Industrial Businesses—Money–Back Solutions

Find Rebates Fast: The Money Back Tool

moneyback tool

Need a quick way to find industrial-related savings? Use the Money Back Tool to instantly see a list of Office Building rebates, and how much you could be saving.

Ready to Apply Now?

Apply online >>
Download a rebate application >> (PDF, 1 MB)


Save More Over Time: Incentives

Businesses can save even more with incentives*: payments that you can receive for using energy-efficient products in new projects. When you’re eligible for an incentive, PG&E will work with you to create a customized energy-efficiency plan that includes technical advice, onsite energy audits and more.

Here's how it works:

  • Contact us to see if you're eligible:
    Talk with your PG&E account manager
    Call the Business Customer Service Center at 1-877-341-4743

  • Schedule a site visit with PG&E.
    Discuss an Energy Audit.

  • Develop your project with PG&E's wide range of resources and services.

*To be eligible for an incentive, businesses must submit a complete application form and receive PG&E approval before making any purchases.

Case Studies, Facts Sheets and More!

Shedding Load During Demand Response Events

Industrial Refrigeration

  • Pre-cool, then float or cycle refrigeration. Certain products can safely float for hours.
  • Turn down, turn off or cycle evaporator and condenser fans, some or all compressors, and non-essential motors.
  • Alternate cooling methods between cold storage areas to lower simultaneous demand.

Manufacturing Facilities

  • Turn off all motors, vertical lifts, and other non-essential process and pumping equipment.
  • Reduce or reschedule production to avoid unnecessary use of compressed air.
  • Turn off or turn down chillers and reset chilled water temperature.
  • Adjust variable speed drive controls to reduce load from fans, pumps, and chillers.
  • Reduce or reschedule production.
  • Shift melting (kilns), finishing (grinders) and other tasks to either before or after an event, or to another day.
  • Pre-cool, then float or cycle refrigeration.
  • Delay use of scrap grinders, bailing, and other non-essential equipment.
  • Stockpile inventory prior to an event, and then stop production during the event.
  • Move batch and continuous processes to either before or after an event, or to another day.
  • Produce extra product a day ahead, and do only packaging on the event day.

Mineral and Chemical Facilities

  • Turn off vertical lifts, conveyor belts, crushers and non-essential process and pumping equipment.
  • Stockpile or overproduce inventory prior to an event, then shut down production and resume operations after the event.
  • Move batch and continuous processes to either before or after an event, or to another day.
  • Produce extra product day ahead, and do only packaging or transport on the event day.
  • Reduce, slow down, or shut down operations completely.
  • Carbon Calculator
  • High-Tech Facilities
  • Enroll in e-bills