Manufactured Gas Plants

Former Sacramento Manufactured Gas Plant

History:

Former Sacramento MGP around the early 1900s

The Sacramento MGP was in operation between 1873 and 1930 and was used to supply the area with gas to light and heat local homes and businesses. After being maintained on standby through World War II and the 1950s, the MGP was permanently decommissioned and demolished in 1961.

PG&E's site investigation in the 1990s resulted in an approved Remedial Action Plan (cleanup) to remove impacted soil above the groundwater table, install a cap to protect against public exposure to gas plant residues in deeper and inaccessible soils, and operate a system to remove and treat groundwater at the site, all of which were successfully implemented.

Although the groundwater treatment system continued to operate effectively, modeling showed that it could take several hundred years to achieve stringent water quality objectives. As a result, PG&E evaluated options to more quickly reach groundwater goals. The PG&E remediation team identified In-Situ Soil Stabilization and Solidification (ISSS) technology as the best alternative to accelerate groundwater cleanup.


Overview:

In July 2011, DTSC approved PG&E’s Remedial Action Plan which recommended ISSS of contaminated material within the groundwater as an enhancement to the groundwater remedy. While the use of ISSS for an MGP site is new to California, it has been proven effective throughout the United States. Remediation work utilizing ISSS began in spring 2012 and was completed in November 2012. This technology involved combining a cement-based mix, which included activated carbon, into the soil using large diameter augers and shallow bucket mixing to treat impacted soil to a depth of up to 45 feet below existing ground surface. This mix binds together the contaminated soil to hold and immobilize the contaminants and allow clean groundwater to flow around the contaminated soil. In early 2013, a low permeability cap was placed over the final surface to prevent rainwater infiltration into underlying soils.

Groundwater extraction and on-site treatment and groundwater monitoring will continue for approximately 5 years, when it is expected that groundwater goals will be met. The groundwater treatment system will be shut down and groundwater monitoring will continue for an additional 2 years to demonstrate consistent long-term achievement of groundwater goals, at which time PG&E will request site closure from DTSC. To maintain the cap and groundwater wells in good condition the site cannot be utilized in any way that would allow for traffic or parking.

Benefits:

  • Cleanup and restoration of property
  • Long-term protection of the surrounding community

Sustainability:

Sustainable practices are important to PG&E; we try to reduce our carbon footprint on environmental remediation projects, to the greatest extent possible. On this project, the technology was a sustainable remediation solution. All soil remained on-site; only debris was removed. Overburden soil (that did not need to be stabilized), was excavated, stockpiled and managed on-site for re-use. Most of the contaminated material is contained on site, within the stabilized columns. These actions allowed PG&E to conserve landfill space and significantly reduce the truck traffic that would be required to haul away and to import soil.

Additional Resources:

News:

All MGP Locations
Chico Oakdale San Rafael
Colusa Oakland Santa Cruz
Daly City Oroville Santa Rosa
Eureka Red Bluff Selma
Fresno - 1 Redding St. Helena
Fresno - 2 Redwood City Stockton
Hollister Sacramento -1 Tracy
Lodi Salinas Turlock
Madera San Francisco - Adjacent To Potrero Vallejo
Marysville - 1 San Francisco - Beach Street Watsonville - 1
Merced San Francisco - Fillmore Watsonville - 2
Modesto - 1 San Francisco - North Beach Willows
Monterey San Francisco - Potrero Woodland
Napa San Luis Obispo - 1
  • On-Bill Financing
  • Commercial building incentives