electric Form 79-974--Generating Facility Interconnection Application (Elec. Rule 21)9/21/200500-12-037
2703-E
PDF
8/22/200523678 - 23739Electric Rule 21 - Generating Facilities Interconnections9/21/200500-12-037
2702-E
PDF
8/19/2005N/AFixed Transition Amount Charge True-up Mechanism8/19/200597-09-055
2701-E
PDF
8/18/2005N/ADisposition and Recovery of the Balance in the Advanced Metering & Demand Response Account9/22/2005E-3964
2700-E
PDF
8/18/2005N/AG.O. 131-D: Construction of the Miller Tap #2 115kV Pole Replacement Project in Stanislaus County9/17/2005GO 131-D
2699-E
PDF
8/12/200523673 - 23677Combine Electric Preliminary Statement CP Energy Resource Recovery Account Changes from Advice Nos. 2646-E and 2393-E-ASupercededN/A
2698-E
PDF
8/11/2005N/AG.O. 131-D: Relocation of Kern-Lerdo-Kern Oil 115kV Power Line and Kern-Live Oak 115kV Power Line Relocations, City of Bakersfield9/10/2005GO 131-D
2697-E
PDF
8/9/2005N/ANotice of Federal Energy Regulatory Commission Rate Increase Filing (T08)3/1/2006E-3930
2696-E
PDF
8/4/200523670 - 23672Revisions to Rate Schedule E-DBP to Facilitate Implementation of the San Francisco Pilot Program8/4/2005N/A
2695-E
PDF
8/3/2005N/AResource Adequacy Capacity Contract Language for Pacific Gas and Electric Company s Electric Portfolio9/22/2005N/A
2694-E
PDF
8/1/2005N/AGas Supply Plan 6 (GSP-6) for DWR Tolling Agreements10/4/200502-12-069
2693-E
PDF
7/29/2005N/AProcurement Transaction Quarterly Compliance Filing (Q2, 2005)8/7/200703-12-062 , 03-06-076 , 02-10-062
2692-E
PDF
7/29/2005N/AG.O. 131-D: Construction of the Alviso Pond A-6 Levee Breach Project in the City of San Jose8/25/2005GO 131-D
2691-E
PDF
7/28/2005N/AG.O. 131-D: Manteca-Louise 60kV Relocation for the Woodbridge Ranch Subdivision, City of Manteca, County of San Joaquin8/27/2005GO 131-D
2690-E
PDF
7/28/2005N/AG.O. 131-D: Relocation of Mesa-Sisquoc 115kV Power Line for City of Santa Maria8/27/2005GO 131-D
2689-E
PDF
7/27/2005N/ANotification of Executed Easement Agreement (851) between Pacific Gas and Electric Company and Michael L. Browning and Deborah H. Browning Per D.05-05-0438/26/200505-05-043
2688-E
PDF
7/22/2005N/ANotice of Proposed Construction, Lee 60kV Tap Relocation Project for Paseo West Subdivision, City of Manteca, County of San Joaquin [GO 131-D]8/21/2005GO 131-D
2664-E-A
PDF
7/19/200523441 - 23444*Revised Prelim Statements for PG&E's Advanced Metering Infrastructure Memorandum Accounts (AMIMA-E and AMIMA-G) [SEE ALSO 2632-G-A}6/30/2005E-3937
2687-E
PDF
7/15/2005N/ANotice of Construction Pursuant to GO 131-D, Construction of the Airways Power Line and Substation in Fresno [GO 131-D]5/16/2006GO 131-D
2686-E
PDF
7/15/200523667 - 23669Submission of Electric Schedule E-DCG -- Departing Customer Generation, CG Implementing Modifications per Decision 05-06-0417/15/200505-06-041
2685-E
PDF
7/15/2005N/APG&E's Electric Portfolio Gas Hedging Plan9/22/200504-12-048
2684-E
PDF
7/14/2005N/ANotice of Construction Pursuant to GO 131-D, Lee 60kV Tap Relocation Project for Aqua Pool and Spa, City of Manteca, County of San Joaquin [GO 131-D]8/13/2005GO 131-D
2683-E
PDF
7/14/2005N/ANotice of Construction Pursuant to GO 131-D, Relocation of Salinas-Firestone #2 60kV Power Line, County of Monterey [GO 131-D]8/13/2005GO 131-D
2682-E
PDF
7/8/2005N/ANotice of Construction Pursuant to GO 131-D, for the Construction of the Green Valley - Watsonville 60kV Relocation project in the City of Watsonville8/7/2005GO 131-D
2681-E
PDF
6/30/200523661 - 23666New Pilot Schedule E-BEC--Business Energy Coalition Program7/1/2005Decision 05-01-056
2680-E
PDF
6/29/200523658 - 23660Revision to Electric Preliminary Statement Part CG -- Utility Generation Balancing Account (UGBA)6/29/200501-04-006 , 02-04-060 , 01-07-029
2679-E
PDF
6/27/200523642 - 23657Agricultural Internal Combustion Engine Conversion Incentive Rate (New Schedule AG-ICE, Prelim Statement EA, Forms 79-1020, 79-1021, 79-1022, 79-1023)8/1/200505-06-016
2678-E
PDF
6/21/2005N/AContract for Procurement of Renewable Energy Resources Resulting from PG&E's 2004 Renewables Portfolio Standard (RPS) Solicitation8/25/2005N/A
2677-E
PDF
6/17/200523629 - 23632Revisions to Form 62-1198 and Creation of New Form 61-0535 [SEE ALSO 2643-G]7/18/200505-04-052
2676-E
PDF
6/16/200523624 - 23641Revisions to Residential Gas and Electric Master-Meter and Submeter Applicability [SEE ALSO 2642-G]7/1/200505-05-026
2620-E-A
PDF
6/16/2005N/ASupplemental Filing for Fifth Gas Supply Plan for California Dept of Water Resources (CDWR) Tolling Agreements (April 1, 2005 through Sept. 30, 2005)7/14/200502-12-069
2675-E
PDF
6/15/2005N/ANotice of Construction, Pursuant to General Order 131-D, for the Reconstruction of Oakhurst Tap 115kV Power Line in the County of Madera [GO 131-D]7/15/2005GO 131-D
2674-E / 2641-G
PDF
6/14/200523621 - 23623Line Extension Agreement for Kern County Water Agency (SEE ALSO 2641-G)6/14/2005N/A
2673-E / 2640-G
PDF
6/14/200523618 - 23620Line Extension Agreement for Kern Water Bank Authority (SEE ALSO 2640-G)6/14/2005N/A
2672-E
PDF
6/2/2005N/ANotice of Proposed Construction - Nikolaus-Marysville 60kV Tap Relocation Project for Wheeler Ranch County of Yuba (GO 131-D)7/2/2005GO 131-D
2671-E
PDF
6/2/2005N/ANotice of Proposed Construction - Nikolaus-Marysville 60kV Tap Relocation Project for Lakemont Arboga LLC, County of Yuba (GO 131-D)6/27/2005GO 131-D
2670-E
PDF
6/2/2005N/ANotice of Proposed Construction - Lockeford #1 60kV Tap Relocation Project for Caltrans, County of San Joaquin (GO 131-D)7/2/2005GO 131-D
2669-E
PDF
6/2/200523612 - 23617Revisions to Net Energy Metering Electric Schedules NEMFC, NEMBIO and NEM7/2/2005N/A
2668-E / 2637-G
PDF
6/2/200523609 - 23611Revisions to Form 79-1018 -- Residential Rule 16 Electric/Gas Single Service Extension (SEE ALSO 2637-G)7/2/2005N/A
2667-E / 2636-G
PDF
6/1/200523599 - 23608New Gas and Electric Forms [ALSO SEE 2636-G)7/1/2005GO96A
2647-E-C
PDF
5/27/200523462 - 235982005 Dept of Water Resources (DWR) Revenue Requirement Determination6/1/2005D05-04-025 , E-3933
2666-E-A
PDF
5/25/200523459 - 23461Supplemental Filing -- Establilsh Preliminary Statement DZ -- Department of Energy Litigation Balancing AccountSupercededN/A
2666-E
PDF
5/24/200523456 - 23458Establish Preliminary Statement (Part DZ) -- Department of Energy Litigation Balancing AccountSupercededN/A
2665-E
PDF
5/23/200523450 - 234552005 Critical Peak Pricing Program (Schedule E-CPP) Modifications to Schedule E-CPP in Compliance with Decision 05-04-0536/22/200505-04-053
2663-E
PDF
5/13/200523432 - 23440Revise Income Limits for Family Electric Rate Assistance (FERA) Program6/1/2005D.04-02-057
2662-E / 2631-G
PDF
5/13/200523421 - 23431Revised Household Income Requirements for CARE Program (ALSO 2631-G)6/1/2005E-3524
2647-E-B
PDF
5/13/2005N/ARevised 2005 Department of Water Resources (DWR) Revenue Requirement DeterminationSupercededD05-04-025
2661-E
PDF
5/2/2005N/AProcurement Transaction Quarterly Compliance Filing (Q1, 2005)8/7/2007D.03-06-076 , D.03-12-062 , D.02-10-062
2659-E
PDF
5/2/2005N/AG.O. 131-D: Relocation of a Portion of the Manteca-Louise 60 Kilovolt Power Line in the City of Manteca6/11/2005N/A
2658-E
PDF
5/2/2005N/AG.O. 131-D: Relocation of a Portion of the Tesla-Salado-Manteca 115 Kilovolt Power Line in the City of Manteca6/11/2005N/A
2657-E
PDF
5/2/2005N/AG.O. 131-D: Lee 60 Kilovolt Tap Relocation Project for Tesoro Subdivision, City of Manteca, County of San Joaquin6/1/2005N/A
2597-E-A
PDF
5/2/200523418 - 23420Supplemental Filing PG&E's Request to Track Long Term Resource Acquisition and Development Expenses, in Compliance with Resolution E-39144/21/2005N/A
2660-E / 2629-G
PDF
4/29/2005N/AUpdate of Service Provider Lists (SEE ALSO 2629-G)6/8/2005D.97-12-088
2656-E
PDF
4/29/200523410 - 23417Modify Electric Preliminary Statement Parts CE, CG & CZ; New PS Part DX (FERA/Baseline)5/1/2005D.04-02-057
2655-E
PDF
4/26/2005N/AContracts for Procurement of Renewable Energy Resources Resulting from PG&E's 2004 Renewables Portfolio Standard (RPS) Solicitation7/21/2005E-3946 , D.04-06-014
2654-E / 2626-G
PDF
4/25/2005N/AUpdate the Methodology and Forecast of Long-Term Avoided Cost(s) for the Evaluation of California Energy Efficiency Programs (SEE ALSO 2626-G)5/25/200505-04-024
2652-E / 2625-G
PDF
4/22/200523404 - 23409Revised Application for Service Forms 62-0683, 62-0684, 62-0685 and 62-0686 (SEE ALSO 2625-G)5/22/2005N/A
2647-E-A
PDF
4/21/200523269 - 23403Revised 2005 Department of Water Resources (DWR) Revenue Requirement Determination (ALSO SEE 2647-E-B)Superceded05-04-025
2651-E
PDF
4/15/2005N/AConfirmation of PG&E's Nominees to the Committee of its Nuclear Decommissioning Trust Funds5/26/200587-05-062 , E-3048
2650-E
PDF
4/11/200523258 - 23268Est. Subaccts in Modified TCBA for Bundled & Direct Access, et al., Reflecting the Ongoing CTC Rev. Requirement Adopted in D.05-02-040, D-05-01-0314/11/200505-02-040
2375-E-C
PDF
4/11/200523246 - 23257Revisions to Electric Rate Schedule E-DCG -- Departing Customer Generation7/19/200505-01-035 , 04-01-015 , E-3903 , 05-01-031
2649-E
PDF
4/4/2005N/ANotice of Construction for the Reconductoring of the Henrietta-Gregg 230kV Tower Line, County of Fresno [GO 131-D)5/16/2005GO 131-D
2664-E / 2632-G
PDF
4/1/200523441 - 23444Establish New Memorandum Accounts to Record Advanced Metering Infrastructure Costs (Add New Gas Prelim BK, Electric Prelim DY) (ALSO 2632-G)5/13/2005A.05-03-016
2648-E
PDF
4/1/2005N/ANotice of Federal Energy Regulatory Commission Rate Change for 2005: Transmission Access Charge Balancing Account Adjustment Rate5/26/200505-03-024 , D.05-03-024
2647-E
PDF
4/1/2005N/A2005 Department of Water Resources Revenue Requirement Determination (ALSO SEE 2647-E-B)SupercededD.05-03-024 , 05-03-024
2646-E
PDF
4/1/200523241 - 232452005 Energy Resource Recovery Acct (ERRA), Trigger Amount, in Compliance with Decision 04-01-0505/10/200504-01-050 , D.04-01-050
2645-E
PDF
4/1/2005N/ADiablo Canyon Independent Safety Committee (DCISC) in Compliance with D.88-12-083, dated Dec. 19, 1988, and Res. E-3152 dated May 19895/11/2005D.88-12-083 , E-3152 , 88-12-083
2643-E-A
PDF
4/1/2005N/ASupplement to Updated 2005 Long-Term Procurement Plan10/14/200504-12-048
2644-E
PDF
3/30/2005N/AAnnual Adjustment to the Electric Public Purpose Program Funding Obligations in Compliance with Resolution E-37921/1/2005E-3792
2643-E
PDF
3/25/2005N/AUpdated 2005 Long-Term Procurement Plan10/14/200504-12-048
2642-E
PDF
3/25/2005N/ANotice of Proposed Construction -- Templeton-Atascadero-San Luis Obispo 70kV Power Line Re-Rate in the City of Atascadero, County of San Luis Obispo5/4/2005GO 131-D
2641-E
PDF
3/22/2005N/ANotice of Proposed Construction - Shiloh I -- 230kV Interconnection, Montezuma Hills, Solano County5/2/2005GO 131-D
2640-E
PDF
3/11/2005N/AMoss Landing-Salinas No. 1 and 2 115kV Power Line Reconductoring in Monterey County (GO 131-D)4/20/2005GO 131-D
2637-E
PDF
3/9/200523238 - 23240Revisions to Electric Streetlight Schedule LS-1 for Wood Pole Replacement4/18/2005GO96A
2636-E
PDF
3/3/2005N/A2004 Vegetation Management Balancing Account4/12/200500-02-046
2635-E
PDF
2/28/2005N/AAmortization Proposal for the Unrecovered Nuclear Decommissioning Charges & Public Purpose Program Charges Attributable to Departing Load Customers2/28/2005E-3903
2043-E-B
PDF
2/28/200523235 - 23237Extend the Closing and Expiration Dates of Schedule E-DEPART and Remove Schedule E-EXEMPT1/27/2005E-3903
2633-E-A
PDF
2/25/200523231 - 23234Revisions to Electric Preliminary Statement CS -- Advanced Metering and Demand Response Account (AMDRA)2/24/200503-03-036
2626-E-B
PDF
2/25/200523074 - 23230Supplemental Filing - Rate Schedule Tariff Sheets Supporting the Issuance Advice Filing for Energy Recovery Bonds3/1/200504-11-015
2634-E
PDF
2/24/2005N/AReinstatement of Dividends [SEE ALSO 2614-G]4/5/200504-05-055
2633-E
PDF
2/24/200523070 - 23073Revisions to Electric Preliminary Statement CS -- Advanced Metering and Demand Response Account (AMDRA)2/24/200503-03-036
2632-E
PDF
2/23/2005N/ADuke Energy Marketing Americas Tolling Agreement4/7/2005N/A
2626-E-A
PDF
2/18/2005N/AEnergy Recovery Bonds -- Rate Tables Per 04-11-0153/1/200504-11-015
2631-E
PDF
2/15/2005N/AUtility Specific Balancing Accts for Permanent Allocation of the 2004 Dept of Water Resources Revenue Requirement Pursuant to D.04-12-0142/15/200504-12-014
2630-E
PDF
2/14/200523066 - 23069Community Choice Aggregation (CCA) Svc (D.04-12-046) Implementation Costs & Cost Responsibility Surchge Balancing Accts (Elec Prelim Parts DU and DV)2/14/200504-12-046
2629-E
PDF
2/14/200523058 - 23065Community Choice Aggregation (CCA) Service (D.04-12-046) Implementation of Interim CCA Information Svc (Sched E-CCAINFO, Forms 79-1030 and 79-1031)2/14/200504-12-046
2628-E
PDF
2/14/200522897 - 23057Community Choice Aggregation (CCA) Svc (D. 04-12-046) Revisions to PG&E's Rate Schedules, Rules and Standard Forms for Implementation of Interim CCA2/14/200504-12-046
2627-E
PDF
2/14/200522891 - 22895Revisions to PG&E's Electric Rule 21 -- Generating Facility Interconnections, Adjustment of Sunset Date1/1/200504-03-017
2625-E
PDF
2/8/200522879 - 22882Establish New Prelim Statement for the Energy Recovery Bond Departing Load Memorandum Acct Complying With Energy Recovery Bond Decision3/1/200504-11-015
2626-E
PDF
2/7/200522885 - 22890Issuance Advice Filing for Energy Recovery Bonds3/1/200504-11-015
2624-E
PDF
2/7/200522875 - 23404Establish New Prelim Stmnt for Energy Recovery Bond Balancing Acct, Energy Recovery Bond Bal. Acct Chrge Complying with Energy Recovery Bond Decision3/1/2005N/A
2623-E
PDF
2/7/200522751 - 234492005 Demand Response Programs - Addition of Elec Sched E-20/20, Revisions to its Current Demand Response Electric Tariffs and Associated Agreements3/19/2005N/A
2622-E
PDF
2/4/2005N/AAddition of Five New Sites to Hazardous Substance Mechanism [SEE ALSO 2608-G]3/16/200594-05-020
2621-E
PDF
2/4/200522744 - 22746Rate Reduction Bonds -- Recovery of Franchise FeesRejectedN/A
2620-E
PDF
2/1/2005N/AFifth Gas Supply Plan for the California Dept. of Water Resources (CDWR) Tolling Agreements (April 1, 2005 through September 30, 2005)Superceded02-12-069
2619-E
PDF
1/31/2005N/AProcurement Transaction Quarterly Compliance Filing, 4th Quarter 20041/31/200502-10-062
2618-E
PDF
1/31/200522728 - 22743Revision and Cancellation of PG&E's Gas and Electric Sample Forms [SEE ALSO 2607-G]3/12/2005GO96A
2617-E
PDF
1/28/200522710 - 22727Modification of Balancing Account Language Pursuant to Resolution E-39063/9/2005E-3906
2616-E
PDF
1/21/2005N/APG&E's Value of Service Study and Proposed Budget in Compliance with Decision 04-10-0344/22/200504-10-034 , E-3922
2568-E-A
PDF
1/20/200522704 - 22709Revisions to Gas and Electric Rules 9, 17, 17.1 and 17.2 in Compliance with Resolution G-3372 [SEE ALSO 2581-G-A]1/13/2005G-3372
2615-E
PDF
1/18/2005N/AUpdated 2005 Short-Term Procurement Plan1/18/2005N/A
2614-E
PDF
1/14/200522648 - 22703Revisions to the Names of Electric Rate Schedules E-NET-- Net Energy Metering Svc and E-BIO-- Net Energy Metering Svc for Biogas Customer-Generators2/23/2005N/A
2613-E
PDF
1/12/200522645 - 22647Revisions to Electric Preliminary Statement Part K -- Energy Commission Surcharge1/14/200504-1117-02
2612-E
PDF
1/11/2005N/ANotice of Construction -- U.C. Davis 60 kV to 115 kV Conversion Project, City of Davis, County of Yolo (GO 131-D)2/21/2005GO 131-D
2611-E
PDF
1/11/2005N/AKern Canyon-Magunden-Weedpatch 70 kV Power Line Relocation for Tract 6000 in the City of Bakersfield, County of Kern (GO 131-D)2/21/2005GO 131-D
2610-E
PDF
1/11/2005N/AKearney-Biola 70 kV Power Line Relocation for Tract 4544 in the City of Fresno, County of Fresno (GO 131-D)2/21/2005GO 131-D
2609-E
PDF
1/11/2005N/ARelocation of a Portion of the Existing Coppermine-Tivy Valley 70 kV Power Line in the City of Clovis, County of Fresno (GO 131-D)2/21/2005GO 131-D
2608-E
PDF
1/10/2005N/A2004 Electric Refund Plan -- Electric Deferred Refund Account (EDRA)2/19/200596-12-025
2607-E
PDF
1/4/200522642 - 22644Restoration Improvement Memorandum Account -- 2003 General Rate Case (Preliminary Statement Part DS)1/1/200304-10-034
2606-E
PDF
1/3/2005N/ATri-Dam Power Purchase Agreement4/7/2005E-3925