Search Pipe Ranger

Physical Pipeline Capacities
As of February 11, 2012
(Receipt Point Capacity, MMcf/d)
  February 11, 2012 February 12, 2012
Redwood Path1
Redwood Path Capacity 2,124 2,124
From Gas Transmission Northwest 2,180 2,180
From Ruby 1,500 1,500
Baja Path
Baja Path Capacity2 873 873
From KRGT - HDL 282 282
From KRGT - Daggett 375 375
From Southern Trails 120 120
From El Paso Natural Gas 1,140 1,140
From Transwestern 400 400
Off-System
To SoCalGas 300 300
To KRGT - HDL 282 282
1As-available volumes may be reduced below this level to accommodate Wild Goose Storage and Lodi Gas Storage withdrawal volumes.

2Aggregated total from all interconnects is limited to the Baja path capacity shown.

Pipeline Maintenance News details maintenance events on CGT's backbone transmission pipelines and the corresponding forecast capacity reductions on the Redwood and Baja paths. Physical Pipeline Capacity shows daily physical capacity at the various interconnections to CGT.