(Receipt Point Capacity, MMcf/d)
  October 24, 2014 October 25, 2014
Redwood Path1
Redwood Path Capacity 2,160 2,160
From Gas Transmission Northwest 2,180 2,180
From Ruby 1,500 1,500
Baja Path
Baja Path Capacity2 500 500
From KRGT - HDL 282 282
From KRGT - Daggett 375 375
From Southern Trails 120 120
From El Paso Natural Gas 1,140 1,140
From Transwestern 365 365
Off-System
To SoCalGas 630 630
To KRGT - HDL 282 282
1As-available volumes may be reduced below this level to accommodate Wild Goose Storage and Lodi Gas Storage withdrawal volumes.

2Aggregated total from all interconnects is limited to the Baja path capacity shown.