2011 SGIP Handbook and Forms
These forms should be used by anyone applying to the SGIP in 2011.
Handbook and Process Overview
2011 Self-Generation Incentive Program Handbook (PDF, 2.4 MB) – 11/14/11
Step 1: Reservation Request
1a. Gather and complete the required documents
- Proof of Utility Service
All Applicants must submit a copy of a recent electric or gas utility bill. For new construction, the Applicant must receive confirmation from the serving utility that the Host Customer Site is within the Program Administrator's service territory.
- 12-month Electric Load Documentation
To confirm that participating distributed generation systems will not exceed the capacity of the Host Customer's previous 12-month peak (maximum) electrical demand, all applications must include a copy of the previous 12-months of energy consumption including maximum demand and/or kWh consumption. If the system is new or expanded construction, as per Section 2.5.6.4, provide proof of projected load that will satisfy the proposed generation system including but not limited to a document that details the building systems electrical load, hours of use for the indicated building systems, and the total projected kWh consumption per year.
- Proof of Adequate Renewable Fuel Resource (for Level 2 applications, except wind turbines
When applicable, applications must include an engineering survey or study confirming the on-site Renewable Fuel (i.e., adequate flow rate) and the generating system’s average capacity during the term of the Project’s required warranty/maintenance period.
Waste Heat Emission Worksheet (XLS, 44 KB) (For conventional CHP projects) – 11/14/11
Residential Waste Heat Emissions Worksheet (XLS, 44 KB) (For conventional CHP projects) – 11/14/11
Additional Documents For Directed Biogas Customers Only
- Gas Injection Qualification
Documentation that approves the Directed Biogas Renewable Fuel provider to inject the renewable fuel into the utility pipeline local to the renewable fuel source.
- Revenue Grade NGOM & Gas Meter Confirmation
Confirmation that the project is designed to include revenue grade gas meters at both the project site and point of Directed Biogas fuel injection.
- Forecasted Fuel Consumption
Application must include documentation of the forecasted fuel consumption of the generator over the life of project.
- Directed Biogas Renewable Fuel Attestation – System Owner (PDF, 55 KB) (For directed biogas projects)
Attestation letter from the System Owner of its intent to notionally procure Renewable Fuel.
- Directed Biogas Renewable Fuel Attestation – Fuel Supplier (PDF, 19 KB) (For directed biogas projects)
Attestation from the fuel supplier that the fuel meets currently applicable Renewable Portfolio Standard eligibility requirements for biogas injected into a natural gas pipeline.
2011 Reservation Request Application Form and Checklist (XLS, 134 KB) – 11/14/11
Step 2: Project Advancement Milestone
2a. Gather and complete the required documents
- Copy of RFP for Public Entities
Public Entities must submit a copy of Request for Proposals (RFP), Notice to Invite Bids, or similar solicitation issued for the installation, lease and/or purchase for systems proposed for the SGIP. The RFP must include sufficient project details such as the scope of work, schedule, terms, budget, and/or generating system components desired. For Public Entities not issuing an RFP, alternative documentation such as an executed letter of intent to engage with a contractor on the Host Customer letterhead, an executed contract/agreement for system installation/lease, an equipment purchase order, or alternate system ownership agreement must instead be submitted within 60 calendar days of the date the Conditional Reservation Letter.
- Copy of Executed Contract or Agreement for Installation
All SGIP program participants must include, with their Proof of Project Milestone package, a copy of their executed contract for purchase and installation of the system, and/or alternative System Ownership agreement (such as a Power Purchase Agreement). The contract/agreements must be legally binding and clearly spell out the scope of work (quantity of panels/inverters, panel type, inverter type, etc.), terms, total eligible system price, and warranty. All agreements must be signed by appropriate representatives (Host Customer, Installer, and/or System Owner) who are a party to the agreements and the SGIP reservation.
Waste Heat Emission Worksheet (XLS, 44 KB) (For conventional CHP) – 11/14/11
Residential Waste Heat Emissions Worksheet (XLS, 44 KB) (For conventional CHP) – 11/14/11
Renewable Fuel Affidavit (PDF, 25 KB) (For onsite biogas projects) - 11/14/11
Additional Documents For Directed Biogas Customers Only
- Copy of Executed Renewable Fuel Contract
The following criteria must be included in the contract:
- Contract should at a minimum include term (minimum of 5 years), cost, amount of renewable fuel injected on a monthly basis for the length of the contract, address of renewable fuel facility, location of pipeline injection site, name of pipeline owner, and facility address of Host Customer.
- The SGIP PA has the right to audit & verify Customer Generator’s consumption of renewable fuel consumption upon request over the life of the contract.
- The Host Customer will consume the contracted renewable fuel for the sole purpose of fueling the SGIP Project.
- The contract includes a forecast for at least 75% of the system’s anticipated fuel consumption. One possible schedule:
| Starts | Ends | MMBtu/Month | MMBtu/year |
|---|
| Period 1 | date | date | X | M |
| Period 2 | date | date | Y | N |
| Period 3 | date | date | Z | O |
- The contract must include a true-up mechanism. The supplier & customer will handle variations in actual consumption vs. the contract as follows:
- True-ups will occur quarterly, or as otherwise specified, based on actual consumption of the system over the preceding quarter.
- Customer and Renewable Fuel supplier will agree to true up based on actual deliveries of renewable fuel. Note that the fleet of SGIP systems will have its own revenue-grade, electric NGOM and gas meters that are accessible via internet by the Program Administrator.
- If less on-site fuel is consumed than renewable fuel is nominated into the pipeline, then parties can agree to a financial make-whole provision.
- If more on-site fuel is consumed than Renewable Fuel is nominated into the pipeline, then parties can agree to a make whole provision, such that Customer Generator consumes at least 75% renewable fuel, as measured annually, per SGIP Handbook section 2.6.1
2b. Download, complete and mail the Proof of Project Milestone Checklist with all required documents above
Proof of Project Milestone Checklist (PDF, 37 KB) – 11/14/11
3a. Gather and complete the required documents
Final Project Cost Breakdown Worksheet – 11/14/11
Final Project Cost Affidavit (PDF, 30 KB) - 11/14/11
- Substantiation of Load (for new construction or expansion)
For new construction Projects that submitted a calculated future load, Applicants must submit documentation verifying forecasted load has materialized and can be demonstrated.
- Substantiation of Renewable Fuel Source
For Projects where the Host Customer, Applicant or System Owner provided Renewable Fuel resource estimates, applications must include documentation demonstrating that the Renewable Fuel resource has materialized.
- Revised Sizing Calculation (if applicable)
When applicable, the Applicant must submit a thorough description of any changes that have occurred in the system design effecting size or incentive amount since the initial application submittal. If funding is not available the Applicant cannot increase the reserved incentive amount regardless of the changes to the proposed generating system.
Revised Waste Heat Emission Worksheet (XLS, 44 KB) (if applicable) – 11/14/11
Residential Waste Heat Emissions Worksheet (XLS, 44 KB) (For conventional CHP) – 11/14/11
- Final Fuel Cleanup Skid Cost Documentation (Renewable Fuel Cells)
When applicable for Renewable Fuel Projects, Applicants must submit documentation substantiating the fuel cleanup skid cost.
- Final Air Permit Documentation (Fuel Cells)
For those technologies that require an air permit, Applicants must submit a copy of the final documentation indicating compliance with all applicable air pollution regulations. Typically, this is a Permit to Operate issued by the local air district.
Additional Documents For Directed Biogas Customers Only
- Supplier Renewable Fuel Documentation
Documentation from the supplier showing that the fuel is renewable and that it meets the quality standards to be injected into the local natural gas pipeline.
- Proof of Renewable Fuel Contract Commencement
Documentation (e.g. one month fuel invoice) showing that the contract has commenced and the supplier has begun nominating the renewable fuel into the pipeline. The project will be given up to one-year from the date the Incentive Claim was received by the SGIP PA for commencement of the contract. However, no incentive will be paid until the contract has commenced.
- Renewable Fuel Metering Specifications
Make, model, specifications and serial number of installed revenue grad electric NGOM and gas meters.
Incentive Claim Form and Checklist – 11/14/11
Mailing Address
Regular Address
PG&E Solar and Customer Generation - SGIP
PO Box 7433
San Francisco, CA 94120
Overnight Address
PG&E Solar and Customer Generation – SGIP
245 Market Street, MC N7R
San Francisco, CA 94105-1797